Unincorporated Sanpete County building permits

Unincorporated Sanpete County, Utah — as published 2026-07-16.

Reviewed 2026-07-08 · Source

Codes adopted

2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); effective since July 1, 2026, superseding the 2021 IBC2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 statewide update, remains in force2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective since July 1, 2026, superseding the 2021 IPC2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective since July 1, 2026, superseding the 2021 IMC2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective since July 1, 2026, superseding the 2021 IFGC2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective since July 1, 2026, superseding the 2021 IECC. The statute adopts a single IECC edition with no residential/commercial split.2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective since July 1, 2026, superseding the 2021 IEBC2024 residential provisions of the International Swimming Pool and Spa Code (ISPSC) — Utah Code § 15A-2-103(1)(n); effective since July 1, 2026, superseding the 2021 ISPSC2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force, unchanged by the July 1, 2026 update2006 Utah Wildland Urban Interface Code — adopted by reference at Sanpete County Land Use Ordinance § 14.76.365 and Appendix XXV, applies to any lot or subdivision located in the county's WUI Zone (a distinct county-adopted local code, not tied to the § 15A-2-103 statewide edition cycle — left unchanged)NOTE (updated 2026-07-16): The July 1, 2026 statewide code-edition transition (2024 IBC/IPC/IMC/IFGC/IECC/IEBC/ISPSC replacing 2021 editions) took effect 15 days ago per Utah Code § 15A-2-103 (version effective 7/1/2026, superseded 1/1/2027; next version's editions confirmed identical). 2021 IRC and 2023 NEC are unchanged. Live-checked the Sanpete County Building Department page today (2026-07-16) — it cites no code edition years at all, so no page-lag discrepancy to flag there. The International Fire Code is NOT adopted by § 15A-2-103 (it lives in Title 15A Chapter 5) and is not referenced elsewhere in this file.

Permit types & fees

Residential Building Permit

Required for new single-family dwelling construction, additions, and structural alterations in unincorporated Sanpete County. The Sanpete County Building Department issues all building permits for unincorporated county land and, per cooperative arrangement, also issues the underlying building permit for essentially every incorporated municipality in the county (Manti, Ephraim, Gunnison, Mt. Pleasant, Fairview, Spring City, Moroni, Centerfield, Fayette, Sterling, Mayfield, Wales, Fountain Green/Ft. Green) — those cities perform their own separate zoning approval first, then the County Building Department reviews plans, collects fees, and issues the permit and inspections.

Reviewed 2026-07-08 · Source

Requirements

  • New single-family dwelling construction
  • Additions to existing residential structures
  • Any structural modification, reconstruction, repair, remodeling, or alteration to existing improvements (Sanpete County Land Use Ordinance § 14.08.050)
  • Properties in the county's WUI Zone must additionally comply with the 2006 Utah Wildland Urban Interface Code (§ 14.76.365)
  • Properties within incorporated city limits must first obtain zoning approval from the applicable city before the County Building Department will process the building permit application

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via the county's online CityInspect permit portal (registration required) — apply, pay fee, and submit for review online
  • OptionalCity Zoning ApprovalRequired first for any parcel within an incorporated city's limits — obtained from the applicable city (contacts on file: Centerfield, Fayette, Manti, Moroni, Sterling, Ephraim, Ft. Green, Mayfield, Spring City, Wales, Fairview, Gunnison, Mt. Pleasant). Not required for unincorporated county land, which is zoned directly by Sanpete County Planning & Zoning.
  • RequiredComplete Set of Building PlansSite plan, floor plans for each level, elevations (new construction), foundation/structural/framing detail, and electrical/mechanical/plumbing design, per the county's Building Plans Checklist and the state plan-review completeness requirements of Utah Code § 17-36-55(8)
  • RequiredSite PlanDrawn to scale with north arrow and legend; lot size/dimensions, setbacks, easements, property lines, topography (if slope > 10%), utilities, driveway locations, and (in WUI areas) defensible space provisions — per Utah Code § 17-36-55(8)(b)
  • RequiredEnergy Code Compliance DocumentationDemonstrates compliance with the adopted Utah energy code (2024 IECC, effective since July 1, 2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 IECC)
  • OptionalStructural CalculationsRequired except for trusses, per Utah Code § 17-36-55(8)(e)
  • OptionalGeotechnical ReportRequired if lot slope exceeds 15%, including slope stability evaluation and retaining wall design, per Utah Code § 17-36-55(8)(f)

Fee schedule

Fee typeAmountNotes

Commercial Building Permit

Required for new commercial building construction in unincorporated Sanpete County. The Sanpete County Building Department issues commercial permits through the same office, Building Official, and CityInspect online portal used for residential permits — the county's public website does not publish a distinct commercial fee schedule, application process, or plan-review commitment separate from residential.

Reviewed 2026-07-20 · Source

Requirements

  • New commercial construction
  • Compliance with Sanpete County Land Use Ordinance § 14.08.050, which requires a permit for 'any and all improvements to real property, including but not limited to construction, reconstruction, repair, remodeling, alteration or addition to existing improvements'
  • Properties in the county's WUI Zone must additionally comply with the 2006 Utah Wildland Urban Interface Code (§ 14.76.365)
  • Utah law requires commercial building plans to be designed, drawn, and stamped by a Utah Licensed Architect or Engineer (Utah Code §§ 58-22-305 and 58-3a-304 — the exemption from stamped plans applies only to one- and two-family dwellings, not commercial structures)
  • Properties within incorporated city limits must first obtain zoning approval from the applicable city before the County Building Department will process the building permit application

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via the county's online CityInspect permit portal (registration required).
  • OptionalCity Zoning ApprovalRequired first for any parcel within an incorporated city's limits. Not required for unincorporated county land.
  • RequiredComplete Set of Building Plans, Stamped by a Utah Licensed Architect or EngineerSite plan, floor plans for each level, elevations, foundation/structural/framing detail, and electrical/mechanical/plumbing design, per the county's Building Plans Checklist and the plan-review completeness requirements of Utah Code § 17-36-55(8) for the residential-scoped portions of that statute.
  • RequiredSite PlanDrawn to scale with north arrow and legend; lot size/dimensions, setbacks, easements, property lines, utilities, driveway locations.
  • RequiredEnergy Code Compliance DocumentationDemonstrates compliance with the adopted Utah energy code (2024 IECC, effective since July 1, 2026 per Utah Code § 15A-2-103(1)(h)).
  • OptionalStructural CalculationsRequired except for trusses.

Fee schedule

Fee typeAmountNotes

Commercial Tenant Improvement / Tenant Finish Permit

Required for tenant improvement / tenant finish work inside an existing commercial building in unincorporated Sanpete County, processed through the same Building Department, Building Official, and CityInspect portal as new commercial construction and residential permits — the county publishes no separate tenant-improvement fee tier or process.

Reviewed 2026-07-19 · Source

Requirements

  • Tenant improvement, tenant finish, or remodel work inside an existing commercial building — falls under Sanpete County Land Use Ordinance § 14.08.050's definition of 'reconstruction, repair, remodeling, alteration or addition to existing improvements'
  • Utah law requires commercial building plans to be designed, drawn, and stamped by a Utah Licensed Architect or Engineer (Utah Code §§ 58-22-305 and 58-3a-304 — the exemption from stamped plans applies only to one- and two-family dwellings, not commercial structures)
  • Properties within incorporated city limits must first obtain zoning approval from the applicable city

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via the county's online CityInspect permit portal.
  • RequiredComplete Set of Building Plans, Stamped by a Utah Licensed Architect or Engineer (where scope requires)Floor plans and structural/electrical/mechanical/plumbing detail for the improved space, per the county's Building Plans Checklist.
  • OptionalEnergy Code Compliance DocumentationDemonstrates compliance with the adopted Utah energy code where the scope affects the building envelope or systems.

Fee schedule

Fee typeAmountNotes

Solar PV Permit

Required for rooftop or ground-mounted solar photovoltaic installations in unincorporated Sanpete County. Ground-mounted solar arrays specifically require a Conditional Use Permit from the Sanpete County Planning Commission before a building permit is issued — confirmed directly from Planning Commission meeting minutes approving ground-mounted array CUPs (e.g., Tim's Ranch LLC, Sept. 14, 2022). The county previously published a dedicated 'Solar Application/Permit Requirement Checklist' requiring third-party plan review by West Coast Code Consultants (WC3), but that document is no longer reachable on the county's current website (confirmed 404, no Wayback Machine snapshot exists) as of this verification.

Reviewed 2026-07-20 · Source

Requirements

  • Rooftop or ground-mounted solar PV installation
  • Ground-mounted solar arrays require a Conditional Use Permit (CUP) from the Sanpete County Planning Commission prior to installation — verified via Sanpete County Planning Commission meeting minutes (September 14, 2022, Book 3 p. 478), which record one approved CUP for a ground-mounted solar array (Tim's Ranch LLC/Lyle Hardy, parcel S-26102). A second item on the same agenda (Wind Walker Ranch, parcel S-27340, p. 477) requested a bundled CUP update including a solar array but was withdrawn before a vote, not approved — not cited as precedent here
  • Roof-mounted (flush) solar panels on an existing single-family dwelling do not appear in the same Planning Commission CUP record and are treated as an attachment to the dwelling rather than a separate structure, per Sanpete County Land Use Ordinance Title 14's general provisions
  • Building permit application through the county's CityInspect portal, as with other Sanpete County permit types
  • Properties within incorporated city limits must first obtain zoning approval from the applicable city before the County Building Department will process the associated building permit

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via the county's online CityInspect permit portal (registration required), the same portal used for all other Sanpete County building permit types.
  • OptionalConditional Use Permit Application (ground-mounted arrays only)Required before a building permit will be issued for a ground-mounted solar array, per the Sanpete County Planning Commission's own approval record for this project type; submitted to the Planning Commission, not the Building Department.
  • RequiredElectrical Single-Line Diagram and Equipment SpecificationsSystem wiring from panels/array to inverter to main panel and utility meter; manufacturer specifications for panels, racking, and inverter — standard supporting documents for any electrical permit component of a solar installation.

Fee schedule

Fee typeAmountNotes
Building Permit FeeValuation-based per ICC Building Valuation Data, run through the county's Building Permit Fee Calculator, with a 1.5x 'county factor' for unincorporated landSanpete County Commission Minutes, December 5, 2023 (Book U, pp. 278-280), read in full during re-chase 2026-07-20: the Commission adopted 'the Building Permit fee schedule presented by Scott Olsen [Building Official] with an average of 2.27 percent increase which will automatically adjust every six months based on ICC.' The minutes describe this valuation-based methodology and county factor as governing generally — 'the county determined many years ago that based on travel time, unincorporated properties have a county factor of 1.5 times more than the city limits' — with no permit-type carve-outs or exclusions discussed anywhere in the minutes. Solar PV installations require a building permit per this entry's own description, so this governing, Commission-adopted fee schedule applies to the underlying Building Permit Fee component of a solar installation the same as it does to any other structure; no distinct solar valuation table or solar-specific dollar figure exists within it.

Sign Permit (Commercial Signs)

Verified

Sanpete County Land Use Ordinance § 14.77.060 (Sign Regulations) governs commercial signs in unincorporated Sanpete County. Quoted directly from the ordinance: 'Commercial signs shall be allowed in Sanpete County with a conditional use and valid building permit. Such sign shall be located within or adjacent to the BC Zone and shall be a maximum of three hundred (300) square feet. The Planning Commission and the Sanpete County Board of Commissioners will consider safety, visual impact in granting or denying signs.' The ordinance addresses commercial signs specifically; it does not separately address residential, real estate, or other non-commercial sign types.

Verified 2026-07-20 · Source

Requirements

  • A commercial sign requires BOTH a Conditional Use Permit AND a valid building permit — per § 14.77.060's own text, both are required, not either/or
  • The sign must be located within or adjacent to the Business/Commercial (BC) Zone (established under Land Use Ordinance Chapter 14.50)
  • Maximum sign size is 300 square feet
  • The Planning Commission and the Sanpete County Board of Commissioners will consider safety and visual impact in deciding whether to grant or deny the sign's Conditional Use Permit
  • As with any Sanpete County Conditional Use Permit application, the general application procedures of Land Use Ordinance Chapter 14.68 (Conditional Uses) apply: a complete application, payment of the county's fee schedule amount, and (if the applicant fails to correct deficiencies within 30 days) potential deemed-withdrawal of the application
  • The ordinance's § 14.77.060 text is limited to commercial signs — it does not state a distinct process, size limit, or fee for residential, real estate, or other non-commercial signage in unincorporated Sanpete County; no such provision was found elsewhere in the ordinance during this research

Required documents

  • RequiredConditional Use Permit ApplicationSanpete County's standard Conditional Use Permit application (Attachment I to the Land Use Ordinance), required for a commercial sign under § 14.77.060.
  • RequiredBuilding Permit ApplicationSubmitted via the county's CityInspect portal, the same as for other Sanpete County building permit types — required in addition to the Conditional Use Permit for a commercial sign.

Fee schedule

Fee typeAmountNotes
Conditional Use Permit$700.00Re-chased 2026-07-20 and found on the Sanpete County 'Zoning Application Request and Fees' schedule (also titled 'Fee Schedule 2022' in the county's document center), linked directly from the county's official Planning & Zoning page — the 'Conditional Use Permit' line item lists a flat fee of $700, verified by rendering the PDF to an image and reading the fee table visually (the PDF is a scanned/image document; it does not extract as text). This is the fee for the Conditional Use Permit required by § 14.77.060 for a commercial sign — a separate building-permit fee (see feesNote) also applies.

EV Charger / EVSE Permit

Verified

Sanpete County does not publish a distinct EV charger / EVSE fee line item. The county's Building Department page and the December 5, 2023 County Commission minutes adopting the current ICC-valuation-based Building Permit Fee Calculator (re-checked 2026-07-20) contain no 'EV,' 'electric vehicle,' or 'charging station' entry. Because Sanpete County calculates all building permit fees from the ICC Building Valuation Data table run through the county's Uniform Fee Schedule — rather than itemized per-trade line items the way some Utah cities (e.g. Murray) do — installing an EV charger / EVSE is billed as ordinary electrical work under the same general Building Permit / valuation-based fee mechanism used for all other permit types in this file. No standalone Electrical Permit type is published separately from the general Building Permit for this county either, consistent with that same non-itemized methodology.

Verified 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in unincorporated Sanpete County
  • New dedicated electrical circuit and/or panel capacity to serve the charger, reviewed under the same Building Permit process (and 2023 NEC, statewide per Utah Code § 15A-2-103(1)(g)) as other electrical work
  • Properties within incorporated city limits must first obtain zoning approval from the applicable city before the County Building Department will process the associated building permit

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via the county's online CityInspect permit portal (registration required) — the same portal and application used for all other Sanpete County building permit types; no distinct EV-charger application form is published.
  • OptionalElectrical Single-Line Diagram / Equipment SpecificationsCharger manufacturer specifications and circuit/panel capacity information — standard supporting documentation for the electrical-work component of a building permit.

Fee schedule

Fee typeAmountNotes
Building Permit FeeValuation-based per ICC Building Valuation Data, run through the county's Building Permit Fee Calculator, with a 1.5x 'county factor' for unincorporated landSanpete County Building Department page and December 5, 2023 County Commission Minutes (Book U, pp. 278-280), re-checked 2026-07-20: no distinct EV charger / EVSE fee line item exists anywhere in the county's published fee materials. The county's Commission-adopted fee schedule is valuation-based (ICC Building Valuation Data with the same 1.5x unincorporated-county-factor multiplier documented elsewhere in this file) with no permit-type carve-outs discussed in the minutes, so this general Building Permit fee mechanism is what governs an EV charger installation. The exact current per-square-foot/valuation table lives inside the county's CityInspect online permit portal (requires a registered account), not as a standalone published document.

Fire Sprinkler / Fire Alarm Permit

Verified

Sanpete County does not publish a standalone Fire Sprinkler or Fire Alarm Permit, separate application, or separate fire-district plan review process. Sanpete County Land Use Ordinance § 14.76.360 ('Required Fire Protection') directly folds fire-prevention plan review into the ordinary Building Permit process: County Building Department staff review all agricultural, commercial, industrial, and residential plans countywide (including within incorporated municipalities) 'to determine compliance with provisions of the Fire District,' and the Building Official then issues fire-prevention recommendations and requirements -- including access, design, preventative building materials, and mitigation equipment -- as a condition, or conditions, of the building permit itself. § 14.78.050 separately adopts 'selected provisions' of the International Fire Code, as determined by the Building Official, applicable to IBC requirements for structures in the county. The countywide Sanpete County Fire District (Sanpete County Special Service District #2) is the fire-protection body referenced in § 14.76.360, but it does not publish its own separate permit application, fee schedule, or plan-review process independent of this Building Department review -- and Utah Code § 53-7-104 confirms that state fire code enforcement authority in an area covered by a county fire protection special service district (as unincorporated Sanpete County is) rests with that district's own fire officer, not by default with the Utah State Fire Marshal, whose own published plan-review scope (firemarshal.utah.gov) is limited to state-owned buildings, schools, and hospitals -- so the State Fire Marshal's statewide submittal/plan-review process is NOT the applicable fallback here.

Verified 2026-07-22 · Source

Requirements

  • Any agricultural, commercial, industrial, or residential structure requiring a Sanpete County building permit is reviewed by County Building Department staff for compliance with Fire District provisions as part of that same building permit's plan review, per Land Use Ordinance § 14.76.360 -- this applies whether the fire-prevention feature is a sprinkler system, alarm system, access/design requirement, or other mitigation measure
  • Selected provisions of the International Fire Code, as determined applicable by the Building Official, govern the fire-related requirements imposed per § 14.78.050
  • No separate application, fee, or approval body exists for fire sprinkler or fire alarm work distinct from the underlying Building Permit -- fire-prevention requirements are imposed as conditions of that permit, not as a standalone permit
  • Properties within incorporated city limits must still first obtain zoning approval from the applicable city before the County Building Department will process the associated building permit

Required documents

  • RequiredBuilding Permit ApplicationSubmitted via the county's online CityInspect permit portal (registration required) -- the same application used for all other Sanpete County building permit types; no distinct fire sprinkler/alarm application form is published.
  • OptionalFire Suppression / Alarm System Shop Drawings and SpecificationsManufacturer/installer shop drawings, hydraulic calculations, and equipment specifications for any fire sprinkler or fire alarm system included in the project scope, submitted as part of the overall building plan set reviewed by the Building Department for Fire District compliance per § 14.76.360.

Fee schedule

Fee typeAmountNotes
Building Permit Fee (fire-prevention conditions incorporated)Valuation-based per ICC Building Valuation Data, run through the county's Building Permit Fee Calculator, with a 1.5x 'county factor' for unincorporated landNo fire-sprinkler- or fire-alarm-specific fee line exists in the county's published fee materials (Building Department page; December 5, 2023 County Commission Minutes, Book U, pp. 278-280). Because § 14.76.360 folds fire-prevention plan review and conditions into the ordinary Building Permit rather than creating a separate permit, this is the same general, valuation-based Building Permit fee documented elsewhere in this file -- the exact current per-square-foot table lives inside the county's CityInspect online permit portal (registered account required), not as a standalone published document.

Change of Use Permit / Certificate of Occupancy

Sanpete County does not publish a standalone 'Change of Use Permit' as a distinct application or fee category. Land Use Ordinance § 14.90.110 (Certificate of Occupancy) requires that 'a certificate of occupancy shall be obtained from and issued by the Sanpete County Building Inspection Department prior to the occupancy of any building or structure approved under this code,' and specifies the certificate 'shall specify the use (occupancy) of the structure' -- this is issued as the closing step of an underlying Building Permit (§ 14.90.115: a building permit 'will be closed once a certificate of occupancy or notification of passing a final inspection has been issued'), not through a separate standalone process. Separately, § 14.90.080 makes it a Class C misdemeanor to 'change the use of any building or other structure or the use of any land within the unincorporated territory of Sanpete County in violation of the provisions of this title' -- confirming a change of use itself must comply with the ordinance, without establishing a distinct change-of-use application or fee. The one specific, named path found is narrower: § 14.60.010 allows a legally NONCONFORMING use to continue only if 'no change in use occurs, except as may be allowed by Section 14.20.050' (the Variance section) -- meaning changing a legally nonconforming use requires a Variance from the Sanpete County Board of Adjustments, a $700 flat fee per the county's 'Zoning Application Request and Fees' schedule (already documented in this file's commercial-building-permit entry). No distinct fee, application, or process was found for an ordinary conforming-to-conforming use change that does not involve new construction.

Reviewed 2026-07-22 · Source

Requirements

  • A Certificate of Occupancy must be obtained from the Sanpete County Building Inspection Department prior to occupying any building or structure approved under the Land Use Ordinance, per § 14.90.110 -- this is issued as the closing step of the underlying Building Permit, not a standalone application
  • Changing the use of a building, structure, or land within unincorporated Sanpete County without complying with the Land Use Ordinance is a Class C misdemeanor under § 14.90.080
  • Changing a LEGALLY NONCONFORMING use specifically requires a Variance from the Sanpete County Board of Adjustments, per § 14.60.010's restriction that a nonconforming use may continue only if 'no change in use occurs, except as may be allowed by Section 14.20.050' (Variance)
  • No county building permit will be issued, and the county has no obligation to issue a certificate of occupancy, for any parcel subdivided or sold in violation of the ordinance, per § 14.90.050
  • Properties within incorporated city limits must first obtain zoning approval from the applicable city before the County Building Department will process any associated building permit or certificate of occupancy

Required documents

  • RequiredCertificate of Occupancy RequestRequested through the Sanpete County Building Inspection Department (via the CityInspect portal used for the underlying building permit) once construction/work approved under a building permit is complete and has passed final inspection, per § 14.90.110 and § 14.90.115. No separate standalone CO application form, distinct from the building permit's own final-inspection process, is published.
  • OptionalVariance Application (nonconforming-use changes only)Required only when the change of use affects a legally nonconforming use, per § 14.60.010 -- submitted to the Sanpete County Board of Adjustments; not required for an ordinary conforming-to-conforming use change.

Fee schedule

Fee typeAmountNotes
Variance (nonconforming-use change only)$700.00Per the Sanpete County 'Zoning Application Request and Fees' schedule ('Fee Schedule 2022'), linked from the official Planning & Zoning page -- verified 2026-07-20 by rendering the scanned PDF to an image and reading the fee table visually (the document is a scanned/image PDF, not text-extractable). This fee applies only to the Variance required by § 14.60.010 when changing a legally NONCONFORMING use; no separate fee was found for an ordinary conforming-to-conforming change of use, and no distinct Certificate of Occupancy fee (separate from the underlying building permit fee) is published.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Sanpete County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-08)View current record →All versions →

Permalink: /utah/sanpete-county/unincorporated-sanpete/as-of/2026-07-16/

Snapshot date: 2026-07-16

Commit: 9d25784

Reproducible from PermitBase’s version-controlled dataset, commit 9d25784.