Residential Building Permit in Sandy, Utah
Required for new residential construction, additions, and structural alterations in Sandy.
Verified 2026-06-27 · Source
When you need this permit
- Project valuation over $500
- New construction or structural modification
- Changes to electrical, plumbing, or mechanical systems
Required documents
- Req
Building Plans
Complete construction drawings to scale (floor plans, elevations, sections, structural details). Most Utah jurisdictions now require a single PDF set uploaded through their online permit portal.
- Req
Site Plan
Property survey showing setbacks and building footprint
- Req
Energy Compliance
REScheck or equivalent energy calculation
- Req
Engineered Truss Plans
Sealed truss layouts for new construction
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plan Review | 65% of building permit fee | — |
| Building Permit (valuation < $250,000) | $3,525 | — |
| Building Permit (valuation $250,000-$500,000) | $4,900 | — |
| Building Permit (valuation $500,000-$1,000,000) | $5,900 | — |
| Building Permit (valuation $1,000,000-$2,500,000) | $8,164 | — |
| Building Permit (valuation > $2,500,000) | $9,875 | — |
| State Surcharge | 1% of permit fee | — |
Review timeline
~10–21 business days
Typical estimate — confirm current times with the Sandy building department
Inspection process
- 1
Foundation
Before concrete pour — forms, rebar, anchor bolts
- 2
Framing
After framing, sheathing, and roof — before insulation
- 3
Insulation
After insulation installed, before drywall
- 4
Final
All work complete, ready for occupancy
Tips
- Sandy City has gone paperless — submit all permits and plans digitally through the Cityworks portal.
- Schedule inspections through the Sandy City online system.
- All contractors must be licensed with the State of Utah DOPL.
Frequently asked questions
- How do I apply for a residential building permit in Sandy?
- Sandy City uses a paperless permit system. Submit your application and plans digitally through the Sandy Cityworks portal at sandy.utah.gov. Contact (801) 568-7100 for assistance.
- How long does permit review take in Sandy?
- Sandy does not publish a fixed plan-review turnaround. Across Utah jurisdictions, residential plan review typically runs about 2-4 weeks, but times vary with project scope and department workload — confirm current timelines with the Sandy building department before you submit.
Sources & verification
Key facts verified against official sources. Last reviewed 2026-06-27.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Sandy building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Sandy
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.