Residential Remodel in Sandy, Utah
Required for interior and exterior remodels to existing single-family residences, including kitchen remodels, bathroom updates, and structural alterations. Fee is based on project valuation.
Verified 2026-06-29 · Source
When you need this permit
- Structural modification or significant interior alteration to an existing residential structure
- Load-bearing wall modifications require engineered plans
- Work involving the building envelope (exterior walls, windows, roof) requires permit
Required documents
- Req
Building Permit Application
Submit via Sandy City online permit portal or in person at 10000 Centennial Parkway
- Req
Construction Plans
Floor plan showing scope of work; structural details if load-bearing elements affected
- Opt
Structural Calculations
Required if removing or modifying load-bearing walls or other structural elements
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Remodel — total valuation < $5,000 | $169 | Sandy City 2026 Consolidated Fee Schedule, § 3122 Building Permit Fees, Residential Permits — Remodel |
| Remodel — total valuation $5,000–$10,000 | $254 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Remodel — total valuation $10,000–$20,000 | $296 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Remodel — total valuation $20,000–$100,000 | $430 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Remodel — total valuation $100,000–$250,000 | $514 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Remodel — total valuation $250,000–$1,000,000 | $823 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Remodel — total valuation > $2,500,000 | $908 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Plan Review Fee | 65% of the building permit fee | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| State Building Fee Surcharge | 1% of total permit fee | Sandy City 2026 Consolidated Fee Schedule, § 3122 — state-regulated surcharge |
| Re-Inspection Fee | $70 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
Review timeline
~5–15 business days
Typical estimate — confirm current times with the Sandy building department
Inspection process
- 1
Framing / Rough-In
After framing, blocking, and rough-in MEP — before insulation or wall cover
- 2
Final
All work complete and ready for occupancy
Tips
- Interior-only remodels have a separate fee schedule slightly lower than general remodel fees.
- Cosmetic work (paint, flooring, cabinet replacement without plumbing changes) typically does not require a permit — contact the Building Division to confirm.
Frequently asked questions
- Do I need a permit for a kitchen remodel?
- Yes, if the remodel involves electrical, plumbing, mechanical work, or structural changes. Purely cosmetic work (countertops, cabinet faces, paint) generally does not require a permit.
- What is the difference between a Remodel and a Remodel Interior Only permit?
- Sandy distinguishes between general Remodel and Remodel Interior Only in its fee schedule. Interior Only typically applies when all work is inside the building envelope with no changes to exterior walls, windows, or roof.
Sources & verification
Verified against official sources. Last reviewed 2026-06-29.
- Sandy City Building & Safety Division — official building department
- Sandy City 2026 Consolidated Fee Schedule (PDF)
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Sandy building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Sandy
Get the AI compliance checklist
Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.