How to schedule
Inspections are requested through the building department below.
- Address
- 10000 Centennial Parkway, Sandy, UT 84070
- Phone
- (801) 568-7100
- Office hours
- Mon–Fri 8:00 AM – 5:00 PM
- Website
- Official site
Inspection sequence
Applies to: Single-Family New Construction
- 1
Foundation / Footing
Before concrete pour — verify excavation, forms, rebar, and anchor bolts
- 2
Underground Plumbing
Before backfill — all underground pipes and connections
- 3
Framing
After framing, sheathing, and rough-in mechanical/electrical/plumbing — before insulation or wall cover
- 4
Insulation
Before drywall — verify insulation meets IECC requirements
- 5
Drywall / Sheathing
Before taping or finishing — nail pattern and fire-blocking verification
- 6
Final
All work complete; Certificate of Occupancy issued upon passing final inspection
Applies to: Commercial Building Permit
- 1
Foundation / Footing
Before concrete pour — verify excavation, forms, rebar, and anchor bolts per adopted IBC
- 2
Underground / Rough-In (Plumbing, Electrical, Mechanical)
Before backfill and before closing walls or ceilings — all underground and rough-in utilities
- 3
Framing
After framing, sheathing, and rough-in MEP — before insulation or wall cover
- 4
Fire Sprinkler / Fire Alarm
Separate inspection by the Sandy Fire Department where fire suppression or alarm systems are required
- 5
Final
All work complete; Certificate of Occupancy issued upon passing final inspection
Applies to: In-Ground Swimming Pool
- 1
Pre-Gunite / Shell
Verify rebar, bonding wire, and rough plumbing before concrete shell is applied
- 2
Electrical / Bonding
Verify pool bonding grid, GFCI protection, and underwater lighting
- 3
Barrier / Fence
Pool barrier compliant with ISPSC before pool can be filled
- 4
Final
All systems operational, barrier in place, deck and coping complete
Applies to: Residential Addition
- 1
Foundation / Footing
Before concrete pour if addition requires new foundation work
- 2
Framing
After framing and rough-in MEP work — before insulation or wall cover
- 3
Insulation
Verify insulation meets adopted IECC requirements before drywall
- 4
Final
All work complete; addition approved for occupancy
Applies to: Basement Finish
- 1
Rough-In (Framing, MEP)
After framing and rough-in electrical, plumbing, and HVAC — before insulation or drywall
- 2
Insulation
Verify insulation meets adopted IECC requirements before drywall
- 3
Final
All work complete; space approved for occupancy
Applies to: Commercial Tenant Improvement / Tenant Finish Permit
- 1
Framing / Rough-In (MEP)
After framing and rough-in mechanical, electrical, and plumbing work — before insulation or wall cover
- 2
Fire Sprinkler / Fire Alarm (if applicable)
Separate inspection by the Sandy Fire Department where the scope modifies existing fire suppression or alarm systems
- 3
Final
All work complete; space approved for occupancy under the tenant's use classification
Applies to: Business License Update — Change of Use / Change of Location
- 1
Building & Safety Final Inspection
Scheduled with Building & Safety (801-568-7251) after the update application is filed; a positive final inspection or recommendation is required before an updated license issues
- 2
Fire Department Final Inspection
Scheduled with the Sandy Fire Department (801-568-2938) after the update application is filed; a positive final inspection or recommendation is required before an updated license issues
Applies to: Deck / Patio Cover
- 1
Footing
Before concrete pour — verify footing depth and size
- 2
Framing / Final
Decking, framing, ledger attachment, guard/railing height and spacing
Applies to: Residential Remodel
- 1
Framing / Rough-In
After framing, blocking, and rough-in MEP — before insulation or wall cover
- 2
Final
All work complete and ready for occupancy
Applies to: Residential Solar / PV System
- 1
Rough Electrical
Wiring, conduit, and connections before closing walls or covering junction boxes
- 2
Final / Interconnection
System fully installed, labeled, and ready for utility interconnection approval
Final inspection only: EV Charger / EVSE Permit, Fire Alarm Permit, Fire Sprinkler Permit, HVAC / AC / Furnace Replacement, Reroof, Water Heater Replacement
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-06-29.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Sandy building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Sandy building permits
Get alerts for Sandy
We'll email you when Sandy's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.