This is PermitBase’s published record for Grantsville as of 2026-07-21. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Grantsville building permits
VerifiedGrantsville, Utah — as published 2026-07-21.
Verified 2026-07-08 · Source
Codes adopted
Permit types & fees
Residential Building Permit (Single Family Dwelling)
VerifiedRequired for new single-family residential construction in Grantsville and any work regulated by the adopted 2021 IRC / 2024 IBC with Utah amendments. Grantsville's Single Family Dwelling fee schedule uses its own valuation-based Building Permit Fee (0.0068 × total permit value) and Plan Check Fee (0.0040 × total permit value), most recently set by City Ordinance 2024-30 (approved 11/6/2024), plus a package of water/sewer/park/public-safety impact fees distinct from other Tooele County jurisdictions. Rooftop solar panel installations fall under this same Building Permit — the city's official 'When Do I Need a Building Permit?' handout lists 'Solar panels' as one of the outdoor project types requiring this permit, with no separate solar-specific application, checklist, or fee published on grantsvilleut.gov or in the Consolidated Fee Schedule as of 2026-07-19 (cms9files.revize.com/grantsvilleut/Document_Center/Department/Building%20Department/What-needs-a-permit1.pdf). Grantsville's building permit fee ordinances (Utah PMN public-notice filings for the city's fee schedule amendments) price the Building Permit Fee as a percentage of total permit valuation (e.g., .0068x or a flat $150 minimum under $15,000, per the most recent amendment on file), plus a 1% state surcharge; no distinct EV charger/EVSE fee line item was found in these ordinances as of 2026-07-19, so EV charger installation would be handled as standard electrical work under this same valuation-based fee.
Verified 2026-07-08 · Source
Requirements
- New single-family residential construction
- Any work regulated by the adopted 2021 IRC / 2024 IBC with Utah amendments
- Complete building permit application per Utah Code Title 15A completeness requirements, including applicant/general contractor contact information
- Site plan showing lot size and dimensions, setbacks, topography (if slope > 10%), retaining walls, hard surface areas, curb/gutter elevations, existing/proposed utilities, street names, driveway locations, and nearest hydrant location
- Construction plans and drawings including elevations (new construction), floor plans with egress, foundation/structural/framing detail, and electrical/mechanical/plumbing design
- Engineering structural calculations when the home does not meet IRC prescriptive design requirements
- IECC energy code compliance documentation (as amended by the State of Utah)
- Manual J&D (or equivalent) heating/cooling load calculations
- Gas line diagram noting meter size, pipe lengths/sizes/type, and BTUs of all appliances
- Geotechnical report with slope stability evaluation and retaining wall design if lot slope exceeds 15% and required by the city
- Secondary water certificate and septic tank/well permit, if required
Required documents
- RequiredNew Residential Building Submittal Checklist (SFD)Grantsville City's official checklist of items required for a complete new single-family residential building permit application per Utah State Law completeness requirements, all items to be provided in PDF format.
- RequiredGrantsville Building Permit Application (fillable PDF)Official fillable application form, published on the Building Department's Checklists & Forms page.
- OptionalOwner Builder Certification AgreementRequired if the applicant is acting as an owner-builder contractor rather than through a licensed general contractor, per State of Utah requirements referenced in the SFD checklist.
- OptionalPower to Panel AgreementOfficial Grantsville City form (fillable), published on the Checklists & Forms page.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (Single Family Dwelling, valuation-based) | 0.0068 x total permit value | Grantsville City Consolidated Fee Schedule, 'Single Family Dwelling Permit Fees' — Building Permit Fee, per amendment history most recently set by Ordinance 2024-30 (approved 11/6/2024), superseding… Show full citationHideGrantsville City Consolidated Fee Schedule, 'Single Family Dwelling Permit Fees' — Building Permit Fee, per amendment history most recently set by Ordinance 2024-30 (approved 11/6/2024), superseding the 0.00658 rate set by Ordinance 2024-04 (1/17/2024). Total permit value determined using ICC Building Valuation Data, updated annually January 1st. Per the Building Department's own published FAQ, the base fee for smaller/simpler projects is a flat $151.50 (furnace/water heater changeout, reroofing, window/door replacement, exterior wall covering) or $251.50 (basic decks, small sheds, basement finishing valued at $15,000 or less); once $15,000 valuation is exceeded, fees are calculated per square foot (FAQ example: a 1,500 sq ft detached garage/shop permit fee is $765.44). |
| Plan Check Fee (Single Family Dwelling) | 0.0040 x total permit value | Grantsville City Consolidated Fee Schedule, 'Single Family Dwelling Permit Fees' — Plan Check Fee, set by Ordinance 2024-30 (approved 11/6/2024). Does not apply to manufactured or mobile homes unless sitting on a foundation, or to agricultural buildings. |
| Water Cap Impact Fee | $3,036.00 (3/4-inch meter) | Grantsville City Consolidated Fee Schedule, Single Family Dwelling Permit Fees section. |
| Indoor Water Acquisition Impact Fee | $4,033.00 / dwelling unit | Grantsville City Consolidated Fee Schedule, Single Family Dwelling Permit Fees section. |
| Outdoor Water Acquisition Impact Fee | $6,336.00–$39,427.00 (waived if sufficient secondary water shares appurtenant to the property are provided; reduced to $4,338.00–$26,995.00 with xeriscape reduction) | Grantsville City Consolidated Fee Schedule, Single Family Dwelling Permit Fees section. |
| Sewer Cap Impact Fee | $1,529.00 | Grantsville City Consolidated Fee Schedule, Single Family Dwelling Permit Fees section. |
| Public Safety Impact Fee | $590.00 / dwelling unit | Grantsville City Consolidated Fee Schedule, Single Family Dwelling Permit Fees section. |
| Park Impact Fee | $1,925.00 / dwelling unit | Grantsville City Consolidated Fee Schedule, Single Family Dwelling Permit Fees section. |
| Water Meter Fee | $350.00 (3/4-inch meter) | Grantsville City Consolidated Fee Schedule, Single Family Dwelling Permit Fees section. |
| Sewer Lateral Inspection Fee | $125.00 | Grantsville City Consolidated Fee Schedule; must be performed by a Licensed Bonded Contractor. |
| State Surcharge | 1% of Building Permit Fee | Grantsville City Consolidated Fee Schedule — remitted to the State of Utah. |
| Credit/Debit Card Fee | 2.5% | Grantsville City Consolidated Fee Schedule. |
| Re-Inspection Fee | $25.00 | Grantsville City Consolidated Fee Schedule, General Building Fees section (Ordinance 2024-04). |
| Work Without a Permit Penalty | $25.00 fee; building fees may additionally be doubled per the Required Basement/Inspection List notice | Grantsville City Consolidated Fee Schedule, General Building Fees section; Show full citationHideGrantsville City Consolidated Fee Schedule, General Building Fees section; the city's official Inspection List document separately states: 'If construction, remodeling, or repairs that require a building permit are begun prior to the permit being issued, building fees may be doubled.' |
Accessory Structure Permit
VerifiedRequired for residential and commercial accessory structures (sheds, detached garages, shops) in Grantsville above the size/utility thresholds in the city's published Accessory Structure Requirements. Uses the same valuation-based Building Permit Fee and Plan Check Fee as the Single Family Dwelling schedule.
Verified 2026-07-08 · Source
Requirements
- Residential accessory structures 200 sq ft or larger, OR any size if electrical/HVAC/plumbing is being installed
- Commercial accessory structures over 120 sq ft
- 5 ft minimum setback from all property lines (or 1-hour fire-rated walls/roof eaves if closer), per IBC as referenced in the city's Accessory Structure Requirements
- Structures 600 sq ft or larger, or with wall height over 10.1 ft, require a frost-protected foundation (30" below finished grade); engineering required over a 30 ft wall length or if 4 ft of shear wall cannot be obtained at each corner
- All metal buildings require engineered plans and calculations
Required documents
- RequiredAccessory Structure Requirements sheetGrantsville City's official published guidance on when a permit is required and the applicable foundation/engineering thresholds for residential and commercial accessory structures.
- RequiredGrantsville Building Permit Application (fillable PDF)Official fillable application form, published on the Building Department's Checklists & Forms page.
- RequiredSite PlanShowing lot dimensions, setbacks, and easements per Grantsville's SFD Submittal Checklist requirements (applied to accessory structures at the Building Department's discretion).
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based, general/non-SFD structures) | Total permit value < $15,000: $150.00 flat fee. Total permit value >= $15,000: fee calculated per the city's per-square-foot valuation schedule (ICC Building Valuation Data). | Grantsville City Consolidated Fee Schedule, 'General Building Fees' section: 'Building Permit Fee $150.00 when total permit value does not exceed $15,000.00.' Per the Building Department's own FAQ,… Show full citationHideGrantsville City Consolidated Fee Schedule, 'General Building Fees' section: 'Building Permit Fee $150.00 when total permit value does not exceed $15,000.00.' Per the Building Department's own FAQ, example accessory-structure-scale fees include $251.50 flat for a basic shed valued at $15,000 or less, or a per-square-foot calculation above that threshold (e.g., $765.44 for a 1,500 sq ft detached garage/shop). |
| Plan Check Fee (general/non-SFD structures) | Total permit value < $15,000: $100.00 flat fee. Total permit value >= $15,000: 0.00463 x total permit value (minimum $100.00). | Grantsville City Consolidated Fee Schedule, 'General Building Fees' section, as amended by Ordinance 2024-04 (1/17/2024). |
| State Surcharge | 1% of Building Permit Fee | Grantsville City Consolidated Fee Schedule, General Building Fees section. |
| Re-Inspection Fee | $25.00 | Grantsville City Consolidated Fee Schedule, General Building Fees section. |
Commercial Building Permit
VerifiedRequired for new commercial and industrial construction in Grantsville, regulated by the state-adopted 2024 IBC with Utah amendments (Utah Code § 15A-2-103(1)(a), effective 7/1/2026). Grantsville's Consolidated Fee Schedule publishes a distinct 'Commercial/Industrial Building Permit Fees' table, separate from its Single Family Dwelling and Multi-Family tables, most recently amended by Ordinance 2024-30 (approved 11/6/2024) for the Building Permit Fee rate and Ordinance 2024-37 (adopted 12/4/2024) for the Plan Check Fee rate.
Verified 2026-07-19 · Source
Requirements
- New commercial or industrial construction, or any work regulated by the adopted 2024 IBC with Utah amendments
- Complete building permit application per Utah Code Title 15A completeness requirements, including applicant/general contractor contact information
- Site plan showing lot size and dimensions, setbacks, hard surface areas, existing/proposed utilities, and street names
- Construction plans and drawings including structural, electrical, mechanical, and plumbing design
- Engineering structural calculations stamped and signed by a Utah-licensed engineer
- Commercial accessory structures over 120 sq ft require their own permit, per Grantsville's Accessory Structure Requirements (a lower no-permit threshold than the 200 sq ft residential one)
Required documents
- RequiredGrantsville Building Permit Application (fillable PDF)Official fillable application form, published on the Building Department's Checklists & Forms page; the same application form is used for residential and commercial/industrial permits.
- RequiredSite PlanShowing lot dimensions, setbacks, utilities, and hard surface areas.
- RequiredConstruction Plans and Structural EngineeringStructural, electrical, mechanical, and plumbing design, stamped by a licensed engineer where required.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (Commercial/Industrial, valuation-based) | 0.0068 x total permit value | Grantsville City Consolidated Fee Schedule, 'Commercial/Industrial Building Permit Fees' section (Exhibit A to Ordinance 2024-37, Record of Ordinance Adoption, utah.gov/pmn/files/1205659.pdf):… Show full citationHideGrantsville City Consolidated Fee Schedule, 'Commercial/Industrial Building Permit Fees' section (Exhibit A to Ordinance 2024-37, Record of Ordinance Adoption, utah.gov/pmn/files/1205659.pdf): 'Building Permit Fee .0068 x total permit value.' Same rate as the Single Family Dwelling table. Total permit value determined using ICC Building Valuation Data, updated annually January 1st. |
| Plan Check Fee (Commercial/Industrial) | 0.0049 x total permit value | Grantsville City Consolidated Fee Schedule, 'Commercial/Industrial Building Permit Fees' section: 'Plan Check Fee ... Show full citationHideGrantsville City Consolidated Fee Schedule, 'Commercial/Industrial Building Permit Fees' section: 'Plan Check Fee ... .0049 x total permit value.. (This fee does not apply to manufactured or mobile homes unless siting on a foundation, or agricultural buildings).' A higher rate than the 0.0040 rate on the Single Family Dwelling table; the source PDF shows a rendering artifact carrying over the prior page's '.0040' label immediately before the '.0049' figure — reported here as .0049, the value stated for this Commercial/Industrial section specifically. |
| Transportation Impact Fee (Commercial/Industrial) | $1,029.43 / 1,000 sf Building Area | Grantsville City Consolidated Fee Schedule, Commercial/Industrial Building Permit Fees section. |
| Indoor Water Acquisition Impact Fee (Commercial/Industrial) | $277.00 / fixture unit | Grantsville City Consolidated Fee Schedule, Commercial/Industrial Building Permit Fees section. |
| Outdoor Water Acquisition Impact Fee (Commercial/Industrial) | Not capped. Calculated: irrigated acres x 3.33 acre-feet/irrigated acre x $25,000/acre-foot | Grantsville City Consolidated Fee Schedule, Commercial/Industrial Building Permit Fees section; waived if enough appurtenant secondary water shares are provided per Grantsville City Ordinance. |
| Indoor Water Cap Impact Fee (Commercial/Industrial) | $35.00 / unit | Grantsville City Consolidated Fee Schedule, Commercial/Industrial Building Permit Fees section. |
| Outdoor Water Cap Impact Fee (Commercial/Industrial) | $21,694.03 / irrigated acre | Grantsville City Consolidated Fee Schedule, Commercial/Industrial Building Permit Fees section. |
| Sewer Cap Impact Fee (Commercial/Industrial) | $213.37 / fixture unit | Grantsville City Consolidated Fee Schedule, Commercial/Industrial Building Permit Fees section. |
| Public Safety Fee (Commercial/Industrial) | $953.80 / 1,000 sq ft building area | Grantsville City Consolidated Fee Schedule, Commercial/Industrial Building Permit Fees section. |
| Water Meter Fee | $350.00 (3/4-inch meter) | Grantsville City Consolidated Fee Schedule; larger meter sizes priced at request. |
| State Surcharge | 1% of building permit fee | Grantsville City Consolidated Fee Schedule, Commercial/Industrial Building Permit Fees section — remitted to the State of Utah. |
| Sewer Lateral/Offsite Inspection Fee | $125.00 | Grantsville City Consolidated Fee Schedule; must be performed by a Licensed Bonded Contractor. |
| Credit/Debit Card Fee | 2.5% | Grantsville City Consolidated Fee Schedule. |
Commercial Tenant Improvement / Tenant Finish Permit
Required for tenant improvement and remodel work inside an existing commercial or industrial building in Grantsville. Grantsville's Consolidated Fee Schedule does not publish a separate tenant-improvement fee table distinct from new commercial construction — tenant improvement work is assessed under the same 'Commercial/Industrial Building Permit Fees' table (Building Permit Fee 0.0068 x valuation, Plan Check Fee 0.0049 x valuation), scaled to the tenant improvement scope's own ICC valuation rather than the full building's value.
Reviewed 2026-07-19 · Source
Requirements
- Tenant improvement or remodel work within an existing commercial or industrial building, regulated by the adopted 2024 IBC with Utah amendments
- Complete building permit application
- Floor plan showing existing vs. planned conditions and specific use of each area
- Construction plans and structural/electrical/mechanical/plumbing design applicable to the scope of work
- Engineering structural calculations where structural elements are affected
Required documents
- RequiredGrantsville Building Permit Application (fillable PDF)Same city-wide application form used for all building permit types.
- RequiredFloor Plan (existing vs. planned)Showing the specific use of each area affected by the tenant improvement.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (Commercial/Industrial, valuation-based) | 0.0068 x total permit value | Grantsville City Consolidated Fee Schedule, Commercial/Industrial Building Permit Fees section — the same table used for new commercial/industrial construction; Show full citationHideGrantsville City Consolidated Fee Schedule, Commercial/Industrial Building Permit Fees section — the same table used for new commercial/industrial construction; Grantsville does not publish a distinct tenant-improvement fee line, so this general Commercial/Industrial rate is reported here, scaled to the tenant improvement's own valuation. |
| Plan Check Fee (Commercial/Industrial) | 0.0049 x total permit value | Grantsville City Consolidated Fee Schedule, Commercial/Industrial Building Permit Fees section. |
| State Surcharge | 1% of building permit fee | Grantsville City Consolidated Fee Schedule. |
| Credit/Debit Card Fee | 2.5% | Grantsville City Consolidated Fee Schedule. |
Sign Permit
VerifiedRequired to erect or maintain nearly any sign or outdoor advertising structure in Grantsville under City Code Chapter 20 (Sign Regulations), § 20.4. Approval is evidenced by a permit issued by the Community Development Director, Zoning Administrator, or their designee. The Zoning Fees schedule sets a Sign Permit fee of $200.00 for permanent signs and $25.00 for temporary signs.
Verified 2026-07-20 · Source
Requirements
- It is illegal to erect or maintain any sign or outdoor advertising structure without first obtaining City approval, evidenced by a permit from the Community Development Director, Zoning Administrator, or designee — except temporary nonelectrical wall signs under 6 square feet, which need no approval (City Code § 20.4)
- Movable A-frame signs displaying a menu or special message require a permit, are capped at the ordinance's stated size of 30" x 36" (the ordinance's own text elsewhere restates this as '30" x 48"' — both figures appear verbatim in § 20.4, so confirm the current dimension with Community Development), must be stored inside during closed hours, and must stay within 3 feet of the storefront
- Roof signs require a permit and Community Development Director/Zoning Administrator approval of a design that hides all supporting members; roof sign area counts against the wall's total allowed wall-sign area
- Banner signs are permitted only under specific time limits: 60 consecutive days for a temporary promotion (once per business location), up to 6 months (plus one 6-month Planning Commission extension) for a new business without permanent signage, 60 days for a bankruptcy/going-out-of-business promotion, or 30 days per quarter for other sales/events (§ 20.4)
- Off-premises billboard signs and off-premises outdoor advertising structures are not permitted anywhere in Grantsville (traffic/directional signs excepted) (§ 20.4)
Required documents
- RequiredSign Permit ApplicationReviewed by the Community Development Director, Zoning Administrator, or their designee before a permit is issued (City Code § 20.4)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Sign Permit — Permanent Sign | $200.00 | Grantsville City Zoning Fees schedule: 'Sign Permit $200.00 (permanent sign) / $25.00 (temporary sign).' Fetched and confirmed live 2026-07-20 from the city's official municipal code fee book. |
| Sign Permit — Temporary Sign | $25.00 | Grantsville City Zoning Fees schedule, same line item as the permanent-sign fee above. |
EV Charger / EVSE Permit
Grantsville City does not publish a separate EV-charger/EVSE permit or fee. Per Grantsville Ordinance 2024-04 (Building Fees Update), which amends the Grantsville City Consolidated Fee Schedule, building permit fees are calculated as a percentage of total permit value (e.g., 0.0065-0.0075 x total permit value depending on structure type), using ICC Building Valuation Data updated annually, with no distinct Electrical, Mechanical, or Plumbing sub-fee and no EV-specific line item. EV charger installation is therefore handled as standard electrical work under this same valuation-based Building Permit; no EV-specific dollar figure is asserted here.
Reviewed 2026-07-20 · Source
Requirements
- Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Grantsville
- Electrical work regulated statewide by the 2023 NEC (Utah Code § 15A-2-103(1)(g))
- Building permit application submitted via grantsvilleut.portal.iworq.net
Required documents
- RequiredBuilding Permit Application (iWorq portal)Submitted online at grantsvilleut.portal.iworq.net; no dedicated EV-charger application form is published.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (single-family dwelling) | .00658 x total permit value | Grantsville Ordinance 2024-04 (Building Fees Update), Section 2, 'Single Family Dwelling Permit Fees' (as amended). Show full citationHideGrantsville Ordinance 2024-04 (Building Fees Update), Section 2, 'Single Family Dwelling Permit Fees' (as amended). Total permit value determined using ICC Building Valuation Data, updated annually January 1. No distinct EV-charger or standalone-electrical dollar figure is published. |
| Building Permit Fee (general/commercial, when total permit value does not exceed $15,000) | $150.00 flat | Grantsville Ordinance 2024-04, Section 1, 'General Building Fees.' Applies when total permit value does not exceed $15,000 — potentially relevant to a standalone EV charger install, though not explicitly named. |
Solar / Solar PV Installation Permit
VerifiedGrantsville City does not publish a separate solar/solar-PV permit application, checklist, or fee. The city's official 'When Do I Need a Building Permit?' handout explicitly lists 'Solar panels' under 'Requires Permits — Outside' alongside decks, garages, and room additions, with no distinct solar-specific line item anywhere in the Grantsville City Consolidated Fee Schedule (confirmed by direct review of the General, Single Family Dwelling, Multi-Family, and Commercial/Industrial Building Permit Fees tables in Ordinance 2024-37's Exhibit A print-preview). Solar PV installations are therefore processed as a standard Building Permit (with associated electrical work) using the same valuation-based Building Permit Fee and Plan Check Fee — or the flat General Building Fees rate for permits valued under $15,000 — as any other building/electrical permit, governed by the state-adopted 2024 IBC / 2021 IRC and 2023 NEC (which includes NEC Article 690, Solar Photovoltaic Systems) with Utah amendments.
Verified 2026-07-21 · Source
Requirements
- Building permit required for rooftop or ground-mount solar panel installation — listed explicitly under 'Requires Permits — Outside' on Grantsville's official 'When Do I Need a Building Permit?' handout
- Electrical work connecting the PV system is regulated by the 2023 NEC with Utah amendments (Utah Code § 15A-2-103(1)(g)), including NEC Article 690 (Solar Photovoltaic Systems)
- Structural review of roof-mount attachment points and load path per the adopted 2021 IRC / 2024 IBC with Utah amendments
- Building Permit Application submitted through the IWorq Permit Portal (grantsvilleut.portal.iworq.net)
- No separate solar-specific application form, submittal checklist, or fee schedule line item is published by Grantsville as of 2026-07-21 — confirm scope of required documentation with the Building Department
Required documents
- RequiredGrantsville Building Permit Application (fillable PDF)Same city-wide fillable application form used for all Grantsville building permit types, published on the Building Department's Checklists & Forms page; no dedicated solar-specific application form is published.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (valuation-based, General Building Fees table) | Total permit value < $15,000: $150.00 flat fee. Total permit value >= $15,000: fee calculated per the city's per-square-foot valuation schedule (ICC Building Valuation Data). | Grantsville City Consolidated Fee Schedule, 'General Building Fees' section (as amended by Ordinance 2024-04, 1/17/2024): 'Building Permit Fee $150.00 when total permit value does not exceed… Show full citationHideGrantsville City Consolidated Fee Schedule, 'General Building Fees' section (as amended by Ordinance 2024-04, 1/17/2024): 'Building Permit Fee $150.00 when total permit value does not exceed $15,000.00.' No solar/PV-specific line item is published anywhere in the fee schedule; solar panel installations are processed under this same general building-permit fee table per the city's official 'When Do I Need a Building Permit?' handout, which lists 'Solar panels' under 'Requires Permits — Outside' with no distinct fee noted. |
| Building Permit Fee (Single Family Dwelling table, if solar valuation is rolled into new-home construction) | 0.0068 x total permit value | Grantsville City Consolidated Fee Schedule, Single Family Dwelling Permit Fees section (Ordinance 2024-30, approved 11/6/2024) — applies only if the PV system is included in a new single-family dwelling's total permit valuation rather than filed as a standalone retrofit permit. |
| Plan Check Fee (General Building Fees table) | Total permit value < $15,000: $100.00 flat fee. Total permit value >= $15,000: 0.00463 x total permit value (minimum $100.00). | Grantsville City Consolidated Fee Schedule, 'General Building Fees' section, as amended by Ordinance 2024-04 (1/17/2024). |
| State Surcharge | 1% of Building Permit Fee | Grantsville City Consolidated Fee Schedule — remitted to the State of Utah. |
| Credit/Debit Card Fee | 2.5% | Grantsville City Consolidated Fee Schedule. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fee schedules
Applications & forms
Checklists & handouts
Online permit portal
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Grantsville building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.