This is PermitBase’s published record for Park City as of 2026-07-21. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Park City building permits
VerifiedPark City, Utah — as published 2026-07-21.
Verified 2026-07-08 · Source
Codes adopted
Permit types & fees
Residential Building Permit
VerifiedRequired for new single-family and multi-family residential construction and any work regulated by the adopted 2021 IRC / 2024 IBC that is not exempt under IBC/IRC Sec. 105.2 (e.g., carpeting, painting, wallpapering, cabinets, countertops are exempt; drywall work generally requires a permit). Park City's fee is valuation-based (0.61% of total construction valuation) rather than a tiered table, plus a mandatory plan-check deposit and 65% plan-check fee.
Verified 2026-07-08 · Source
Requirements
- New single-family or multi-family residential construction
- Any work regulated by the adopted 2021 IRC / 2024 IBC that is not exempt under Sec. 105.2
- Application submitted through the City Inspect (MCI) online portal
- Compliance with the Wildland-Urban Interface Code (Sec. 11-21-1) where applicable, determined via the WUI worksheet as part of plan review
- Planning Department review for zoning compliance (setbacks, building height, design, building pad limits) per the Land Management Code
- Minimum submittal requirements for new structures, per Park City's official Building Plan Review guidance
Required documents
- RequiredCity Inspect (MCI) Building Permit ApplicationStarted online through City Inspect; new users must first register per Park City's 'How to Register for City Inspect (MCI)' guide. All permit types, scope of work, and project location are entered into the application.
- RequiredCompleteness ChecklistPark City's official checklist used by the Building Department to screen a submittal for completeness before beginning the plan review process, referenced on the Building Department's Forms, Codes & Resources page.
- OptionalWildland Urban Interface (WUI) WorksheetUsed to determine WUI Code (Sec. 11-21-1) applicability and requirements for the project as part of building permit plan review.
- RequiredConstruction Mitigation Plan (CMP)Reviewed by Community Code Compliance as part of the plan review process, per Park City's official Permit FAQs (covers Limits of Disturbance and Erosion Control alongside the CMP).
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (Single-Family / Multi-Family / Commercial) | 0.61% of total valuation of construction, minimum fee $83.00, plus 1% state surcharge | Park City Fee Schedule (effective October 20, 2025) § 1.2.2 'Building Permit.' Total valuation is calculated from the actual value of construction, excluding the value of on-site renewable energy systems (solar PV, ground source heat pumps, solar hot water). |
| Plan Check Deposit | $500.00 (residential buildings); $2,000.00 (commercial buildings) | Park City Fee Schedule § 1.2.3(1): non-refundable deposit required at time of building permit application for buildings requiring plan checks; forfeited if permits are not issued. |
| Plan Check Fee | 65.0% of the building permit fee for that building (or $83.00/hour of Community Development staff time for 'identical plans' as defined in the Fee Schedule) | Park City Fee Schedule § 1.2.3(2). |
Electrical Permit
VerifiedRequired for electrical work in Park City not incidental to a covered building permit. Fee is valuation-based (1.32% of construction valuation) rather than a flat per-Utah-municipality rate. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; the currently effective Fee Schedule (10/20/2025) excludes only on-site renewable energy systems (solar PV, ground source heat pumps, solar hot water) from the building-permit valuation base, and does not list a separate EV-charger fee exemption. Park City's Environmental Sustainability program has separately advertised (in older, no-longer-live outreach pages) that 'building permit fees for installing EV charging equipment... are waived' — but this is not reflected in the current codified Fee Schedule, so it is noted here for transparency rather than applied as a guaranteed fee waiver.
Verified 2026-07-08 · Source
Requirements
- New electrical circuits, wiring installations, or service upgrades not covered under an active building permit
- Application submitted through the City Inspect (MCI) online portal
Required documents
- RequiredCity Inspect (MCI) Permit ApplicationSubmitted online at City Inspect; new users must register first per Park City's official registration guide.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit Fee | 1.32% of the total valuation of construction, plus 1% state surcharge | Park City Fee Schedule (effective October 20, 2025) § 1.2.5 'Electrical Permit.' |
Plumbing Permit
VerifiedRequired for plumbing installations and alterations in Park City not incidental to a covered building permit. Fee is valuation-based (1.32% of construction valuation).
Verified 2026-07-08 · Source
Requirements
- New plumbing fixture installations, water heater installation/replacement, or water/sewer/gas line work not covered under an active building permit
- Application submitted through the City Inspect (MCI) online portal
Required documents
- RequiredCity Inspect (MCI) Permit ApplicationSubmitted online at City Inspect.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Permit Fee | 1.32% of the total valuation of construction, plus 1% state surcharge | Park City Fee Schedule (effective October 20, 2025) § 1.2.6 'Plumbing Permit.' |
Mechanical / HVAC Permit
VerifiedRequired for HVAC installations, replacements, and ductwork modifications in Park City not incidental to a covered building permit. Fee is valuation-based (1.32% of construction valuation).
Verified 2026-07-08 · Source
Requirements
- Furnace, boiler, or air conditioning installation/replacement, or ductwork installation/major modification not covered under an active building permit
- Application submitted through the City Inspect (MCI) online portal
Required documents
- RequiredCity Inspect (MCI) Permit ApplicationSubmitted online at City Inspect.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical Permit Fee | 1.32% of the total valuation of construction, plus 1% state surcharge | Park City Fee Schedule (effective October 20, 2025) § 1.2.4 'Mechanical Permit.' |
Demolition Permit
VerifiedRequired for demolition of structures in Park City. Fee is valuation-based (1.32% of the value of the demolition work).
Verified 2026-07-08 · Source
Requirements
- Demolition of an existing structure
- Application submitted through the City Inspect (MCI) online portal
Required documents
- RequiredCity Inspect (MCI) Permit ApplicationSubmitted online at City Inspect.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolition Permit Fee | 1.32% of the total valuation of construction, plus 1% state surcharge | Park City Fee Schedule (effective October 20, 2025) § 1.2.10 'Demolition Permit Fee.' |
Commercial Building Permit
VerifiedRequired for new commercial building construction, commercial shell buildings, and ground-up commercial additions in Park City, regulated by the adopted 2024 IBC. Park City bills the Commercial Permit at the same valuation-based rate as residential construction (0.61% of total valuation) per Fee Schedule § 1.2.2, but requires a larger, $2,000 non-refundable Plan Check Deposit (vs. $500 for residential buildings) given the added complexity of commercial plan review, plus the standard 65% Plan Check Fee. Properties within Park City's Historic District (Old Town / Main Street) additionally require Planning Department Historic Design Review before or alongside building permit issuance.
Verified 2026-07-19 · Source
Requirements
- New commercial building construction, commercial shell building, or addition regulated by the adopted 2024 IBC that is not exempt under IBC Sec. 105.2
- Application submitted through the City Inspect (MCI) online portal
- Planning Department review for zoning compliance (setbacks, building height, design, parking) under the Land Management Code, Title 15
- Historic Design Review by the Planning Department/Historic Preservation Board if the property is within Park City's Historic District (Old Town / Main Street), per Fee Schedule § 1.1.7
- Compliance with the Wildland-Urban Interface Code (Sec. 11-21-1) where applicable, determined via the WUI worksheet as part of plan review
- Construction Mitigation Plan reviewed by Community Code Compliance
Required documents
- RequiredCity Inspect (MCI) Building Permit ApplicationStarted online through City Inspect; new users must first register per Park City's 'How to Register for City Inspect (MCI)' guide.
- RequiredCompleteness ChecklistPark City's official checklist used by the Building Department to screen a submittal for completeness before beginning the plan review process, referenced on the Building Department's Forms, Codes & Resources page.
- RequiredConstruction Mitigation Plan (CMP)Reviewed by Community Code Compliance as part of the plan review process, per Park City's official Permit FAQs (covers Limits of Disturbance and Erosion Control alongside the CMP).
- OptionalEnergy Code Compliance DocumentationDocumentation demonstrating compliance with the adopted 2024 IECC commercial provisions (e.g., a COMcheck report). Park City's public Completeness Checklist and Forms & Resources pages do not itemize a specific named commercial energy-compliance submittal, but compliance with the adopted commercial IECC is a code requirement, not an assumed one — confirm the exact submittal format with the Building Department (435-615-5101).
- OptionalHistoric Design Review ApplicationRequired only for properties within Park City's Historic District; reviewed by the Planning Department ahead of or alongside the building permit, per Fee Schedule § 1.1.7.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Commercial Permit Fee | 0.61% of the total valuation of construction, minimum fee $83.00, plus 1% state surcharge | Park City Fee Schedule (effective October 20, 2025) § 1.2.2 'Building Permit,' line item 'Commercial Permit' — same rate as the Single-Family and Multi-Family Permit line items directly above it in the same table. Show full citationHidePark City Fee Schedule (effective October 20, 2025) § 1.2.2 'Building Permit,' line item 'Commercial Permit' — same rate as the Single-Family and Multi-Family Permit line items directly above it in the same table. Verified by direct extraction of the full 48-page Fee Schedule PDF text. |
| Plan Check Deposit | $2,000.00 (commercial buildings) | Park City Fee Schedule § 1.2.3(1): 'Commercial Buildings $2,000.00' — non-refundable deposit required at time of building permit application for buildings requiring plan checks; forfeited if permits are not issued. |
| Plan Check Fee | 65.0% of the building permit fee for that building (or $83.00/hour of Community Development staff time for 'identical plans' as defined in the Fee Schedule) | Park City Fee Schedule § 1.2.3(2). |
| Historic Design Review (Planning Dept., Historic District properties only) | $497.00 (no increase in existing area) or $1,518.00 (increase in existing area) | Park City Fee Schedule § 1.1.7 'Historic Review' — applies only to properties within the Historic District; not a Building Department fee. |
| Outside Consultant Plan Review or Inspection | Actual cost | Park City Fee Schedule § 1.2.12 'Other Inspections and Fees' — billed for use of outside consultants for plan reviews, inspections, or both; commonly triggered by large or complex commercial/resort-scale projects. |
| Re-Inspection Fee | $124.00/hour, minimum 1 hour | Park City Fee Schedule § 1.2.12. |
| Inspections Outside Normal Business Hours | $124.00/hour, minimum 2 hours | Park City Fee Schedule § 1.2.12. |
| Starting / Continuing Work Without a Permit | 2x the Building Permit Fee (first offense); 4x the Building Permit Fee (second/continuing offense) | Park City Fee Schedule § 1.2.12. |
Commercial Tenant Improvement / Tenant Finish Permit
VerifiedRequired for interior tenant improvement / tenant finish work in existing commercial buildings in Park City — build-outs, remodels, and finish work for a new or changing tenant space. Park City's official Fee Schedule (effective October 20, 2025) does NOT list 'Tenant Improvement' as a distinct fee category separate from new commercial construction: this was confirmed by direct full-text extraction of the entire 48-page Fee Schedule PDF, which lists exactly three line items under § 1.2.2 'Building Permit' — Single-Family Permit, Multi-Family Permit, and Commercial Permit — with no fourth tenant-improvement or remodel-specific tier (unlike, e.g., Sandy or Murray's fee schedules, which do itemize a separate Tenant Improvement rate). TI work in Park City is therefore billed under the same valuation-based Commercial Permit rate (0.61% of the valuation of the TI scope of work) as ground-up commercial construction, plus the same $2,000 Plan Check Deposit and 65% Plan Check Fee.
Verified 2026-07-19 · Source
Requirements
- Interior build-out, remodel, or finish work in an existing commercial tenant space, regulated by the adopted 2024 IBC and, for work in existing buildings, the adopted 2024 International Existing Building Code (IEBC)
- Application submitted through the City Inspect (MCI) online portal
- Floor plan showing existing and proposed layout, occupancy classification, and egress
- Historic Design Review by the Planning Department if the space is within Park City's Historic District and the scope affects the building exterior or historic fabric, per Fee Schedule § 1.1.7
Required documents
- RequiredCity Inspect (MCI) Building Permit ApplicationStarted online through City Inspect; new users must first register per Park City's 'How to Register for City Inspect (MCI)' guide.
- RequiredCompleteness ChecklistPark City's official checklist used by the Building Department to screen a submittal for completeness before beginning the plan review process.
- RequiredTenant Improvement / Floor PlansExisting and proposed floor plan showing scope of work, occupancy classification, egress, and mechanical/electrical/plumbing rough-in for the tenant space.
- OptionalHistoric Design Review ApplicationRequired only if the tenant space is within Park City's Historic District and the scope of work affects the exterior or historic fabric of the building, per Fee Schedule § 1.1.7.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Commercial Permit Fee (applies to tenant improvement valuation) | 0.61% of the total valuation of the tenant improvement scope of work, minimum fee $83.00, plus 1% state surcharge | Park City Fee Schedule (effective October 20, 2025) § 1.2.2 'Building Permit,' line item 'Commercial Permit.' No separate 'Tenant Improvement' fee tier exists in the Fee Schedule — confirmed by… Show full citationHidePark City Fee Schedule (effective October 20, 2025) § 1.2.2 'Building Permit,' line item 'Commercial Permit.' No separate 'Tenant Improvement' fee tier exists in the Fee Schedule — confirmed by direct text extraction of the full 48-page PDF (search for 'improvement,' 'remodel,' and 'renovation' returned no building-fee matches). The same rate applies whether the underlying scope is new construction or interior tenant finish work. |
| Plan Check Deposit | $2,000.00 (commercial buildings) | Park City Fee Schedule § 1.2.3(1): 'Commercial Buildings $2,000.00' — non-refundable deposit required at time of building permit application for buildings requiring plan checks; Show full citationHidePark City Fee Schedule § 1.2.3(1): 'Commercial Buildings $2,000.00' — non-refundable deposit required at time of building permit application for buildings requiring plan checks; forfeited if permits are not issued. Applies identically to tenant improvement projects since Park City does not distinguish TI from new construction in its fee structure. |
| Plan Check Fee | 65.0% of the building permit fee for that building (or $83.00/hour of Community Development staff time for 'identical plans' as defined in the Fee Schedule) | Park City Fee Schedule § 1.2.3(2). |
| Historic Design Review (Planning Dept., Historic District properties only) | $497.00 (no increase in existing area) or $1,518.00 (increase in existing area) | Park City Fee Schedule § 1.1.7 'Historic Review' — applies only if the tenant space is within the Historic District and the TI scope affects the exterior or historic fabric; not a Building Department fee. |
| Outside Consultant Plan Review or Inspection | Actual cost | Park City Fee Schedule § 1.2.12 'Other Inspections and Fees.' |
| Re-Inspection Fee | $124.00/hour, minimum 1 hour | Park City Fee Schedule § 1.2.12. |
Sign Permit
VerifiedPark City regulates signs through Municipal Code Title 12 (Sign Code) and reviews sign applications under a tiered fee structure published in the city's official Fee Schedule (effective October 20, 2025). Fees range from $115.14 for a Temporary Sign Permit up to $402.00 for a Master Sign Plan, with most individual sign permits carrying a 1% state surcharge on top of the base amount.
Verified 2026-07-20 · Source
Requirements
- A sign permit review fee applies under Land Management Code Fee Schedule § 1.1.10, Sign Review, covering Master Sign Plans, amendments, individual sign permits, sign permits issued under an existing Master Sign Plan, and temporary sign permits
- Buildings or projects with more than one tenant/use are generally expected to have a Master Sign Plan on file, with individual signs then permitted under that plan at a lower per-sign fee than a standalone Individual Sign Permit
Required documents
- RequiredSign Permit ApplicationSubmitted to Park City Planning for review under Land Management Code Title 12 (Sign Code) / Fee Schedule § 1.1.10.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Master Sign Plan | $402.00 | Park City Fee Schedule, effective October 20, 2025, § 1.1.10 Sign Review: 'Master Sign Plan $402.00.' |
| Amendment to Master Sign Plan | $241.00 | Park City Fee Schedule, effective October 20, 2025, § 1.1.10. |
| Individual Sign Permit | $200.99 ($199.00 plus 1% state surcharge) | Park City Fee Schedule, effective October 20, 2025, § 1.1.10. |
| Sign Permit Under Master Sign Plan | $215.13 ($213.00 plus 1% state surcharge) | Park City Fee Schedule, effective October 20, 2025, § 1.1.10. |
| Temporary Sign Permit | $115.14 ($114.00 plus 1% state surcharge) | Park City Fee Schedule, effective October 20, 2025, § 1.1.10. |
EV Charger / EVSE Permit
Park City has no distinct, codified EV charger/EVSE permit type or fee line item — EV charger installation is electrical work billed under the city's standard Electrical Permit (1.32% of construction valuation, plus 1% state surcharge), per the Park City Fee Schedule effective October 20, 2025. Park City's Environmental Sustainability office has separately advertised (via an archived 'Electric Vehicle Charger Incentives' outreach page) that building permit fees for EV charging equipment are waived, but this waiver is NOT reflected in the currently effective codified Fee Schedule, which only excludes on-site renewable energy systems (solar PV, ground source heat pumps, solar hot water) from the building-permit valuation base — not EV chargers. This is a genuine, unresolved discrepancy between city outreach messaging and the codified fee schedule.
Reviewed 2026-07-20 · Source
Requirements
- New electrical circuit or panel capacity dedicated to a Level 2 or DC fast EV charger (EVSE), not covered under an active building permit
- Application submitted through the City Inspect (MCI) online portal
- Confirm with the Environmental Sustainability office (435-615-5193) whether an EV-charger permit-fee waiver is currently being honored, since it is not written into the codified Fee Schedule
Required documents
- RequiredCity Inspect (MCI) Permit ApplicationSubmitted online at City Inspect; new users must register first per Park City's official registration guide.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit Fee (codified — applies absent a confirmed waiver) | 1.32% of the total valuation of construction, plus 1% state surcharge | Park City Fee Schedule (effective October 20, 2025) § 1.2.5 'Electrical Permit.' No distinct EV-charger fee line item is codified; Show full citationHidePark City Fee Schedule (effective October 20, 2025) § 1.2.5 'Electrical Permit.' No distinct EV-charger fee line item is codified; § 1.2.2's Building Permit Total Valuation exclusion applies only to on-site renewable energy systems (solar PV, ground source heat pumps, solar hot water), not EV charging equipment. |
| Advertised EV Charger Fee Waiver (uncodified — status unconfirmed) | Not applicable / waived, per city outreach messaging (status unconfirmed against the current codified schedule) | Park City's Environmental Sustainability office publicly advertised (archived 'Electric Vehicle Charger Incentives' page) that building permit fees for EV charging equipment are waived. Show full citationHidePark City's Environmental Sustainability office publicly advertised (archived 'Electric Vehicle Charger Incentives' page) that building permit fees for EV charging equipment are waived. This is not reflected in the current codified Fee Schedule and may be discretionary or no longer active — confirm directly with the Building Department (435-615-5101) or Environmental Sustainability office (435-615-5193, celia.peterson@parkcity.org) before assuming a waiver applies. |
Solar PV Permit
VerifiedPark City runs a genuinely distinct, streamlined solar photovoltaic (PV) permitting process, separate from the general Residential/Commercial Building Permit workflow — confirmed on the city's official 'Solar PV Permitting Info' page (Sustainability Department). Unlike other permit types, solar PV applications are NOT submitted through the City Inspect (MCI) online portal: a physical application using the Solar ABCs (Expedited Permit Process for PV Systems) template must be submitted in person to the Building Department at City Hall (445 Marsac Avenue). Systems under 15kW with complete, correct documentation qualify for permit issuance within two business days. Renewable energy system value (solar PV, ground source heat pumps, solar hot water) is excluded from the construction valuation used to calculate the Building Permit fee under Fee Schedule § 1.2.2 — the city's own solar page characterizes this as making solar systems 'eligible for a building permit fee waiver.' Solar thermal (as opposed to solar PV/solar electric) projects are handled separately; the city directs applicants to contact the Building Department directly for those.
Verified 2026-07-21 · Source
Requirements
- Solar photovoltaic (PV) / solar electric installation on a home or business within Park City Municipal Corporation (PCMC) city limits (solar thermal projects are handled separately — contact the Building Department directly)
- Physical (in-person or mailed) application submitted to the Building Department at City Hall, 445 Marsac Avenue, using the Solar ABCs (Expedited Permit Process for PV Systems) template — not submitted through the City Inspect (MCI) online portal used for other Park City permit types
- For the 2-business-day streamlined review: system must be under 15kW AND all required documents must be provided and correct AND no more than three applications may have been submitted by the same individual or company within the same calendar month
- Net Metering Agreement completed with Rocky Mountain Power (and appropriate meter set up) for all grid-connected solar installations, required before final project approval
- Planning Department zoning review of the solar permit submitted to the Building Department, to confirm compliance with local codes and ordinances
- Design Review (Planning Department) required in addition to the Building Department solar permit if the installation is on a historic structure or within Park City's Historic District
- Separate HOA review and approval if the property is part of a homeowners association — PCMC's process does not substitute for HOA sign-off
Required documents
- RequiredSolar PV Permit Application (Solar ABCs / Expedited Permit Process for PV Systems template)Park City utilizes the nationally standardized Solar ABCs expedited-permit template for solar PV permitting. A physical copy must be submitted directly to the Building Department at City Hall, 445 Marsac Avenue, Park City, UT 84060 — this is a genuinely different submission channel from the City Inspect (MCI) portal used for every other Park City permit type in this dataset.
- RequiredNet Metering Agreement (Rocky Mountain Power)Required for all grid-connected solar installations; Rocky Mountain Power must set up the appropriate meter before the city grants final project approval.
- OptionalHistoric Design Review ApplicationRequired only if the installation is on a historic structure or within Park City's Historic District; reviewed by the Planning Department per PCMC's Design Guidelines for Historic Districts and Historic Sites.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar PV Building Permit Fee (renewable energy valuation exclusion / fee waiver) | Waived in typical practice — Park City's official Solar PV Permitting Info page states renewable energy systems are 'eligible for a building permit fee waiver' under the municipal Fee Schedule, § 1.2.2, which excludes the value of on-site renewable energy systems (solar PV, ground source heat pumps, solar hot water) from the total construction valuation used to compute the Building Permit fee. | Park City Fee Schedule (effective October 20, 2025) § 1.2.2 'Building Permit,' renewable-energy valuation exclusion, as characterized by the city's own Solar PV Permitting Info page ('Costs' section). Show full citationHidePark City Fee Schedule (effective October 20, 2025) § 1.2.2 'Building Permit,' renewable-energy valuation exclusion, as characterized by the city's own Solar PV Permitting Info page ('Costs' section). Because § 1.2.2 separately lists an $83.00 minimum fee for the Building Permit line item, a nominal minimum fee may still apply to a solar-only project reduced to $0 valuation — this is not explicitly reconciled on the city's solar page, which frames the treatment simply as a fee waiver; confirm the exact amount charged (if any) with the Building Department (435-615-5101) at time of application. |
| Historic Design Review (Planning Dept., Historic District/structures only) | $497.00 (no increase in existing area) or $1,518.00 (increase in existing area) | Park City Fee Schedule § 1.1.7 'Historic Review' — applies only if the solar installation is on a historic structure or within the Historic District; Show full citationHidePark City Fee Schedule § 1.1.7 'Historic Review' — applies only if the solar installation is on a historic structure or within the Historic District; not a Building Department fee. Cross-referenced from the commercial-building-permit and commercial-tenant-improvement-permit entries in this same file, which cite the identical fee line item. |
| Legacy 'Building Permit Fee Waiver' program (up to $1,000/project) — unconfirmed | Advertised as up to $1,000.00 per project on the city's own Solar PV Permitting Info page, under a separate linked document | The Solar PV Permitting Info page's 'Financial Incentives' section separately links a 'Building Permit Fee Waiver' document (a distinct, older parkcity.gov document ID from the current § 1.2.2 Fee… Show full citationHideThe Solar PV Permitting Info page's 'Financial Incentives' section separately links a 'Building Permit Fee Waiver' document (a distinct, older parkcity.gov document ID from the current § 1.2.2 Fee Schedule) advertising a permitting fee waiver of up to $1,000 per project. This underlying document could not be retrieved during this verification — it returned HTTP 404 both on the live parkcity.gov URL and via the closest available Wayback Machine capture of that specific document ID. Included here for transparency per the city's own outreach messaging, but treated as an unconfirmed legacy reference distinct from the codified § 1.2.2 valuation exclusion above — confirm current status with the Building Department or Sustainability office before relying on a specific dollar cap. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fee schedules
Online permit portal
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Park City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.