This is PermitBase’s published record for Unincorporated Utah County as of 2026-07-16. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Unincorporated Utah County building permits

Verified

Unincorporated Utah County, Utah — as published 2026-07-16.

Verified 2026-07-16 · Source

Codes adopted

2024 International Building Code (IBC), including Appendices C and J — current statewide code per Utah Code § 15A-2-103(1)(a), in force since July 1, 2026 (superseded the 2021 IBC); confirmed matching the County's own Building page, which lists 'International Building Code 2024' as of 2026-07-162021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 code cycle flip; confirmed matching the County's own Building page, which lists 'International Residential Code 2021' as of 2026-07-162024 International Plumbing Code (IPC) — current statewide code per Utah Code § 15A-2-103(1)(d), in force since July 1, 2026 (superseded the 2021 IPC); confirmed matching the County's own Building page as of 2026-07-162024 International Mechanical Code (IMC) — current statewide code per Utah Code § 15A-2-103(1)(e), in force since July 1, 2026 (superseded the 2021 IMC); confirmed matching the County's own Building page as of 2026-07-162024 International Fuel Gas Code (IFGC) — current statewide code per Utah Code § 15A-2-103(1)(f), in force since July 1, 2026 (superseded the 2021 IFGC); confirmed matching the County's own Building page as of 2026-07-162023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unchanged by the July 1, 2026 code cycle flip; confirmed matching the County's own Building page as of 2026-07-162024 International Energy Conservation Code (IECC) — current statewide code per Utah Code § 15A-2-103(1)(h), in force since July 1, 2026 (superseded the 2021 IECC; one edition applies statewide, no separate residential/commercial split); confirmed matching the County's own Building page as of 2026-07-162024 International Existing Building Code (IEBC) — current statewide code per Utah Code § 15A-2-103(1)(i), in force since July 1, 2026 (superseded the 2021 IEBC); confirmed matching the County's own Building page as of 2026-07-16Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — current statewide code per Utah Code § 15A-2-103(1)(n), in force since July 1, 2026 (superseded the 2021 ISPSC); not separately itemized on the County's own Building page as of 2026-07-16, added here as it applies statewideNOTE: The July 1, 2026 statewide code cycle flip (Utah Code § 15A-2-103, amended by Ch. 47, 2026 General Session) is now in effect. The County's own Building page was re-checked live on 2026-07-16 and has ALREADY been updated to reflect it — it now lists IBC 2024, IPC 2024, IMC 2024, IFGC 2024, IECC 2024, and IEBC 2024, alongside the unchanged IRC 2021 and NEC 2023. This supersedes the prior 2026-06-30 note recorded here (which said the page still showed '2021 IBC'); the County's page is current, not lagging.

Permit types & fees

Residential Building Permit

Verified

Required before commencing any building or construction work, changing the use of a building, or performing work on electrical, gas, mechanical, or plumbing systems regulated by adopted codes in Unincorporated Utah County. Issued by the Utah County Community Development Building Division.

Verified 2026-07-16 · Source

Requirements

  • New single-family or multi-family residential construction
  • Additions, structural alterations, and modifications to existing structures
  • Conversion of non-habitable space to habitable space
  • Any work on electrical, gas, mechanical, or plumbing systems requiring code compliance
  • Contact the Building Official (stevek@utahcounty.gov) for exemption guidance

Required documents

  • RequiredBuilding Permit Application (All Projects)Submit completed application in person or electronically per the submittal requirements. Available at https://codev.utahcounty.gov/codev/forms/building-permit-application-2026.pdf
  • RequiredConstruction PlansPer the Single Family Submittal Requirements checklist (https://codev.utahcounty.gov/codev/forms/submittal-requirements-single-family-2026.pdf) — site plan, floor plans, elevations, structural details, engineered truss plans for new construction
  • RequiredSite PlanProperty plan showing setbacks, footprint, and existing structures. See Site Plan Example at https://codev.utahcounty.gov/codev/forms/site-plan-example-2018.pdf
  • OptionalHealth Department ApprovalRequired if project involves plumbing fixtures connecting to private water/sewer, or is within 5 feet of an existing septic system. Complete the attached Health Dept form in the Building Permit Application PDF.
  • OptionalOwner/Builder Certification (if applicable)Required for new residential or remodel construction performed by the owner-builder. https://codev.utahcounty.gov/codev/forms/owner-builder-certification-2026.pdf

Fee schedule

Fee typeAmountNotes
Building Permit — R-3/R-4 Residential (single-family/townhome)$1.00 per square foot
Utah County Code, Fee Schedule — Building Permits, Exhibit A 'Permit Fee by Building Type & Size' (effective 4/3/2012). Show full citation

Utah County Code, Fee Schedule — Building Permits, Exhibit A 'Permit Fee by Building Type & Size' (effective 4/3/2012). Per-square-foot multiplier for R-3/R-4 Residential. Includes Plan Review Fee and State of Utah Surcharge; does not include bonds. The Building Official may reduce the fee if it substantially exceeds the cost of providing the service. Adopted by County Commission (Utah Code § 17-5-214); fee schedule last updated March 13, 2019. Re-verified live 2026-07-16 against the codified FEE_SCHEDULE: $1.00/sq ft R-3/R-4 (and $1.50 R-1/R-2, $0.30 unfinished basement, $300.00 New Buildings submittal, $101.00 minimum) all unchanged; Exhibit A still effective 4/3/2012, schedule header still shows LAST UPDATE: March 13, 2019.

Building Permit — R-1/R-2 Hotels & Multi-Family$1.50 per square footUtah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Per-square-foot multiplier for R-1/R-2 Hotels & Multi-Family. Includes Plan Review Fee and State of Utah Surcharge.
Unfinished Basement$0.30 per square footUtah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Per-square-foot multiplier for Unfinished Basements (All Occupancies). Includes Plan Review Fee and State surcharge.
Building Permit Submittal Fee — New Buildings$300.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012), 'Building Permit Submittal Fees — New Buildings.' Separate from the per-square-foot building permit fee.
Minimum Permit Fee$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012), 'Permit Fee by Activity & Flat Fee — Minimum permit fee.' Floor applied to small projects.

Electrical Permit

Verified

Required for electrical work in Unincorporated Utah County including panel upgrades, new circuits, service changes, and new construction wiring. Governed by the 2023 National Electrical Code (NEC) as adopted by Utah Code § 15A-2-103(1)(g).

Verified 2026-07-16 · Source

Requirements

  • New electrical circuits or wiring installations
  • Electrical panel upgrades or replacements
  • Service entrance changes
  • Adding or relocating outlets, switches, or fixtures
  • Solar panel and generator electrical connections

Required documents

  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application form (same form used for all permit types)
  • OptionalContractor LicenseValid Utah electrical contractor license (Utah DOPL) if not performed by the homeowner on owner-occupied property

Fee schedule

Fee typeAmountNotes
Residential Electrical Service Upgrade / Replacement$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012), 'Permit Fee by Activity & Flat Fee.' Flat rate.
Temporary Power Pedestal$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Flat rate.
New Commercial Electrical Service$303.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012), listed under 'Commercial/Utility Equipment & New Commercial Electrical Services.' Flat rate.
Commercial Electrical Service Upgrade$303.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Flat rate.
Add Electrical to Building Without Power$505.00
Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Show full citation

Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Flat rate. Re-verified live 2026-07-16: the schedule's $505.00 tier lists 'Adding Electrical to a Building Without Power' verbatim — a drift-detector 'not found' flag on this figure was a false alarm; all electrical flat fees in this section ($101.00/$303.00/$505.00) unchanged.

Inspection Per Visit (Normal Business Hours)$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Applies when additional inspections are required.
Re-Inspection Fee (Normal Business Hours)$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012).

Plumbing Permit

Verified

Required for plumbing installations, alterations, and repairs in Unincorporated Utah County including water heaters, fixture additions, and gas line work. Governed by the 2024 International Plumbing Code (IPC) as adopted by Utah Code § 15A-2-103(1)(d), in force since July 1, 2026.

Verified 2026-07-16 · Source

Requirements

  • New plumbing fixture installations (sinks, toilets, showers)
  • Water heater installation or replacement (including like-for-like)
  • Water line or sewer line replacement or extension
  • Gas line installation or modification
  • Backflow prevention device installation

Required documents

  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application form with scope of work
  • OptionalHealth Department ApprovalRequired if work affects connection to private water or sewer system — complete the Health Department section of the Building Permit Application
  • OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) if not performed by the homeowner on owner-occupied property

Fee schedule

Fee typeAmountNotes
Plumbing permit — minimum permit fee$101.00
Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Show full citation

Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). The schedule does not list separate plumbing fixture-by-fixture fees; the 'Minimum permit fee' of $101.00 applies. Confirm scope with the Building Division at (801) 851-8342. Re-verified live 2026-07-16: unchanged — still no fixture-by-fixture plumbing fees on the codified schedule; the $303.00 'Adding Plumbing to a Building Without Plumbing Facilities' rate also confirmed.

Adding Plumbing to a Building Without Plumbing Facilities$303.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Flat rate for adding plumbing to a building that previously had none.

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, and air conditioning installations, replacements, and ductwork modifications in Unincorporated Utah County. Governed by the 2024 International Mechanical Code (IMC) as adopted by Utah Code § 15A-2-103(1)(e), in force since July 1, 2026.

Verified 2026-07-16 · Source

Requirements

  • Furnace or boiler installation or replacement (including like-for-like)
  • Air conditioning system installation or replacement
  • Ductwork installation or major modification
  • Evaporative cooler installation
  • Fireplace insert or wood-burning stove installation

Required documents

  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application form with equipment description and scope of work
  • OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, or heat pump
  • OptionalContractor LicenseValid Utah HVAC/mechanical contractor license (Utah DOPL) if not performed by the homeowner on owner-occupied property

Fee schedule

Fee typeAmountNotes
Replacement of AC Units, Furnaces, Water Heaters, Boilers, or Similar Equipment$101.00
Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012), 'Permit Fee by Activity & Flat Fee.' Single flat rate covering replacement of AC units, furnaces, water heaters,… Show full citation

Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012), 'Permit Fee by Activity & Flat Fee.' Single flat rate covering replacement of AC units, furnaces, water heaters, boilers, or similar equipment. Re-verified live 2026-07-16: $101.00 replacement rate and $303.00 'Adding Mechanical' rate both unchanged on the codified schedule.

Adding Mechanical to a Building Without Mechanical Equipment or Service$303.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Flat rate for adding mechanical equipment/service to a building that previously had none.
Re-Inspection Fee (Normal Business Hours)$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012).

Roofing Permit

Verified

Required for roof replacement, re-roofing, and structural roof repairs in Unincorporated Utah County. Permit fees are based on the remodeling rate from the county fee schedule.

Verified 2026-07-16 · Source

Requirements

  • Complete roof replacement (tear-off and re-roof)
  • Overlay of new roofing over existing (where code allows)
  • Structural roof repairs or modifications
  • Changes to roofing material type

Required documents

  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application with scope of work, square footage, and material specifications
  • OptionalContractor LicenseValid Utah roofing contractor license (Utah DOPL) if not performed by the homeowner

Fee schedule

Fee typeAmountNotes
Roofing / Re-roofing (Remodeling category)$0.30 per square foot
Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Show full citation

Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Roofing falls under 'Remodeling' (All Occupancies) at $0.30/sq ft, which includes Plan Review Fee and State surcharge. A $101.00 minimum permit fee applies. Re-verified live 2026-07-16: Remodeling still $0.30/sq ft and minimum still $101.00 on the codified schedule.

Minimum Permit Fee$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). The minimum permit fee applies to small remodeling/roofing jobs.

Solar Panel Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems in Unincorporated Utah County. Both a building permit (structural mounting) and an electrical permit (wiring) are typically required. A Residential Solar Plan Submittal Checklist is available from the County.

Verified 2026-07-16 · Source

Requirements

  • Rooftop solar panel installation
  • Ground-mounted solar array installation
  • Battery storage system installation
  • Electrical service upgrade for solar interconnection

Required documents

  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application for both the structural/building and electrical portions
  • RequiredResidential Solar Plan Submittal ChecklistComplete the county's Solar Submittal Checklist: https://codev.utahcounty.gov/codev/forms/solar-submittal-checklist-2021.pdf — includes site plan, electrical single-line diagram, structural analysis, and equipment specs
  • OptionalInterconnection AgreementUtility approval from Rocky Mountain Power for grid-tied systems

Fee schedule

Fee typeAmountNotes
Solar & Generator Power Installations (Not Including Accessory Structures)$303.00
Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Show full citation

Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). The current schedule lists a dedicated 'Solar & Generator Power Installations' flat rate of $303.00 (does not include accessory structures). Re-verified live 2026-07-16: $303.00 unchanged on the codified schedule.

Electrical service work for solar (if a separate electrical permit applies)$101.00 (residential electrical service upgrade/replacement)
Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Show full citation

Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). If a separate residential electrical service upgrade/replacement is required for interconnection, that flat rate is $101.00. The county's Residential Solar Plan Submittal Checklist (2021) references both building and electrical permits; confirm scope with the Building Division at (801) 851-8342.

Fence Permit

Verified

Required for fence installation in Unincorporated Utah County. The county fee schedule lists a flat rate for fences.

Verified 2026-07-16 · Source

Requirements

  • New fence construction
  • Replacement of existing fence (verify with Building Division whether same-location/same-height replacement requires a permit)
  • Powered gate installations

Required documents

  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application with fence height, material, and site plan
  • OptionalSite PlanShowing fence location relative to property lines and any easements

Fee schedule

Fee typeAmountNotes
Fences over 6 feet above grade and unpowered gates (building permit)$101.00
Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Show full citation

Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). A building permit is required for fences over 6 feet above grade (and unpowered gates) at a flat $101.00. Re-verified live 2026-07-16: $101.00 unchanged; the $50.00 Zone Compliance Permit line ('Fences under 8 ft. in height... and other minor structures and land uses that do not require a building permit, business license or temporary use permit') also confirmed verbatim under the FEE SCHEDULE's Community Development section.

Fences under 8 ft not requiring a building permit (Zone Compliance Permit)$50.00Utah County Code, Fee Schedule — Community Development. Fences under 8 ft in height and other minor structures that do not require a building permit, business license, or temporary use permit are handled under a Zone Compliance Permit at $50.00.

Deck Permit

Verified

Required for new deck construction or structural modification of existing decks in Unincorporated Utah County. The county fee schedule lists a flat rate for decks.

Verified 2026-07-16 · Source

Requirements

  • New deck construction (attached or freestanding)
  • Decks higher than 30 inches above grade
  • Structural modifications to existing decks
  • Adding or replacing a deck ledger

Required documents

  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application with scope of work and site plan
  • RequiredConstruction DrawingsFraming plan, footing details, ledger attachment method, and railing specifications per the Garage/Carport/Storage submittal requirements checklist
  • RequiredSite PlanShowing deck location, setbacks from property lines, and relationship to existing structure

Fee schedule

Fee typeAmountNotes
Porches, Decks, & Other Unwalled Structures$0.30 per square foot
Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Show full citation

Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Decks are charged on the per-square-foot multiplier ($0.30/sq ft) under 'Porches, Decks, & Other Unwalled Structures,' which includes Plan Review Fee and State surcharge. A $101.00 minimum permit fee applies. Re-verified live 2026-07-16: $0.30/sq ft unchanged on the codified schedule.

Demolition Permit

Verified

Required for partial or complete demolition of structures in Unincorporated Utah County, including coordination of utility disconnections and required asbestos surveys.

Verified 2026-07-16 · Source

Requirements

  • Complete demolition of any structure
  • Partial demolition involving structural elements
  • Removal of load-bearing walls
  • Demolition of structures with potential asbestos (pre-1980 construction)

Required documents

  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application with demolition scope, structure details, and disposal plan
  • RequiredUtility Disconnect ConfirmationProof that gas, electric, water, and sewer are disconnected prior to demolition — required before work begins
  • OptionalAsbestos SurveyFederal NESHAP regulations require an asbestos inspection before demolition of structures built before approximately 1980 — coordinate with Utah DEQ

Fee schedule

Fee typeAmountNotes
Demolition of a structure$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012), 'Permit Fee by Activity & Flat Fee — Demolition of a structure.' Flat rate. Re-verified live 2026-07-16: $101.00 unchanged on the codified schedule.

Water Heater Permit

Verified

Required for water heater installation, replacement, or conversion in Unincorporated Utah County. A subset of the plumbing permit, commonly pulled as a standalone for this frequent project type.

Verified 2026-07-16 · Source

Requirements

  • Water heater replacement (including like-for-like swaps)
  • New water heater installation
  • Conversion from tank to tankless
  • Gas line modification for water heater

Required documents

  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application with water heater type, size, fuel source, and location
  • OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) if not performed by the homeowner on owner-occupied property

Fee schedule

Fee typeAmountNotes
Water heater replacement (Replacement of AC Units, Furnaces, Water Heaters, Boilers, or Similar Equipment)$101.00
Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Show full citation

Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Water heater replacement is expressly listed within the combined flat-rate line 'Replacement of AC Units, Furnaces, Water Heaters, Boilers, or Similar Equipment' at $101.00. Re-verified live 2026-07-16: unchanged on the codified schedule.

Swimming Pool Permit

Verified

Required for in-ground and above-ground swimming pool installation in Unincorporated Utah County. The county fee schedule lists a dedicated per-square-foot rate for swimming pools.

Verified 2026-07-16 · Source

Requirements

  • In-ground swimming pool construction
  • Above-ground pools with a depth over 24 inches
  • Hot tubs and spas (built-in)
  • Pool barrier / fence installation (required for all pools)

Required documents

  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application with pool dimensions, depth, equipment location, and structural details
  • RequiredSite PlanPool location with setbacks, equipment pad, and barrier / fence layout
  • RequiredElectrical PlanPool pump, lighting, bonding, and GFCI protection details (NEC Article 680)

Fee schedule

Fee typeAmountNotes
Swimming Pools and Water Tanks$0.30 per square foot
Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Show full citation

Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). 'Swimming Pools and Water Tanks' (All Occupancies) is charged on the per-square-foot multiplier at $0.30/sq ft, which includes Plan Review Fee and State surcharge. A $101.00 minimum permit fee applies. Re-verified live 2026-07-16: $0.30/sq ft unchanged on the codified schedule.

Accessory Dwelling Unit (ADU)

Verified

Required for construction of a secondary dwelling unit on a residential property in Unincorporated Utah County, including basement apartments, detached cottages, and garage conversions. ADU permitting requires both a zoning clearance (Planning & Zoning) and a building permit.

Verified 2026-07-16 · Source

Requirements

  • Property must be in a zone permitting ADUs per the Utah County Land Use Ordinance
  • Obtain Zone Clearance from Planning & Zoning before applying for building permit
  • Separate entrance from primary dwelling
  • Adequate parking (check UCLUO for requirements)
  • Compliant with Utah HB 82 (2021) — counties must allow internal ADUs; detached ADUs subject to local zoning

Required documents

  • RequiredZone Clearance ApplicationObtain zone clearance from Planning & Zoning before building permit application. Submit at https://formitable.utahcounty.gov/zone-clearance/forms/new
  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application after zone clearance is obtained
  • RequiredConstruction PlansFull construction drawings per the Single Family Submittal Requirements checklist — floor plan, elevations, sections, egress details, fire separation between units

Fee schedule

Fee typeAmountNotes
ADU building permit — R-3/R-4 Residential rate$1.00 per square foot
Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Show full citation

Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). ADU construction follows the standard R-3/R-4 Residential per-square-foot multiplier of $1.00/sq ft. Includes Plan Review Fee and State surcharge. A separate $300.00 New Buildings submittal fee may apply. Under Utah law, impact fees for internal or attached ADUs may be reduced or waived — confirm with the Building Division at (801) 851-8342. Re-verified live 2026-07-16: $1.00/sq ft R-3/R-4 rate and $300.00 New Buildings submittal fee both unchanged on the codified schedule.

Basement Finish Permit

Verified

Required for finishing or remodeling an unfinished basement in Unincorporated Utah County. The county fee schedule has a specific category for finishing an unfinished basement based on the difference between the finished and unfinished multipliers.

Verified 2026-07-16 · Source

Requirements

  • Framing walls in an unfinished basement
  • Adding a bedroom (requires egress window)
  • Adding a bathroom (requires plumbing permit)
  • Electrical wiring for new rooms
  • Any structural modifications

Required documents

  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application with floor plan and scope of work
  • RequiredFloor PlanLayout showing room sizes, egress windows, and door locations

Fee schedule

Fee typeAmountNotes
Finishing of Unfinished BasementDifference Between Multipliers — $0.70 per square foot for R-3/R-4 residential ($1.00 finished − $0.30 unfinished)
Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Show full citation

Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). The schedule states 'Finishing of Unfinished Basement — Difference Between Multipliers,' i.e., the finished residential rate ($1.00/sq ft) minus the unfinished basement rate ($0.30/sq ft) = $0.70/sq ft. Includes Plan Review Fee and State surcharge; $101.00 minimum permit fee applies. Re-verified live 2026-07-16: 'Finishing of Unfinished Basement — Difference Between Multipliers' still verbatim on the codified schedule, and both component multipliers ($1.00 and $0.30) unchanged.

Grading & Excavation Permit

Verified

Required for significant grading, excavation, or land disturbance on properties in Unincorporated Utah County. The county fee schedule lists flat rates by volume.

Verified 2026-07-16 · Source

Requirements

  • Grading or filling that changes drainage patterns
  • Excavation deeper than 4 feet
  • Land disturbance over 1 acre (state UPDES stormwater permit also required)
  • Cut or fill exceeding limits set in the Utah County Land Use Ordinance
  • Hillside grading in sensitive slope areas

Required documents

  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application with grading plan and scope of work
  • RequiredGrading PlanExisting and proposed contours, cut/fill volumes, and drainage
  • RequiredErosion Control PlanSWPPP or erosion control measures during construction

Fee schedule

Fee typeAmountNotes
Grading up to 10,000 cubic yards$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012), 'Permit Fee by Activity & Flat Fee.' Flat rate.
Grading, 10,001 Cubic Yards or More (and Retaining Walls)$303.00
Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Show full citation

Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Flat rate for grading of 10,001 cubic yards or more (and retaining walls). Note: retaining walls over 4 feet are otherwise $101.00. Re-verified live 2026-07-16: both grading tiers ($101.00 up to 10,000 cu yd; $303.00 for 10,001+ and retaining walls) unchanged on the codified schedule.

Sources & verification

Verified against official sources. Last reviewed 2026-07-16.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Utah County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-06-30)Later version (2026-07-19) →View current record →All versions →

Permalink: /utah/utah-county/unincorporated-utah/as-of/2026-07-16/

Snapshot date: 2026-07-16

Commit: 0fd24e8

Reproducible from PermitBase’s version-controlled dataset, commit 0fd24e8.