Skip to main content
PermitBase

Version history — Ephraim, Utah

This is PermitBase’s own verified record for Ephraim, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Ephraim’s actual law was at that time.

Permanent link to today’s record

/utah/sanpete-county/ephraim/as-of/2026-08-26/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-26Current record
    • Ephraim, Utah — adopted-codes record updated
  • 2026-08-02Superseded
    • Ephraim, Utah — Commercial Tenant Improvement / Tenant Finish Permit fee record updated: $10,254.79 total per ERU if a new Equivalent Residential Unit connection is triggered (see the commercial-building-permit entry above for full itemization) → $10,254.79 total per ERU if a new Equivalent Residential Unit of demand is triggered (see the commercial-building-permit entry above for full itemization)
  • 2026-07-22Superseded
  • 2026-07-20Superseded
    • Ephraim, Utah — EV Charger / EVSE Permit record added
  • 2026-07-19Initial record — coverage of Ephraim began
    • Ephraim, Utah — Commercial Tenant Improvement / Tenant Finish Permit record added
    • Ephraim, Utah — Single-Family Residential Building Permit record added
    • Ephraim, Utah — Single-Family Residential Building Permit record removed
    • Ephraim, Utah — Solar Panel (PV) Permit record added