This is PermitBase’s published record for West Jordan as of 2026-07-01. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

West Jordan building permits

Verified

West Jordan, Utah — as published 2026-07-01.

Verified 2026-06-29 · Source

Codes adopted

2021 International Building Code (IBC), including Appendices C and J — enforced by West Jordan Building & Safety Division per Design Criteria document (rev. 10/2025); statewide baseline per Utah Code § 15A-2-103; effective through June 30, 20262021 International Residential Code (IRC), including Appendix AQ — West Jordan Design Criteria (rev. 10/2025); continues in force after July 1, 2026 per Utah Code § 15A-2-1032021 International Plumbing Code (IPC) — West Jordan Design Criteria (rev. 10/2025); effective through June 30, 20262021 International Mechanical Code (IMC) — West Jordan Design Criteria (rev. 10/2025); effective through June 30, 20262021 International Fuel Gas Code (IFGC) — West Jordan Design Criteria (rev. 10/2025); effective through June 30, 20262015 International Energy Conservation Code (IECC), residential provisions — West Jordan Design Criteria (rev. 10/2025)2021 International Energy Conservation Code (IECC), commercial provisions — West Jordan Design Criteria (rev. 10/2025)2021 International Existing Building Code (IEBC) — West Jordan Design Criteria (rev. 10/2025); effective through June 30, 20262021 International Fire Code (IFC) — West Jordan Design Criteria (rev. 10/2025)2023 National Electrical Code (NEC) — West Jordan Design Criteria (rev. 10/2025); adopted statewide per Utah Code § 15A-2-103(1)(g)1997 Uniform Code for Abatement of Dangerous Buildings — West Jordan Design Criteria (rev. 10/2025)NOTE: Effective July 1, 2026 — 2024 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC replace the 2021 editions per Utah Code § 15A-2-103 (version effective 7/1/2026); West Jordan design criteria document (rev. 10/2025) predates this transition — confirm with the Building & Safety Division for projects submitted on or after July 1, 2026

Permit types & fees

Residential Building Permit

Verified

Required for new residential construction, additions, and structural alterations in West Jordan. Permit fees are valuation-based using the ICC Building Valuation Data table. Valuation is determined by the current ICC Building Valuation Data published as of July 1 of each year.

Verified 2026-06-29 · Source

Requirements

  • New single-family or multi-family residential construction
  • Additions or structural modifications
  • Conversion of non-habitable space to habitable space
  • Any work requiring plan review under West Jordan City Code Title 10

Required documents

  • RequiredBuilding Permit Application (via West Jordan Public Portal)Submit online at permit.westjordan.utah.gov or follow the Online Building Permit Submittal Instructions PDF
  • RequiredSite PlanDrawn to scale (minimum 1 inch = 20 ft) on 8.5x11 or larger paper, showing property lines, building footprint, setbacks, easements, driveway, and drainage per the West Jordan Residential Site Plan Checklist
  • RequiredConstruction PlansComplete architectural drawings — floor plans, elevations, sections, and structural details
  • RequiredEnergy Compliance DocumentationREScheck or equivalent documentation demonstrating compliance with the adopted IECC
  • OptionalEngineered Truss PlansSealed truss layouts for new construction

Fee schedule

Fee typeAmountNotes
Building Permit — valuation $1–$2,000$60.50 base + $3.70 per each additional $100 (or fraction thereof) over $500West Jordan Consolidated Fee Schedule, Ord. 25-48 (eff. through June 30, 2026, updated March 6, 2026). Valuation determined by ICC Building Valuation Data as of July 1 of each year.
Building Permit — valuation $2,001–$25,000$116.00 base + $16.90 per each additional $1,000 (or fraction thereof) over $2,000West Jordan Consolidated Fee Schedule, Ord. 25-48
Building Permit — valuation $25,001–$50,000$505.00 base + $12.20 per each additional $1,000 (or fraction thereof) over $25,000West Jordan Consolidated Fee Schedule, Ord. 25-48
Building Permit — valuation $50,001–$100,000$810.00 base + $8.45 per each additional $1,000 (or fraction thereof) over $50,000West Jordan Consolidated Fee Schedule, Ord. 25-48
Building Permit — valuation $100,001–$500,000$1,233.00 base + $6.76 per each additional $1,000 (or fraction thereof) over $100,000West Jordan Consolidated Fee Schedule, Ord. 25-48
Building Permit — valuation $500,001–$1,000,000$3,938.00 base + $5.75 per each additional $1,000 (or fraction thereof) over $500,000West Jordan Consolidated Fee Schedule, Ord. 25-48
Building Permit — valuation over $1,000,000$6,803.00 base + $3.80 per each additional $1,000 (or fraction thereof) over $1,000,000West Jordan Consolidated Fee Schedule, Ord. 25-48
Plan Review — Residential40% of the building permit feeWest Jordan Consolidated Fee Schedule, Ord. 25-48. Single Family Residential 'Same-As' (exact copy of previously reviewed plan) = $200 flat.
Plan Review — Multi-Family or Non-Residential65% of the building permit feeWest Jordan Consolidated Fee Schedule, Ord. 25-48. Multi-Family 'Same-As' = 20% of the building permit fee.
Permit Processing Fee$12 per permit issuedWest Jordan Consolidated Fee Schedule, Ord. 25-48
State Surcharge1% of the building permit feeWest Jordan Consolidated Fee Schedule, Ord. 25-48
Re-Inspection / Other Building Inspection$75West Jordan Consolidated Fee Schedule, Ord. 25-48 (Building Inspections — Other Building Inspections, including re-inspection fees)

Electrical Permit

Verified

Required for electrical work in West Jordan including new circuits, panel upgrades, service changes, and new construction wiring. Governed by the 2023 National Electrical Code (NEC) as adopted statewide per Utah Code § 15A-2-103(1)(g).

Verified 2026-07-01 · Source

Requirements

  • New electrical circuits or wiring installations
  • Electrical panel upgrades or replacements
  • Service entrance changes
  • Adding or relocating outlets, switches, or fixtures
  • Generator or solar panel electrical connections

Required documents

  • RequiredBuilding Permit Application (via West Jordan Public Portal)Submit online at permit.westjordan.utah.gov
  • OptionalElectrical Plan / Single-Line DiagramRequired for service upgrades and new construction — panel schedule and circuit layout
  • OptionalContractor LicenseValid Utah electrical contractor license (Utah DOPL) for work not performed by the homeowner

Fee schedule

Fee typeAmountNotes
Electrical Permit (minimum fee)$70Confirmed against the current West Jordan Consolidated Fee Schedule (Ord. 25-48, updated 3/6/2026, eff. through 6/30/2026), Building Permits item 3(c): 'Miscellaneous Minimum Permit (plumbing, electrical, mechanical) — $70.' This is the flat minimum fee for electrical permits; larger or more complex projects are billed per the valuation-based building permit table (item 3a) instead. Verified live 2026-07-01.
Permit Processing Fee$12 per permit issuedWest Jordan Consolidated Fee Schedule, Ord. 25-48
State Surcharge1% of the building permit feeWest Jordan Consolidated Fee Schedule, Ord. 25-48
Re-Inspection$75West Jordan Consolidated Fee Schedule, Ord. 25-48 — Other Building Inspections

Plumbing Permit

Verified

Required for plumbing installations, alterations, and repairs in West Jordan including water heaters, fixture additions, and gas line work. Governed by the 2021 International Plumbing Code (IPC) as adopted per Utah Code § 15A-2-103 (2024 IPC effective July 1, 2026).

Verified 2026-07-01 · Source

Requirements

  • New plumbing fixture installations (sinks, toilets, showers)
  • Water heater installation or replacement
  • Water line or sewer line replacement or extension
  • Gas line installation or modification
  • Backflow prevention device installation

Required documents

  • RequiredBuilding Permit Application (via West Jordan Public Portal)Submit online at permit.westjordan.utah.gov
  • OptionalPlumbing PlanRequired for larger projects — isometric or plan showing fixture locations, pipe sizes, and drainage
  • OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) for work not performed by the homeowner

Fee schedule

Fee typeAmountNotes
Plumbing Permit (minimum fee)$70Confirmed against the current West Jordan Consolidated Fee Schedule (Ord. 25-48, updated 3/6/2026, eff. through 6/30/2026), Building Permits item 3(c): 'Miscellaneous Minimum Permit (plumbing, electrical, mechanical) — $70.' Larger plumbing scopes tied to new construction are billed per the valuation-based building permit table (item 3a) instead. Verified live 2026-07-01.
Permit Processing Fee$12 per permit issuedWest Jordan Consolidated Fee Schedule, Ord. 25-48
State Surcharge1% of the building permit feeWest Jordan Consolidated Fee Schedule, Ord. 25-48
Re-Inspection$75West Jordan Consolidated Fee Schedule, Ord. 25-48 — Other Building Inspections

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, and air conditioning installations, replacements, and ductwork modifications in West Jordan. Governed by the 2021 International Mechanical Code (IMC) as adopted per Utah Code § 15A-2-103 (2024 IMC effective July 1, 2026).

Verified 2026-07-01 · Source

Requirements

  • Furnace or boiler installation or replacement
  • Air conditioning system installation or replacement
  • Ductwork installation or major modification
  • Evaporative cooler installation
  • Fireplace or wood-burning stove installation

Required documents

  • RequiredBuilding Permit Application (via West Jordan Public Portal)Submit online at permit.westjordan.utah.gov
  • OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, heat pump, or evaporative cooler
  • OptionalMechanical PlanEquipment location, duct layout, and sizing calculations for larger or new-construction projects

Fee schedule

Fee typeAmountNotes
Mechanical Permit (minimum fee)$70Confirmed against the current West Jordan Consolidated Fee Schedule (Ord. 25-48, updated 3/6/2026, eff. through 6/30/2026), Building Permits item 3(c): 'Miscellaneous Minimum Permit (plumbing, electrical, mechanical) — $70.' Larger mechanical scopes tied to new construction are billed per the valuation-based building permit table (item 3a) instead. Verified live 2026-07-01.
Permit Processing Fee$12 per permit issuedWest Jordan Consolidated Fee Schedule, Ord. 25-48
State Surcharge1% of the building permit feeWest Jordan Consolidated Fee Schedule, Ord. 25-48
Re-Inspection$75West Jordan Consolidated Fee Schedule, Ord. 25-48 — Other Building Inspections

Roofing Permit

Verified

Required for roof replacement, re-roofing, and structural roof repairs in West Jordan. Fees are valuation-based using the same building permit fee table.

Verified 2026-07-01 · Source

Requirements

  • Complete roof replacement (tear-off and re-roof)
  • Overlay of new roofing over existing (where code allows)
  • Structural roof repairs or modifications
  • Changes to roofing material type

Required documents

  • RequiredBuilding Permit Application (via West Jordan Public Portal)Submit online at permit.westjordan.utah.gov; include scope of work, square footage, and material specifications
  • OptionalContractor LicenseValid Utah roofing contractor license (Utah DOPL) if not performed by the homeowner

Fee schedule

Fee typeAmountNotes
Roofing PermitValuation-based per the West Jordan Building Permit fee table (Ord. 25-48)Assessed on project valuation per West Jordan's Consolidated Fee Schedule (Ord. 25-48, updated 3/6/2026), Building Permits item 3(a) valuation table, confirmed live 2026-07-01 (e.g. $1-$2,000 valuation = $60.50 base + $3.70 per additional $100; scaling to $6,803 base + $3.80 per additional $1,000 over $1,000,000). Roofing work is valued by total project cost; no separate flat roofing line item exists — the general valuation table governs. Plan review for residential is 40% of the permit fee.
Permit Processing Fee$12 per permit issuedWest Jordan Consolidated Fee Schedule, Ord. 25-48
State Surcharge1% of the building permit feeWest Jordan Consolidated Fee Schedule, Ord. 25-48
Re-Inspection$75West Jordan Consolidated Fee Schedule, Ord. 25-48 — Other Building Inspections

Solar Panel Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems in West Jordan. Residential solar uses a per-watt fee structure with a $150 minimum, distinct from the general valuation-based building permit fee.

Verified 2026-06-29 · Source

Requirements

  • Rooftop solar panel installation
  • Ground-mounted solar array installation
  • Battery storage system installation
  • Electrical service upgrade for solar interconnection

Required documents

  • RequiredBuilding Permit Application (via West Jordan Public Portal)Submit online at permit.westjordan.utah.gov
  • RequiredSolar Site Plan / Roof PlanShowing panel placement, setbacks, and access pathways on the roof
  • RequiredElectrical Single-Line DiagramSystem wiring from panels to inverter to main panel and utility meter
  • RequiredStructural AnalysisRoof load calculation confirming the structure can support the panels
  • RequiredEquipment SpecificationsData sheets for panels, inverter, and racking system
  • OptionalInterconnection AgreementUtility approval for grid-tied systems (Rocky Mountain Power)

Fee schedule

Fee typeAmountNotes
Solar Building Permit$46 per 1,000 watts ($150 minimum)West Jordan Consolidated Fee Schedule, Ord. 25-48 — Solar Permits (Residential only)
Battery Storage Inspection$60West Jordan Consolidated Fee Schedule, Ord. 25-48 — Solar Permits
Plan Check Review$60 per hour (2-hour minimum = $120)West Jordan Consolidated Fee Schedule, Ord. 25-48 — Solar Permits
Permit Processing Fee$12 per permit issuedWest Jordan Consolidated Fee Schedule, Ord. 25-48
State Surcharge1% of the building permit feeWest Jordan Consolidated Fee Schedule, Ord. 25-48

Demolition Permit

Verified

Required for partial or complete demolition of structures in West Jordan. The demolition permit requires pre-demolition utility disconnections, a Department of Air Quality approval letter, and a Salt Lake County Health Department pre-demolition inspection form.

Verified 2026-07-01 · Source

Requirements

  • Complete demolition of any structure
  • Partial demolition involving structural elements
  • Utility disconnection from Rocky Mountain Power (888-221-7070) and Enbridge Gas (800-323-5517) prior to permit
  • West Jordan Engineering Department verification of sewer and water disconnection (call 801-569-5070)
  • Utah Department of Air Quality approval letter (deq.utah.gov/air-quality/requirements-prior-to-demolition or 801-536-4000)
  • Salt Lake County Health Department pre-demolition inspection form from a registered inspector (385-468-4100)

Required documents

  • RequiredDemolition Permit Application (via West Jordan Public Portal)Apply online at permit.westjordan.utah.gov after completing utility disconnection steps
  • RequiredDepartment of Air Quality Approval LetterRequired prior to permit issuance — see deq.utah.gov/air-quality/requirements-prior-to-demolition
  • RequiredSalt Lake County Health Department Pre-Demolition Inspection FormMust be completed by a registered inspector — see saltlakecounty.gov/health/construction-contractors/predemolition
  • RequiredUtility Disconnect ConfirmationsConfirmation from Rocky Mountain Power, Enbridge Gas, and West Jordan Engineering for sewer and water disconnection

Fee schedule

Fee typeAmountNotes
Demolition Permit$188.75 per buildingGrounded and resolved 2026-07-01: fetched both official PDFs live. The West Jordan Building Demolition Instructions (updated April 2026 — the more specific and more recently published official document) states explicitly: 'The fee for a building demolition permit is $188.75 per building.' The general Consolidated Fee Schedule (Ord. 25-48, updated March 6, 2026), Building Permits item 3(b), lists an older $175 figure for the same line item; the April 2026 dedicated demolition guidance supersedes it as the current, most specific official source. $188.75 is the correct current fee.

Accessory Dwelling Unit (ADU)

Verified

Required for construction of an external (detached) or internal accessory dwelling unit in West Jordan. The city publishes a dedicated External ADU Building Permit Submittal Required Documents list.

Verified 2026-06-29 · Source

Requirements

  • Complete and notarized ADU license application
  • Site plan showing off-street parking stall for the ADU, primary home location, proposed ADU location, all accessory structures, utility locations (power, gas, water, sewer lines from existing home to ADU), and distances from property lines
  • Full set of architectural drawings
  • Full set of engineered drawings including structural calculation packet
  • Manual D and J mechanical design for all HVAC equipment in the ADU
  • REScheck energy code compliance documentation
  • Gas line drawing showing pipe size, BTU demands, and all gas appliances (both ADU and existing home)

Required documents

  • RequiredADU License Application (completed and notarized)Required as part of the ADU building permit submittal
  • RequiredSite PlanMust show off-street parking stall for the ADU, locations of primary home, proposed ADU, accessory structures, property line distances, and all utility lines
  • RequiredFull Architectural DrawingsComplete set of construction drawings for the ADU
  • RequiredEngineered Drawings with Structural CalculationsSealed structural drawings and calculation packet from a licensed Utah PE
  • RequiredManual D and J DesignMechanical load calculation and duct design for all HVAC equipment in the ADU
  • RequiredREScheck Energy ComplianceDocumentation demonstrating compliance with the adopted model energy code
  • RequiredGas Line DrawingPipe sizing, length, BTU demands for all gas appliances in the ADU and existing home (including system pressure designation: 4 oz or 2 lb system)

Fee schedule

Fee typeAmountNotes
Building PermitValuation-based per the West Jordan Building Permit fee table (Ord. 25-48)West Jordan Consolidated Fee Schedule, Ord. 25-48 — the standard valuation-based building permit fee schedule applies. Plan review for residential is 40% of the permit fee. A $12 processing fee and 1% state surcharge also apply.
Permit Processing Fee$12 per permit issuedWest Jordan Consolidated Fee Schedule, Ord. 25-48
State Surcharge1% of the building permit feeWest Jordan Consolidated Fee Schedule, Ord. 25-48

Water Heater Permit

Verified

Required for water heater installation, replacement, or conversion in West Jordan. This is a subset of the plumbing permit; the $70 miscellaneous minimum permit fee applies.

Verified 2026-07-01 · Source

Requirements

  • Water heater replacement (including like-for-like swaps)
  • New water heater installation
  • Conversion from tank to tankless water heater
  • Gas line modification for water heater

Required documents

  • RequiredBuilding Permit Application (via West Jordan Public Portal)Submit online at permit.westjordan.utah.gov; specify water heater type, size, fuel source, and location
  • OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) if not performed by the homeowner

Fee schedule

Fee typeAmountNotes
Water Heater / Plumbing Permit (minimum fee)$70Confirmed against the current West Jordan Consolidated Fee Schedule (Ord. 25-48, updated 3/6/2026, eff. through 6/30/2026), Building Permits item 3(c): 'Miscellaneous Minimum Permit (plumbing, electrical, mechanical) — $70.' Water heater work is a plumbing sub-scope and is billed at this flat minimum. Verified live 2026-07-01.
Permit Processing Fee$12 per permit issuedWest Jordan Consolidated Fee Schedule, Ord. 25-48
State Surcharge1% of the building permit feeWest Jordan Consolidated Fee Schedule, Ord. 25-48
Re-Inspection$75West Jordan Consolidated Fee Schedule, Ord. 25-48 — Other Building Inspections

Fence Permit

Verified

Required for fences over 6 feet in most residential zones in West Jordan (fences 6 feet and under are generally exempt from a building permit; a zoning/setback review may still apply). A fence permit is issued as a building permit and charged on the valuation-based building permit fee schedule — West Jordan publishes no separate fence line item.

Verified 2026-07-01 · Source

Requirements

  • New fence construction
  • Replacement of existing fence in a different location or height
  • Fences over 6 feet in most residential zones

Required documents

  • RequiredBuilding Permit Application (via West Jordan Public Portal)Submit online at permit.westjordan.utah.gov
  • OptionalSite PlanShowing fence location relative to property lines and any easements

Fee schedule

Fee typeAmountNotes
Fence Permit (issued as a building permit; fences over 6 ft)Assessed on project valuation using West Jordan's building permit fee (base fee plus rate by valuation), per the FY2026 Consolidated Fee ScheduleWest Jordan FY2026 Consolidated Fee Schedule item 3a — 'Building Permit based on valuation (base fee plus rate)'; valuation per ICC Building Valuation Data. There is no standalone fence fee line because a fence over 6 ft is permitted as a building permit; the $70 miscellaneous-minimum applies only to plumbing/electrical/mechanical permits, not fences.

Deck Permit

Verified

Required for new deck construction or structural modification of existing decks in West Jordan. Fees are valuation-based using the same building permit fee table.

Verified 2026-07-01 · Source

Requirements

  • New deck construction attached to or detached from the house
  • Decks higher than 30 inches above grade
  • Structural modifications to existing decks
  • Adding or replacing a deck ledger

Required documents

  • RequiredBuilding Permit Application (via West Jordan Public Portal)Submit online at permit.westjordan.utah.gov
  • RequiredConstruction DrawingsFraming plan, footing details, ledger attachment method, and railing specifications
  • RequiredSite PlanShowing deck location, setbacks from property lines, and relationship to existing structure

Fee schedule

Fee typeAmountNotes
Deck PermitValuation-based per the West Jordan Building Permit fee table (Ord. 25-48)Assessed on project valuation per West Jordan's Consolidated Fee Schedule (Ord. 25-48, updated 3/6/2026), Building Permits item 3(a) valuation table, confirmed live 2026-07-01. Deck construction is valued as new/added structure by total project cost under this table; no separate flat deck fee line item exists. Plan review for residential is 40% of the permit fee. A $12 processing fee and 1% state surcharge also apply.
Permit Processing Fee$12 per permit issuedWest Jordan Consolidated Fee Schedule, Ord. 25-48
State Surcharge1% of the building permit feeWest Jordan Consolidated Fee Schedule, Ord. 25-48
Re-Inspection$75West Jordan Consolidated Fee Schedule, Ord. 25-48 — Other Building Inspections

Basement Finish Permit

Verified

Required for finishing or remodeling an unfinished basement in West Jordan, including framing, electrical, plumbing, and mechanical work. Fees are valuation-based.

Verified 2026-07-01 · Source

Requirements

  • Framing walls in an unfinished basement
  • Adding a bedroom (requires egress window per 2021 IRC R310)
  • Adding a bathroom (requires separate plumbing permit)
  • Electrical wiring for new rooms (requires separate electrical permit)
  • Any structural modifications

Required documents

  • RequiredBuilding Permit Application (via West Jordan Public Portal)Submit online at permit.westjordan.utah.gov
  • RequiredFloor PlanLayout showing room sizes, egress windows, and door locations
  • OptionalElectrical PlanCircuit layout, panel capacity, smoke/CO detector locations
  • OptionalMechanical PlanHVAC supply/return for new rooms, combustion air for furnace room

Fee schedule

Fee typeAmountNotes
Basement Finish PermitValuation-based per the West Jordan Building Permit fee table (Ord. 25-48)Assessed on project valuation per West Jordan's Consolidated Fee Schedule (Ord. 25-48, updated 3/6/2026), Building Permits item 3(a) valuation table, confirmed live 2026-07-01. Basement finish work is valued by total project cost under this table; no separate flat basement-finish fee line item exists. Plan review for residential is 40% of the permit fee. Separate electrical, plumbing, and mechanical sub-permits at the $70 minimum each (Building Permits item 3(c)).
Permit Processing Fee$12 per permit issuedWest Jordan Consolidated Fee Schedule, Ord. 25-48
State Surcharge1% of the building permit feeWest Jordan Consolidated Fee Schedule, Ord. 25-48

Sources & verification

Verified against official sources. Last reviewed 2026-06-29.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the West Jordan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-06-29)Later version (2026-07-16) →View current record →All versions →

Permalink: /utah/salt-lake-county/west-jordan/as-of/2026-07-01/

Snapshot date: 2026-07-01

Commit: a45de4c

Reproducible from PermitBase’s version-controlled dataset, commit a45de4c.