Skip to main content
PermitBase

Version history — Sandy, Utah

This is PermitBase’s own verified record for Sandy, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Sandy’s actual law was at that time.

Permanent link to today’s record

/utah/salt-lake-county/sandy/as-of/2026-08-20/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-20Current record
  • 2026-07-30Superseded
    • Sandy, Utah — EV Charger / EVSE Permit fee record updated: Valuation/category-tiered fee — exact base figure not confirmed → $105.00 (flat)
  • 2026-07-22Superseded
  • 2026-07-20Superseded
    • Sandy, Utah — Sign Permit fee record updated: $70 (2025/2026 Approved) → $500
    • Sandy, Utah — EV Charger / EVSE Permit record added
    • Sandy, Utah — Sign Permit record added
  • 2026-07-19Superseded
  • 2026-07-16Superseded
  • 2026-07-02Superseded
    • Sandy, Utah — Single-Family New Construction record added
    • Sandy, Utah — Single-Family New Construction record removed
  • 2026-06-30Superseded
    • Sandy, Utah — permit-type records re-verified (43 updates)
  • 2026-06-27Initial record — coverage of Sandy began