Version history — Santaquin, Utah
This is PermitBase’s own verified record for Santaquin, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Santaquin’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- 2026-08-21Superseded
- 2026-07-22Superseded
- 2026-07-21Superseded
- 2026-07-20Superseded
- Santaquin, Utah — Sign Permit fee record added: Temporary Sign Permit ($30.00 flat fee)
- Santaquin, Utah — Sign Permit fee record added: Permanent Sign Permit (As per Building fees -- valuation-based, determined by structure (same mechanism as the general Building Permit & Inspection Fees))
- Santaquin, Utah — Sign Permit fee record removed: Sign Permit Fee
- Santaquin, Utah — Sign Permit record added
- Santaquin, Utah — Fire Sprinkler System Permit record added
- Santaquin, Utah — Fire Alarm System Permit record added
- Santaquin, Utah — EV Charger / EVSE Permit record added
- 2026-07-19Superseded
- 2026-07-16Superseded
- 2026-07-07Initial record — coverage of Santaquin began