Version history — Sandy, Utah
This is PermitBase’s own verified record for Sandy, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Sandy’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-20Current record
- 2026-07-30Superseded
- Sandy, Utah — EV Charger / EVSE Permit fee record updated: Valuation/category-tiered fee — exact base figure not confirmed → $105.00 (flat)
- 2026-07-22Superseded
- 2026-07-20Superseded
- Sandy, Utah — Sign Permit fee record updated: $70 (2025/2026 Approved) → $500
- Sandy, Utah — EV Charger / EVSE Permit record added
- Sandy, Utah — Sign Permit record added
- 2026-07-19Superseded
- 2026-07-16Superseded
- 2026-07-02Superseded
- Sandy, Utah — Single-Family New Construction record added
- Sandy, Utah — Single-Family New Construction record removed
- 2026-06-30Superseded
- Sandy, Utah — permit-type records re-verified (43 updates)
- 2026-06-27Initial record — coverage of Sandy began