This is PermitBase’s published record for Sandy as of 2026-06-30. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Sandy building permits
VerifiedSandy, Utah — as published 2026-06-30.
Verified 2026-06-29 · Source
Codes adopted
Permit types & fees
Single-Family New Construction
VerifiedRequired for new single-family residential construction in Sandy. Permit fees are based on total project valuation and include plan review at 65% of the permit fee. The state adds a 1% surcharge on all building fees.
Verified 2026-06-29 · Source
Requirements
- New single-family dwelling construction on a permitted lot
- Complete architectural and structural drawings
- Site plan showing setbacks, lot coverage, and drainage
- Energy code compliance documentation (REScheck or equivalent)
- Soils report if lot has special conditions
Required documents
- RequiredBuilding Permit ApplicationSubmit via Sandy City online permit portal or in person at 10000 Centennial Parkway
- RequiredConstruction PlansComplete drawings to scale — site plan, floor plans, elevations, sections, and structural details
- RequiredEnergy Code Compliance DocumentationREScheck or equivalent documentation demonstrating compliance with adopted IECC
- OptionalStructural CalculationsSealed by a licensed Utah PE for projects requiring engineered design
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| New Single-Family Build — total valuation < $100,000 | $2,967 | Sandy City 2026 Consolidated Fee Schedule, § 3122 Building Permit Fees, Residential Permits — Single Family New Build |
| New Single-Family Build — total valuation $100,000–$500,000 | $4,866 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| New Single-Family Build — total valuation $500,000–$1,000,000 | $6,837 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| New Single-Family Build — total valuation $1,000,000–$2,500,000 | $8,569 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| New Single-Family Build — total valuation $2,500,000–$5,000,000 | $10,185 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| New Single-Family Build — total valuation > $5,000,000 | $12,572 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Plan Review Fee | 65% of the building permit fee | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| State Building Fee Surcharge | 1% of total permit fee | Sandy City 2026 Consolidated Fee Schedule, § 3122 — state-regulated surcharge |
| Re-Inspection Fee | $70 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| After-Hours Inspection (after 5 p.m. or holidays/weekends) | $35/hour, minimum $70 (2-hour minimum) | Sandy City 2026 Consolidated Fee Schedule |
Residential Addition
VerifiedRequired for adding livable square footage to an existing single-family home, including room additions, garage conversions, and attached accessory apartment additions. Fee is based on total project valuation.
Verified 2026-06-29 · Source
Requirements
- Addition to an existing single-family or duplex residential structure
- Complete drawings showing existing structure and proposed addition
- Site plan with updated setbacks and lot coverage
- Energy code compliance for new conditioned space
Required documents
- RequiredBuilding Permit ApplicationSubmit via Sandy City online permit portal or in person at 10000 Centennial Parkway
- RequiredConstruction PlansExisting and proposed floor plans, elevations, sections, and structural details
- RequiredEnergy Compliance DocumentationREScheck or equivalent for new conditioned square footage
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Addition — total valuation < $10,000 | $345 | Sandy City 2026 Consolidated Fee Schedule, § 3122 Building Permit Fees, Residential Permits — Addition |
| Addition — total valuation $10,000–$50,000 | $527 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Addition — total valuation $50,000–$100,000 | $1,987 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Addition — total valuation $100,000–$250,000 | $2,867 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Addition — total valuation $250,000–$500,000 | $4,584 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Addition — total valuation $500,000–$1,000,000 | $6,196 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Addition — total valuation $1,000,000–$2,500,000 | $8,614 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Addition — total valuation > $2,500,000 | $11,001 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Plan Review Fee | 65% of the building permit fee | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| State Building Fee Surcharge | 1% of total permit fee | Sandy City 2026 Consolidated Fee Schedule, § 3122 — state-regulated surcharge |
| Re-Inspection Fee | $70 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
Residential Remodel
VerifiedRequired for interior and exterior remodels to existing single-family residences, including kitchen remodels, bathroom updates, and structural alterations. Fee is based on project valuation.
Verified 2026-06-29 · Source
Requirements
- Structural modification or significant interior alteration to an existing residential structure
- Load-bearing wall modifications require engineered plans
- Work involving the building envelope (exterior walls, windows, roof) requires permit
Required documents
- RequiredBuilding Permit ApplicationSubmit via Sandy City online permit portal or in person at 10000 Centennial Parkway
- RequiredConstruction PlansFloor plan showing scope of work; structural details if load-bearing elements affected
- OptionalStructural CalculationsRequired if removing or modifying load-bearing walls or other structural elements
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Remodel — total valuation < $5,000 | $169 | Sandy City 2026 Consolidated Fee Schedule, § 3122 Building Permit Fees, Residential Permits — Remodel |
| Remodel — total valuation $5,000–$10,000 | $254 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Remodel — total valuation $10,000–$20,000 | $296 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Remodel — total valuation $20,000–$100,000 | $430 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Remodel — total valuation $100,000–$250,000 | $514 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Remodel — total valuation $250,000–$1,000,000 | $823 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Remodel — total valuation > $2,500,000 | $908 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Plan Review Fee | 65% of the building permit fee | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| State Building Fee Surcharge | 1% of total permit fee | Sandy City 2026 Consolidated Fee Schedule, § 3122 — state-regulated surcharge |
| Re-Inspection Fee | $70 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
Basement Finish
VerifiedRequired when converting an unfinished basement into habitable living space. Includes framing, electrical, plumbing, HVAC, insulation, and drywall work in the basement area.
Verified 2026-06-29 · Source
Requirements
- Unfinished or partially finished basement being converted to conditioned/habitable space
- Must meet egress requirements per adopted IRC (egress window in each sleeping room)
- Smoke and CO detectors required per adopted IRC
Required documents
- RequiredBuilding Permit ApplicationSubmit via Sandy City online permit portal or in person at 10000 Centennial Parkway
- RequiredBasement Floor PlanLayout showing room use, egress window locations, mechanical/electrical/plumbing rough-in
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Basement Finish — total valuation < $5,000 | $169 | Sandy City 2026 Consolidated Fee Schedule, § 3122 Building Permit Fees, Residential Permits — Basement Finish |
| Basement Finish — total valuation $5,000–$10,000 | $254 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Basement Finish — total valuation $10,000–$20,000 | $296 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Basement Finish — total valuation $20,000–$250,000 | $387 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Basement Finish — total valuation $250,000–$1,000,000 | $611 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Basement Finish — total valuation > $1,000,000 | $781 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Plan Review Fee | 65% of the building permit fee | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| State Building Fee Surcharge | 1% of total permit fee | Sandy City 2026 Consolidated Fee Schedule, § 3122 — state-regulated surcharge |
| Re-Inspection Fee | $70 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
Deck / Patio Cover
VerifiedRequired for new decks, attached patio covers, and covered porch structures attached to or detached from the home. Flat fee regardless of valuation.
Verified 2026-06-29 · Source
Requirements
- New attached or detached deck, porch, or patio cover structure
- Structural drawings if deck is elevated or has complex framing
- Site plan showing location relative to property lines
Required documents
- RequiredBuilding Permit ApplicationSubmit via Sandy City online permit portal or in person at 10000 Centennial Parkway
- RequiredSite Plan and Deck PlansDrawing showing deck dimensions, framing, ledger attachment, and post/footing sizes
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Deck / Patio Permit (flat fee) | $375 | Sandy City 2026 Consolidated Fee Schedule, § 3122 Building Permit Fees, Residential Permits — Deck/Patio |
| Plan Review Fee | 65% of the building permit fee | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| State Building Fee Surcharge | 1% of total permit fee | Sandy City 2026 Consolidated Fee Schedule, § 3122 — state-regulated surcharge |
| Re-Inspection Fee | $70 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
Residential Solar / PV System
VerifiedRequired for rooftop and ground-mount residential solar photovoltaic systems. Two fee tiers based on system size: under 10,000 kW and 10,000 kW or larger (or energy storage systems). Fees are based on total project valuation.
Verified 2026-06-29 · Source
Requirements
- Rooftop or ground-mount PV system installation
- Equipment specifications and installation drawings
- Structural letter or engineering for roof-mounted systems on older homes
- Electrical single-line diagram
- Utility interconnection application (Rocky Mountain Power)
Required documents
- RequiredBuilding Permit ApplicationSubmit via Sandy City online permit portal or in person at 10000 Centennial Parkway
- RequiredElectrical Single-Line DiagramShowing PV array, inverter, disconnect, and utility interconnection
- RequiredPV System Layout PlanRoof plan with module locations, dimensions, and attachment details
- OptionalStructural / Load CalculationsManufacturer specs and, if required, a structural engineer letter confirming roof capacity
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar < 10,000 kW — total valuation < $50,000 | $372 | Sandy City 2026 Consolidated Fee Schedule, § 3122 Building Permit Fees, Residential Permits — Solar <10,000 kW |
| Solar < 10,000 kW — total valuation $50,000–$100,000 | $589 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Solar < 10,000 kW — total valuation $100,000–$250,000 | $1,239 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Solar < 10,000 kW — total valuation $250,000–$500,000 | $1,517 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Solar < 10,000 kW — total valuation $500,000–$1,000,000 | $2,156 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Solar < 10,000 kW — total valuation $1,000,000–$2,500,000 | $2,722 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Solar < 10,000 kW — total valuation > $2,500,000 | $3,446 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Solar >= 10,000 kW or Energy Storage System — total valuation < $50,000 | $553 | Sandy City 2026 Consolidated Fee Schedule, § 3122 Building Permit Fees, Residential Permits — Solar >10,000 kW or ESS |
| Solar >= 10,000 kW or ESS — total valuation $50,000–$100,000 | $638 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Solar >= 10,000 kW or ESS — total valuation $100,000–$250,000 | $1,037 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Solar >= 10,000 kW or ESS — total valuation $250,000–$500,000 | $1,303 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Solar >= 10,000 kW or ESS — total valuation $500,000–$1,000,000 | $2,150 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Solar >= 10,000 kW or ESS — total valuation $1,000,000–$2,500,000 | $3,107 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Solar >= 10,000 kW or ESS — total valuation > $2,500,000 | $3,796 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Plan Review Fee | 65% of the building permit fee | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| State Building Fee Surcharge | 1% of total permit fee | Sandy City 2026 Consolidated Fee Schedule, § 3122 — state-regulated surcharge |
| Re-Inspection Fee | $70 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
HVAC / AC / Furnace Replacement
VerifiedRequired for replacing or installing a new air conditioner, furnace, heat pump, or other HVAC equipment in a residential property. Flat fee.
Verified 2026-06-29 · Source
Requirements
- Replacement of an existing heating or cooling unit
- New HVAC installation in an existing or new structure
- Equipment specifications (model, BTU/ton rating)
Required documents
- RequiredBuilding Permit ApplicationSubmit via Sandy City online permit portal or in person at 10000 Centennial Parkway
- RequiredEquipment SpecificationsManufacturer data sheet for the replacement unit
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| AC / Furnace Replacement (flat fee) | $105 | Sandy City 2026 Consolidated Fee Schedule, § 3122 Building Permit Fees, Residential Permits — AC/Furnace |
| Plan Review Fee | 65% of the building permit fee | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| State Building Fee Surcharge | 1% of total permit fee | Sandy City 2026 Consolidated Fee Schedule, § 3122 — state-regulated surcharge |
| Re-Inspection Fee | $70 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
Water Heater Replacement
VerifiedRequired for replacing a residential water heater (tank or tankless). Flat fee.
Verified 2026-06-29 · Source
Requirements
- Replacement of an existing water heater in a residential structure
- Equipment specifications (model, BTU/gallon rating)
Required documents
- RequiredBuilding Permit ApplicationSubmit via Sandy City online permit portal or in person at 10000 Centennial Parkway
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Water Heater Replacement (flat fee) | $105 | Sandy City 2026 Consolidated Fee Schedule, § 3122 Building Permit Fees, Residential Permits — Water Heater Replacement |
| Plan Review Fee | 65% of the building permit fee | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| State Building Fee Surcharge | 1% of total permit fee | Sandy City 2026 Consolidated Fee Schedule, § 3122 — state-regulated surcharge |
| Re-Inspection Fee | $70 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
Reroof
VerifiedRequired for reroofing an existing residential structure. Flat fee for residential reroof.
Verified 2026-06-29 · Source
Requirements
- Full or partial replacement of roof covering on any structure
- Roofing material specifications
Required documents
- RequiredBuilding Permit ApplicationSubmit via Sandy City online permit portal or in person at 10000 Centennial Parkway
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Reroof (flat fee) | $115 | Sandy City 2026 Consolidated Fee Schedule, § 3122 Building Permit Fees, Residential Permits — Reroof |
| Plan Review Fee | 65% of the building permit fee | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| State Building Fee Surcharge | 1% of total permit fee | Sandy City 2026 Consolidated Fee Schedule, § 3122 — state-regulated surcharge |
| Re-Inspection Fee | $70 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
In-Ground Swimming Pool
VerifiedRequired for new in-ground residential swimming pool construction. Fee is based on total project valuation. A $2,500 inspection bond is also required.
Verified 2026-06-29 · Source
Requirements
- In-ground swimming pool construction
- Site plan showing pool location, setbacks, and fencing plan
- Pool barrier/fencing plan meeting IRC and ISPSC requirements
- Electrical plan for pump, lighting, and bonding
Required documents
- RequiredBuilding Permit ApplicationSubmit via Sandy City online permit portal or in person at 10000 Centennial Parkway
- RequiredSite PlanShowing pool location relative to property lines, house, and utility easements
- RequiredPool Construction PlansStructural and electrical plans for the pool system
- RequiredBarrier / Fence PlanFencing plan meeting ISPSC pool barrier requirements
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| In-Ground Swimming Pool — total valuation < $100,000 | $570 | Sandy City 2026 Consolidated Fee Schedule, § 3122 Building Permit Fees, Residential Permits — Swimming Pool (In-Ground) |
| In-Ground Swimming Pool — total valuation > $100,000 | $965 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| Plan Review Fee | 65% of the building permit fee | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
| State Building Fee Surcharge | 1% of total permit fee | Sandy City 2026 Consolidated Fee Schedule, § 3122 — state-regulated surcharge |
| Swimming Pool Inspection Bond | $2,500 | Sandy City 2026 Consolidated Fee Schedule, § 3122 — inspection bond required at permit issuance |
| Re-Inspection Fee | $70 | Sandy City 2026 Consolidated Fee Schedule, § 3122 |
Sources & verification
Verified against official sources. Last reviewed 2026-06-29.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Sandy building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.