Commercial Building Permit — Sandy, Utah · Requirements sheet
Verified 2026-07-19 · Source: https://sandy.utah.gov/260/Building-Permits
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Building Permit in Sandy, Utah
Required for new commercial building construction in Sandy ("New Build" category under the Commercial Permits table of the city's fee schedule), covering new shell buildings, offices, retail, and other commercial structures. Fees are based on total project valuation using a separate Commercial Permits fee table from the residential schedule. Plan review adds 65% of the permit fee and the state adds a 1% surcharge on all building fees, same as residential.
Verified 2026-07-19 · Source
When you need this permit
- New commercial building construction on a permitted, properly zoned lot
- Complete architectural and structural drawings sealed by a licensed design professional
- Site plan showing setbacks, parking, and drainage per Sandy's Planning Division requirements
- Energy code compliance documentation (COMcheck or equivalent) for the adopted IECC
- Fire sprinkler and/or fire alarm plans where required by the adopted IBC/IFC, reviewed separately by the Fire Department
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation / Footing
Before concrete pour — verify excavation, forms, rebar, and anchor bolts per adopted IBC
- 2
Underground / Rough-In (Plumbing, Electrical, Mechanical)
Before backfill and before closing walls or ceilings — all underground and rough-in utilities
- 3
Framing
After framing, sheathing, and rough-in MEP — before insulation or wall cover
- 4
Fire Sprinkler / Fire Alarm
Separate inspection by the Sandy Fire Department where fire suppression or alarm systems are required
- 5
Final
All work complete; Certificate of Occupancy issued upon passing final inspection
See the full Sandy inspection guide — scheduling & re-inspection fees →
Tips
- Commercial permit fees use a separate valuation table from residential — do not use the residential fee tiers to estimate a commercial project's cost.
- Fire sprinkler and fire alarm plan reviews are billed separately by the Fire Department (§314224) in addition to the Building & Safety permit fee.
- Plan review adds 65% to the permit fee and the state adds a 1% surcharge, identical to the residential structure.
- A $500 Sign Permit Bond applies specifically to commercial sign permits, separate from the building permit itself.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Sandy building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Sandy.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Sandy
Commercial Building Permit in other cities
Compare commercial building permit fees across Utah →
Look up this fee in a different city →