Single-Family New Construction in Sandy, Utah

Required for new single-family residential construction in Sandy. Permit fees are based on total project valuation and include plan review at 65% of the permit fee. The state adds a 1% surcharge on all building fees.

Verified 2026-06-29 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
New Single-Family Build — total valuation < $100,000$2,967Sandy City 2026 Consolidated Fee Schedule, § 3122 Building Permit Fees, Residential Permits — Single Family New Build
New Single-Family Build — total valuation $100,000–$500,000$4,866Sandy City 2026 Consolidated Fee Schedule, § 3122
New Single-Family Build — total valuation $500,000–$1,000,000$6,837Sandy City 2026 Consolidated Fee Schedule, § 3122
New Single-Family Build — total valuation $1,000,000–$2,500,000$8,569Sandy City 2026 Consolidated Fee Schedule, § 3122
New Single-Family Build — total valuation $2,500,000–$5,000,000$10,185Sandy City 2026 Consolidated Fee Schedule, § 3122
New Single-Family Build — total valuation > $5,000,000$12,572Sandy City 2026 Consolidated Fee Schedule, § 3122
Plan Review Fee65% of the building permit feeSandy City 2026 Consolidated Fee Schedule, § 3122
State Building Fee Surcharge1% of total permit feeSandy City 2026 Consolidated Fee Schedule, § 3122 — state-regulated surcharge
Re-Inspection Fee$70Sandy City 2026 Consolidated Fee Schedule, § 3122
After-Hours Inspection (after 5 p.m. or holidays/weekends)$35/hour, minimum $70 (2-hour minimum)Sandy City 2026 Consolidated Fee Schedule

Review timeline

~1030 business days

Typical estimate — confirm current times with the Sandy building department

Inspection process

  1. 1

    Foundation / Footing

    Before concrete pour — verify excavation, forms, rebar, and anchor bolts

  2. 2

    Underground Plumbing

    Before backfill — all underground pipes and connections

  3. 3

    Framing

    After framing, sheathing, and rough-in mechanical/electrical/plumbing — before insulation or wall cover

  4. 4

    Insulation

    Before drywall — verify insulation meets IECC requirements

  5. 5

    Drywall / Sheathing

    Before taping or finishing — nail pattern and fire-blocking verification

  6. 6

    Final

    All work complete; Certificate of Occupancy issued upon passing final inspection

Tips

Frequently asked questions

How long does plan review take for a new home?
Sandy does not publish a specific first-review timeline. A typical new single-family build may take 2–6 weeks for plan review; contact the Building Division at (801) 568-7100 for current turnaround estimates.
Is the plan review fee separate from the building permit fee?
Yes. Sandy charges a plan review fee equal to 65% of the building permit fee, in addition to the permit fee itself. Both are due at permit issuance.

Sources & verification

Verified against official sources. Last reviewed 2026-06-29.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Sandy building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Sandy

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.