Version history — Eagle Mountain, Utah
This is PermitBase’s own verified record for Eagle Mountain, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Eagle Mountain’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- 2026-08-25Superseded
- 2026-08-21Superseded
- Eagle Mountain, Utah — Accessory Dwelling Unit (ADU) Permit fee record updated: $200 → $230
- 2026-07-30Superseded
- Eagle Mountain, Utah — EV Charger / EVSE Permit fee record added: EV Charger Permit (Non-Valuation Based Permit — Electrical Vehicle Charger) ($150.00 (flat))
- Eagle Mountain, Utah — EV Charger / EVSE Permit fee record added: Residential Plan Review Fee (40% of the permit fee)
- Eagle Mountain, Utah — EV Charger / EVSE Permit fee record added: State construction surcharge (1% of the permit fee)
- Eagle Mountain, Utah — EV Charger / EVSE Permit fee record added: First Reinspection Fee (if required) ($50.00 per trade)
- 2026-07-22Superseded
- 2026-07-20Superseded
- Eagle Mountain, Utah — EV Charger / EVSE Permit record added
- 2026-07-19Superseded
- 2026-07-16Superseded
- 2026-06-30Superseded
- Eagle Mountain, Utah — fee schedule re-verified across 7 permit types
- Eagle Mountain, Utah — permit-type records re-verified (28 updates)
- Eagle Mountain, Utah — Accessory Dwelling Unit (ADU) Permit record added
- 2026-06-27Initial record — coverage of Eagle Mountain began
- Eagle Mountain, Utah — plan-review timeline record updated: 10–14 business days
- Eagle Mountain, Utah — plan-review timeline record updated: 10–14 business days