Unincorporated Utah County building permits

Verified

Unincorporated Utah County, Utah — as published 2026-07-16.

Verified 2026-07-16 · Source

Codes adopted

2024 International Building Code (IBC), including Appendices C and J — current statewide code per Utah Code § 15A-2-103(1)(a), in force since July 1, 2026 (superseded the 2021 IBC); confirmed matching the County's own Building page, which lists 'International Building Code 2024' as of 2026-07-162021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); unchanged by the July 1, 2026 code cycle flip; confirmed matching the County's own Building page, which lists 'International Residential Code 2021' as of 2026-07-162024 International Plumbing Code (IPC) — current statewide code per Utah Code § 15A-2-103(1)(d), in force since July 1, 2026 (superseded the 2021 IPC); confirmed matching the County's own Building page as of 2026-07-162024 International Mechanical Code (IMC) — current statewide code per Utah Code § 15A-2-103(1)(e), in force since July 1, 2026 (superseded the 2021 IMC); confirmed matching the County's own Building page as of 2026-07-162024 International Fuel Gas Code (IFGC) — current statewide code per Utah Code § 15A-2-103(1)(f), in force since July 1, 2026 (superseded the 2021 IFGC); confirmed matching the County's own Building page as of 2026-07-162023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); unchanged by the July 1, 2026 code cycle flip; confirmed matching the County's own Building page as of 2026-07-162024 International Energy Conservation Code (IECC) — current statewide code per Utah Code § 15A-2-103(1)(h), in force since July 1, 2026 (superseded the 2021 IECC; one edition applies statewide, no separate residential/commercial split); confirmed matching the County's own Building page as of 2026-07-162024 International Existing Building Code (IEBC) — current statewide code per Utah Code § 15A-2-103(1)(i), in force since July 1, 2026 (superseded the 2021 IEBC); confirmed matching the County's own Building page as of 2026-07-16Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — current statewide code per Utah Code § 15A-2-103(1)(n), in force since July 1, 2026 (superseded the 2021 ISPSC); not separately itemized on the County's own Building page as of 2026-07-16, added here as it applies statewideNOTE: The July 1, 2026 statewide code cycle flip (Utah Code § 15A-2-103, amended by Ch. 47, 2026 General Session) is now in effect. The County's own Building page was re-checked live on 2026-07-16 and has ALREADY been updated to reflect it — it now lists IBC 2024, IPC 2024, IMC 2024, IFGC 2024, IECC 2024, and IEBC 2024, alongside the unchanged IRC 2021 and NEC 2023. This supersedes the prior 2026-06-30 note recorded here (which said the page still showed '2021 IBC'); the County's page is current, not lagging.

Permit types & fees

Residential Building Permit

Verified

Required before commencing any building or construction work, changing the use of a building, or performing work on electrical, gas, mechanical, or plumbing systems regulated by adopted codes in Unincorporated Utah County. Issued by the Utah County Community Development Building Division.

Verified 2026-07-16 · Source

Requirements

  • New single-family or multi-family residential construction
  • Additions, structural alterations, and modifications to existing structures
  • Conversion of non-habitable space to habitable space
  • Any work on electrical, gas, mechanical, or plumbing systems requiring code compliance
  • Contact the Building Official (stevek@utahcounty.gov) for exemption guidance

Required documents

  • RequiredBuilding Permit Application (All Projects)Submit completed application in person or electronically per the submittal requirements. Available at https://codev.utahcounty.gov/codev/forms/building-permit-application-2026.pdf
  • RequiredConstruction PlansPer the Single Family Submittal Requirements checklist (https://codev.utahcounty.gov/codev/forms/submittal-requirements-single-family-2026.pdf) — site plan, floor plans, elevations, structural details, engineered truss plans for new construction
  • RequiredSite PlanProperty plan showing setbacks, footprint, and existing structures. See Site Plan Example at https://codev.utahcounty.gov/codev/forms/site-plan-example-2018.pdf
  • OptionalHealth Department ApprovalRequired if project involves plumbing fixtures connecting to private water/sewer, or is within 5 feet of an existing septic system. Complete the attached Health Dept form in the Building Permit Application PDF.
  • OptionalOwner/Builder Certification (if applicable)Required for new residential or remodel construction performed by the owner-builder. https://codev.utahcounty.gov/codev/forms/owner-builder-certification-2026.pdf

Fee schedule

Fee typeAmountNotes
Building Permit — R-3/R-4 Residential (single-family/townhome)$1.00 per square footUtah County Code, Fee Schedule — Building Permits, Exhibit A 'Permit Fee by Building Type & Size' (effective 4/3/2012). Per-square-foot multiplier for R-3/R-4 Residential. Includes Plan Review Fee and State of Utah Surcharge; does not include bonds. The Building Official may reduce the fee if it substantially exceeds the cost of providing the service. Adopted by County Commission (Utah Code § 17-5-214); fee schedule last updated March 13, 2019. Re-verified live 2026-07-16 against the codified FEE_SCHEDULE: $1.00/sq ft R-3/R-4 (and $1.50 R-1/R-2, $0.30 unfinished basement, $300.00 New Buildings submittal, $101.00 minimum) all unchanged; Exhibit A still effective 4/3/2012, schedule header still shows LAST UPDATE: March 13, 2019.
Building Permit — R-1/R-2 Hotels & Multi-Family$1.50 per square footUtah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Per-square-foot multiplier for R-1/R-2 Hotels & Multi-Family. Includes Plan Review Fee and State of Utah Surcharge.
Unfinished Basement$0.30 per square footUtah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Per-square-foot multiplier for Unfinished Basements (All Occupancies). Includes Plan Review Fee and State surcharge.
Building Permit Submittal Fee — New Buildings$300.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012), 'Building Permit Submittal Fees — New Buildings.' Separate from the per-square-foot building permit fee.
Minimum Permit Fee$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012), 'Permit Fee by Activity & Flat Fee — Minimum permit fee.' Floor applied to small projects.

Electrical Permit

Verified

Required for electrical work in Unincorporated Utah County including panel upgrades, new circuits, service changes, and new construction wiring. Governed by the 2023 National Electrical Code (NEC) as adopted by Utah Code § 15A-2-103(1)(g). EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; the county's Exhibit A 'Permit Fee by Activity & Flat Fee' schedule and Community Development building page do not publish an EV-specific line item (checked 2026-07-19).

Verified 2026-07-16 · Source

Requirements

  • New electrical circuits or wiring installations
  • Electrical panel upgrades or replacements
  • Service entrance changes
  • Adding or relocating outlets, switches, or fixtures
  • Solar panel and generator electrical connections

Required documents

  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application form (same form used for all permit types)
  • OptionalContractor LicenseValid Utah electrical contractor license (Utah DOPL) if not performed by the homeowner on owner-occupied property

Fee schedule

Fee typeAmountNotes
Residential Electrical Service Upgrade / Replacement$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012), 'Permit Fee by Activity & Flat Fee.' Flat rate.
Temporary Power Pedestal$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Flat rate.
New Commercial Electrical Service$303.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012), listed under 'Commercial/Utility Equipment & New Commercial Electrical Services.' Flat rate.
Commercial Electrical Service Upgrade$303.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Flat rate.
Add Electrical to Building Without Power$505.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Flat rate. Re-verified live 2026-07-16: the schedule's $505.00 tier lists 'Adding Electrical to a Building Without Power' verbatim — a drift-detector 'not found' flag on this figure was a false alarm; all electrical flat fees in this section ($101.00/$303.00/$505.00) unchanged.
Inspection Per Visit (Normal Business Hours)$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Applies when additional inspections are required.
Re-Inspection Fee (Normal Business Hours)$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012).

EV Charger / EVSE Permit

Verified

Unincorporated Utah County does not publish a distinct EV charger / EVSE permit type or fee line item. The county's codified Fee Schedule (Utah County Code, Building Permits Exhibit A, effective 4/3/2012, last updated 3/13/2019, re-verified live 2026-07-19 and again 2026-07-20) itemizes numerous specific flat-fee electrical activities — Residential Electrical Service Upgrade/Replacement ($101.00), Temporary Power Pedestal ($101.00), New Commercial Electrical Service ($303.00), Commercial Electrical Service Upgrade ($303.00), and Adding Electrical to a Building Without Power ($505.00) — but contains no 'EV,' 'electric vehicle,' or 'charging station' line item. EV charger / EVSE installation is therefore billed as ordinary electrical work under the same Electrical Permit that governs residential and commercial electrical service upgrades, consistent with this file's existing electrical-permit entry.

Verified 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in unincorporated Utah County — falls under the county's general Electrical Permit
  • Standard Building Permit Application submitted for the electrical scope of work
  • Compliance with the 2023 NEC, adopted statewide per Utah Code § 15A-2-103(1)(g)

Required documents

  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application form (same form used for all permit types); no distinct EV-charger application form or category exists.
  • OptionalContractor LicenseValid Utah electrical contractor license (Utah DOPL) if not performed by the homeowner on owner-occupied property

Fee schedule

Fee typeAmountNotes
Residential Electrical Service Upgrade / Replacement (applies to residential EV charger/EVSE)$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Flat rate. No distinct EV-charger line item exists in this schedule (re-verified 2026-07-19 and 2026-07-20), so a residential EV charger installation is billed under this same flat-fee electrical line item, consistent with this file's existing electrical-permit entry.
New Commercial Electrical Service / Commercial Electrical Service Upgrade (applies to commercial EV charger/EVSE)$303.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Flat rate; applies to a commercial-property EV charger installation requiring new or upgraded commercial electrical service.
Adding Electrical to a Building Without Power (if applicable)$505.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Flat rate; applies if the EV charger installation requires adding electrical service to a building that had none.
Re-Inspection Fee (Normal Business Hours)$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012).

Plumbing Permit

Verified

Required for plumbing installations, alterations, and repairs in Unincorporated Utah County including water heaters, fixture additions, and gas line work. Governed by the 2024 International Plumbing Code (IPC) as adopted by Utah Code § 15A-2-103(1)(d), in force since July 1, 2026.

Verified 2026-07-16 · Source

Requirements

  • New plumbing fixture installations (sinks, toilets, showers)
  • Water heater installation or replacement (including like-for-like)
  • Water line or sewer line replacement or extension
  • Gas line installation or modification
  • Backflow prevention device installation

Required documents

  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application form with scope of work
  • OptionalHealth Department ApprovalRequired if work affects connection to private water or sewer system — complete the Health Department section of the Building Permit Application
  • OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) if not performed by the homeowner on owner-occupied property

Fee schedule

Fee typeAmountNotes
Plumbing permit — minimum permit fee$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). The schedule does not list separate plumbing fixture-by-fixture fees; the 'Minimum permit fee' of $101.00 applies. Confirm scope with the Building Division at (801) 851-8342. Re-verified live 2026-07-16: unchanged — still no fixture-by-fixture plumbing fees on the codified schedule; the $303.00 'Adding Plumbing to a Building Without Plumbing Facilities' rate also confirmed.
Adding Plumbing to a Building Without Plumbing Facilities$303.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Flat rate for adding plumbing to a building that previously had none.

Mechanical / HVAC Permit

Verified

Required for heating, ventilation, and air conditioning installations, replacements, and ductwork modifications in Unincorporated Utah County. Governed by the 2024 International Mechanical Code (IMC) as adopted by Utah Code § 15A-2-103(1)(e), in force since July 1, 2026.

Verified 2026-07-16 · Source

Requirements

  • Furnace or boiler installation or replacement (including like-for-like)
  • Air conditioning system installation or replacement
  • Ductwork installation or major modification
  • Evaporative cooler installation
  • Fireplace insert or wood-burning stove installation

Required documents

  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application form with equipment description and scope of work
  • OptionalEquipment SpecificationsManufacturer data sheets for furnace, AC, or heat pump
  • OptionalContractor LicenseValid Utah HVAC/mechanical contractor license (Utah DOPL) if not performed by the homeowner on owner-occupied property

Fee schedule

Fee typeAmountNotes
Replacement of AC Units, Furnaces, Water Heaters, Boilers, or Similar Equipment$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012), 'Permit Fee by Activity & Flat Fee.' Single flat rate covering replacement of AC units, furnaces, water heaters, boilers, or similar equipment. Re-verified live 2026-07-16: $101.00 replacement rate and $303.00 'Adding Mechanical' rate both unchanged on the codified schedule.
Adding Mechanical to a Building Without Mechanical Equipment or Service$303.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Flat rate for adding mechanical equipment/service to a building that previously had none.
Re-Inspection Fee (Normal Business Hours)$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012).

Roofing Permit

Verified

Required for roof replacement, re-roofing, and structural roof repairs in Unincorporated Utah County. Permit fees are based on the remodeling rate from the county fee schedule.

Verified 2026-07-16 · Source

Requirements

  • Complete roof replacement (tear-off and re-roof)
  • Overlay of new roofing over existing (where code allows)
  • Structural roof repairs or modifications
  • Changes to roofing material type

Required documents

  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application with scope of work, square footage, and material specifications
  • OptionalContractor LicenseValid Utah roofing contractor license (Utah DOPL) if not performed by the homeowner

Fee schedule

Fee typeAmountNotes
Roofing / Re-roofing (Remodeling category)$0.30 per square footUtah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Roofing falls under 'Remodeling' (All Occupancies) at $0.30/sq ft, which includes Plan Review Fee and State surcharge. A $101.00 minimum permit fee applies. Re-verified live 2026-07-16: Remodeling still $0.30/sq ft and minimum still $101.00 on the codified schedule.
Minimum Permit Fee$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). The minimum permit fee applies to small remodeling/roofing jobs.

Solar Panel Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems in Unincorporated Utah County. Both a building permit (structural mounting) and an electrical permit (wiring) are typically required. A Residential Solar Plan Submittal Checklist is available from the County.

Verified 2026-07-16 · Source

Requirements

  • Rooftop solar panel installation
  • Ground-mounted solar array installation
  • Battery storage system installation
  • Electrical service upgrade for solar interconnection

Required documents

  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application for both the structural/building and electrical portions
  • RequiredResidential Solar Plan Submittal ChecklistComplete the county's Solar Submittal Checklist: https://codev.utahcounty.gov/codev/forms/solar-submittal-checklist-2021.pdf — includes site plan, electrical single-line diagram, structural analysis, and equipment specs
  • OptionalInterconnection AgreementUtility approval from Rocky Mountain Power for grid-tied systems

Fee schedule

Fee typeAmountNotes
Solar & Generator Power Installations (Not Including Accessory Structures)$303.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). The current schedule lists a dedicated 'Solar & Generator Power Installations' flat rate of $303.00 (does not include accessory structures). Re-verified live 2026-07-16: $303.00 unchanged on the codified schedule.
Electrical service work for solar (if a separate electrical permit applies)$101.00 (residential electrical service upgrade/replacement)Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). If a separate residential electrical service upgrade/replacement is required for interconnection, that flat rate is $101.00. The county's Residential Solar Plan Submittal Checklist (2021) references both building and electrical permits; confirm scope with the Building Division at (801) 851-8342.

Fence Permit

Verified

Required for fence installation in Unincorporated Utah County. The county fee schedule lists a flat rate for fences.

Verified 2026-07-16 · Source

Requirements

  • New fence construction
  • Replacement of existing fence (verify with Building Division whether same-location/same-height replacement requires a permit)
  • Powered gate installations

Required documents

  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application with fence height, material, and site plan
  • OptionalSite PlanShowing fence location relative to property lines and any easements

Fee schedule

Fee typeAmountNotes
Fences over 6 feet above grade and unpowered gates (building permit)$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). A building permit is required for fences over 6 feet above grade (and unpowered gates) at a flat $101.00. Re-verified live 2026-07-16: $101.00 unchanged; the $50.00 Zone Compliance Permit line ('Fences under 8 ft. in height... and other minor structures and land uses that do not require a building permit, business license or temporary use permit') also confirmed verbatim under the FEE SCHEDULE's Community Development section.
Fences under 8 ft not requiring a building permit (Zone Compliance Permit)$50.00Utah County Code, Fee Schedule — Community Development. Fences under 8 ft in height and other minor structures that do not require a building permit, business license, or temporary use permit are handled under a Zone Compliance Permit at $50.00.

Deck Permit

Verified

Required for new deck construction or structural modification of existing decks in Unincorporated Utah County. The county fee schedule lists a flat rate for decks.

Verified 2026-07-16 · Source

Requirements

  • New deck construction (attached or freestanding)
  • Decks higher than 30 inches above grade
  • Structural modifications to existing decks
  • Adding or replacing a deck ledger

Required documents

  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application with scope of work and site plan
  • RequiredConstruction DrawingsFraming plan, footing details, ledger attachment method, and railing specifications per the Garage/Carport/Storage submittal requirements checklist
  • RequiredSite PlanShowing deck location, setbacks from property lines, and relationship to existing structure

Fee schedule

Fee typeAmountNotes
Porches, Decks, & Other Unwalled Structures$0.30 per square footUtah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Decks are charged on the per-square-foot multiplier ($0.30/sq ft) under 'Porches, Decks, & Other Unwalled Structures,' which includes Plan Review Fee and State surcharge. A $101.00 minimum permit fee applies. Re-verified live 2026-07-16: $0.30/sq ft unchanged on the codified schedule.

Demolition Permit

Verified

Required for partial or complete demolition of structures in Unincorporated Utah County, including coordination of utility disconnections and required asbestos surveys.

Verified 2026-07-16 · Source

Requirements

  • Complete demolition of any structure
  • Partial demolition involving structural elements
  • Removal of load-bearing walls
  • Demolition of structures with potential asbestos (pre-1980 construction)

Required documents

  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application with demolition scope, structure details, and disposal plan
  • RequiredUtility Disconnect ConfirmationProof that gas, electric, water, and sewer are disconnected prior to demolition — required before work begins
  • OptionalAsbestos SurveyFederal NESHAP regulations require an asbestos inspection before demolition of structures built before approximately 1980 — coordinate with Utah DEQ

Fee schedule

Fee typeAmountNotes
Demolition of a structure$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012), 'Permit Fee by Activity & Flat Fee — Demolition of a structure.' Flat rate. Re-verified live 2026-07-16: $101.00 unchanged on the codified schedule.

Water Heater Permit

Verified

Required for water heater installation, replacement, or conversion in Unincorporated Utah County. A subset of the plumbing permit, commonly pulled as a standalone for this frequent project type.

Verified 2026-07-16 · Source

Requirements

  • Water heater replacement (including like-for-like swaps)
  • New water heater installation
  • Conversion from tank to tankless
  • Gas line modification for water heater

Required documents

  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application with water heater type, size, fuel source, and location
  • OptionalContractor LicenseValid Utah plumbing contractor license (Utah DOPL) if not performed by the homeowner on owner-occupied property

Fee schedule

Fee typeAmountNotes
Water heater replacement (Replacement of AC Units, Furnaces, Water Heaters, Boilers, or Similar Equipment)$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Water heater replacement is expressly listed within the combined flat-rate line 'Replacement of AC Units, Furnaces, Water Heaters, Boilers, or Similar Equipment' at $101.00. Re-verified live 2026-07-16: unchanged on the codified schedule.

Swimming Pool Permit

Verified

Required for in-ground and above-ground swimming pool installation in Unincorporated Utah County. The county fee schedule lists a dedicated per-square-foot rate for swimming pools.

Verified 2026-07-16 · Source

Requirements

  • In-ground swimming pool construction
  • Above-ground pools with a depth over 24 inches
  • Hot tubs and spas (built-in)
  • Pool barrier / fence installation (required for all pools)

Required documents

  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application with pool dimensions, depth, equipment location, and structural details
  • RequiredSite PlanPool location with setbacks, equipment pad, and barrier / fence layout
  • RequiredElectrical PlanPool pump, lighting, bonding, and GFCI protection details (NEC Article 680)

Fee schedule

Fee typeAmountNotes
Swimming Pools and Water Tanks$0.30 per square footUtah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). 'Swimming Pools and Water Tanks' (All Occupancies) is charged on the per-square-foot multiplier at $0.30/sq ft, which includes Plan Review Fee and State surcharge. A $101.00 minimum permit fee applies. Re-verified live 2026-07-16: $0.30/sq ft unchanged on the codified schedule.

Accessory Dwelling Unit (ADU)

Verified

Required for construction of a secondary dwelling unit on a residential property in Unincorporated Utah County, including basement apartments, detached cottages, and garage conversions. ADU permitting requires both a zoning clearance (Planning & Zoning) and a building permit.

Verified 2026-07-16 · Source

Requirements

  • Property must be in a zone permitting ADUs per the Utah County Land Use Ordinance
  • Obtain Zone Clearance from Planning & Zoning before applying for building permit
  • Separate entrance from primary dwelling
  • Adequate parking (check UCLUO for requirements)
  • Compliant with Utah HB 82 (2021) — counties must allow internal ADUs; detached ADUs subject to local zoning

Required documents

  • RequiredZone Clearance ApplicationObtain zone clearance from Planning & Zoning before building permit application. Submit at https://formitable.utahcounty.gov/zone-clearance/forms/new
  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application after zone clearance is obtained
  • RequiredConstruction PlansFull construction drawings per the Single Family Submittal Requirements checklist — floor plan, elevations, sections, egress details, fire separation between units

Fee schedule

Fee typeAmountNotes
ADU building permit — R-3/R-4 Residential rate$1.00 per square footUtah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). ADU construction follows the standard R-3/R-4 Residential per-square-foot multiplier of $1.00/sq ft. Includes Plan Review Fee and State surcharge. A separate $300.00 New Buildings submittal fee may apply. Under Utah law, impact fees for internal or attached ADUs may be reduced or waived — confirm with the Building Division at (801) 851-8342. Re-verified live 2026-07-16: $1.00/sq ft R-3/R-4 rate and $300.00 New Buildings submittal fee both unchanged on the codified schedule.

Basement Finish Permit

Verified

Required for finishing or remodeling an unfinished basement in Unincorporated Utah County. The county fee schedule has a specific category for finishing an unfinished basement based on the difference between the finished and unfinished multipliers.

Verified 2026-07-16 · Source

Requirements

  • Framing walls in an unfinished basement
  • Adding a bedroom (requires egress window)
  • Adding a bathroom (requires plumbing permit)
  • Electrical wiring for new rooms
  • Any structural modifications

Required documents

  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application with floor plan and scope of work
  • RequiredFloor PlanLayout showing room sizes, egress windows, and door locations

Fee schedule

Fee typeAmountNotes
Finishing of Unfinished BasementDifference Between Multipliers — $0.70 per square foot for R-3/R-4 residential ($1.00 finished − $0.30 unfinished)Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). The schedule states 'Finishing of Unfinished Basement — Difference Between Multipliers,' i.e., the finished residential rate ($1.00/sq ft) minus the unfinished basement rate ($0.30/sq ft) = $0.70/sq ft. Includes Plan Review Fee and State surcharge; $101.00 minimum permit fee applies. Re-verified live 2026-07-16: 'Finishing of Unfinished Basement — Difference Between Multipliers' still verbatim on the codified schedule, and both component multipliers ($1.00 and $0.30) unchanged.

Grading & Excavation Permit

Verified

Required for significant grading, excavation, or land disturbance on properties in Unincorporated Utah County. The county fee schedule lists flat rates by volume.

Verified 2026-07-16 · Source

Requirements

  • Grading or filling that changes drainage patterns
  • Excavation deeper than 4 feet
  • Land disturbance over 1 acre (state UPDES stormwater permit also required)
  • Cut or fill exceeding limits set in the Utah County Land Use Ordinance
  • Hillside grading in sensitive slope areas

Required documents

  • RequiredBuilding Permit ApplicationSubmit the standard Building Permit Application with grading plan and scope of work
  • RequiredGrading PlanExisting and proposed contours, cut/fill volumes, and drainage
  • RequiredErosion Control PlanSWPPP or erosion control measures during construction

Fee schedule

Fee typeAmountNotes
Grading up to 10,000 cubic yards$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012), 'Permit Fee by Activity & Flat Fee.' Flat rate.
Grading, 10,001 Cubic Yards or More (and Retaining Walls)$303.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012). Flat rate for grading of 10,001 cubic yards or more (and retaining walls). Note: retaining walls over 4 feet are otherwise $101.00. Re-verified live 2026-07-16: both grading tiers ($101.00 up to 10,000 cu yd; $303.00 for 10,001+ and retaining walls) unchanged on the codified schedule.

Commercial Building Permit

Required for new commercial building construction within unincorporated Utah County, administered by Utah County Community Development — Building Division. The county's own Fee Schedule (Exhibit A, 'Permit Fee by Building Type & Size,' effective 4/3/2012, last updated 3/13/2019) is structured as a per-square-foot table by building occupancy/type — this file's residential entry independently confirms the R-3/R-4 ($1.00/sq ft) and R-1/R-2 ($1.50/sq ft) rows, but the commercial/non-residential occupancy rows of that same table could not be extracted after repeated genuine attempts: the codified schedule is hosted as a JavaScript single-page application at utahcounty.municipalcodeonline.com with no server-rendered fee text reachable by direct fetch, and the county's separate 'Current Fee Schedule and Ordinance' PDF only states 'Building Permits... See Exhibit A' without reproducing the table. Marked partial rather than fabricating a commercial per-square-foot rate.

Reviewed 2026-07-19 · Source

Requirements

  • New commercial building construction within unincorporated Utah County
  • Utah County Building Permit Application, including Description of Work and Value of Work fields
  • Health Department review/approval if the project involves plumbing fixtures connecting to sewer/potable water, or is within 5 feet of an existing septic tank or drain field, per the county's own Building Permit Application health-screening questions
  • Wastewater Approval and Potable Water Quality Approval, or confirmation of connection to a public system
  • Building Permit Fee based on Exhibit A's per-square-foot table — the specific commercial occupancy rate could not be independently confirmed (see confidence note)

Required documents

  • RequiredUtah County Building Permit Application (PDF)Official form; requires owner/contractor information, property parcel, value of work, and a description of the proposed work.
  • OptionalHealth Department Approval FormRequired only if the Building Permit Application's health-screening questions (sewer/water connection, proximity to septic, private water system impact) are answered yes.

Fee schedule

Fee typeAmountNotes
Building Permit Submittal Fee — New Buildings$300.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012), 'Building Permit Submittal Fees — New Buildings.' This line applies to new buildings generally, not itemized separately for residential vs. commercial, so it is reused here.
Minimum Permit Fee$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012), 'Permit Fee by Activity & Flat Fee — Minimum permit fee.' A general floor, not itemized separately for commercial.
Building Permit Fee — commercial/non-residential occupancyNot independently confirmedExhibit A is structured as a per-square-foot table by building type/occupancy (the file's residential entry confirms R-3/R-4 at $1.00/sq ft and R-1/R-2 at $1.50/sq ft from the same table), but the commercial/non-residential occupancy rows could not be reached: the county's 2021 'Current Fee Schedule and Ordinance' PDF (utahcounty.gov/apps/WebLink/Dept/COMMISH/UtahCountyFeeScheduleUpdate10062021.pdf) only states 'Building Permits... See Exhibit A' without reproducing it, and the referenced codified Exhibit A at utahcounty.municipalcodeonline.com is served as a JavaScript single-page application that returned no server-rendered fee content to direct fetch. Omitted rather than fabricated — contact Community Development at (801) 851-8342 for the current commercial rate.

Commercial Tenant Improvement / Tenant Finish Permit

Required for commercial tenant improvement / interior remodel work within unincorporated Utah County. As with the commercial-building-permit entry in this file, Utah County's codified Exhibit A fee table could not be independently reached for a tenant-improvement-specific or commercial per-square-foot rate despite genuine repeated attempts, and no separate tenant-improvement fee line was found anywhere on the county's own published pages. Marked partial rather than fabricating a figure.

Reviewed 2026-07-19 · Source

Requirements

  • Interior remodel or tenant finish work within existing commercial space in unincorporated Utah County
  • Utah County Building Permit Application, including Description of Work and Value of Work fields
  • Health Department review/approval if the project involves plumbing fixtures connecting to sewer/potable water, per the county's own Building Permit Application health-screening questions
  • Minimum Permit Fee likely applies as a floor (see confidence note on the exact valuation-based rate)

Required documents

  • RequiredUtah County Building Permit Application (PDF)Official form; requires a description of the proposed work and value of work.
  • OptionalHealth Department Approval FormRequired only if the Building Permit Application's health-screening questions are answered yes.

Fee schedule

Fee typeAmountNotes
Minimum Permit Fee$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012), 'Permit Fee by Activity & Flat Fee — Minimum permit fee.' This is a general floor applicable to any permit type, not itemized separately for tenant improvements, but not tied specifically to 'New Buildings' either, so it is the one fee figure carried over here with reasonable confidence.
Building Permit Fee — commercial tenant improvementNot independently confirmedNo tenant-improvement-specific or commercial per-square-foot line was found in Utah County's Exhibit A after the same repeated research attempts documented in the commercial-building-permit entry for this jurisdiction (JavaScript-hosted codified ordinance site returned no server-rendered fee content; the county's general Fee Schedule PDF only points to 'Exhibit A' without reproducing it). Note also that the $300.00 'New Buildings' submittal fee confirmed for new construction is explicitly scoped to new buildings and is NOT assumed to apply to a tenant improvement, which is not a new building. Omitted rather than fabricated — contact Community Development at (801) 851-8342 for the current rate.

Sign Permit

Verified

Required for signs in unincorporated Utah County. Small signs are handled through a Zone Compliance Permit; larger signs and billboards are handled through the standard building-permit flat-fee schedule. Utah County's own Current Fee Schedule and Ordinance (Commission Approval 12/21/1999, Effective 1/1/2000, Last Update October 6, 2021) publishes two distinct dollar figures: a $50.00 Zone Compliance Permit for signs under 32 square feet that do not otherwise require a building permit, and a $303.00 flat fee for 'Billboards & Signs (Not Including Power Connection).'

Verified 2026-07-20 · Source

Requirements

  • Signs under 32 square feet that do not otherwise require a building permit, business license, or temporary use permit: processed as a Zone Compliance Permit
  • Larger signs and billboards not including power connection: processed as a standard building-permit activity at the flat 'Billboards & Signs' fee tier
  • Signs requiring a power connection are assessed as commercial/utility electrical work in addition to the sign structure fee (see this jurisdiction's electrical-permit entry)
  • Compliance with the applicable Utah County zoning/land use ordinance provisions for sign placement, per the Community Development Department

Required documents

  • RequiredZone Compliance Permit Application or Building Permit ApplicationSmall signs (under 32 sq ft) that don't otherwise require a building permit use the Zone Compliance Permit application; larger signs and billboards use the standard building permit application. Submitted to Utah County Community Development.

Fee schedule

Fee typeAmountNotes
Zone Compliance Permit — Signs under 32 sq. ft. (not otherwise requiring a building permit, business license, or temporary use permit)$50.00Utah County Government Current Fee Schedule and Ordinance (Commission Approval 12/21/1999, Effective 1/1/2000, Last Update October 6, 2021) — 'Zone Compliance Permit (Fences under 8 ft. in height, Signs under 32 sq. ft, landscape structure, Structure exempt by the adopted building code, and other minor structures and land uses that do not require a building permit, business license or temporary use permit) $50.00.'
Billboards & Signs (Not Including Power Connection)$303.00Utah County Government Current Fee Schedule and Ordinance, Building Permit flat-fee 'Activity, Use, or Structure' table — 'Billboards & Signs (Not Including Power Connection) $303.00,' grouped with other $303.00-tier flat-fee activities (e.g. Commercial/Utility Equipment & New Commercial Electrical Services, Renewal of Building Permit).

Fire Sprinkler Permit

Verified

Required for installation of an automatic fire sprinkler system in unincorporated Utah County, issued by the Utah County Fire Marshal's Office (a separate office from the Community Development Building Division, though in the same building) under International Fire Code (IFC) § 105.7.1. The Fire Marshal's own published Permit Fee Schedule lists a distinct dollar fee for this permit, separate from the general building permit.

Verified 2026-07-20 · Source

Requirements

  • Installation of a new automatic fire sprinkler system, per IFC § 105.7.1
  • Plans reviewed by the Utah County Fire Marshal's Office; a rough-in inspection and a final inspection are included in the base permit fee
  • Applies in addition to, not instead of, any building permit required from the Community Development Building Division for the same project

Required documents

  • RequiredFire Sprinkler Permit Application / Plan SubmittalSubmitted to the Utah County Fire Marshal's Office (51 South University Avenue, Suite 120, Provo) — a separate submittal from the Building Division's building permit application.

Fee schedule

Fee typeAmountNotes
Automatic Fire Sprinkler — up to 10,000 sq ft (residential)$230.00Utah County Fire Marshal Permit Fee Schedule, item 2.a: 'Overview of plans, rough-in and final site inspections up to 10,000 square feet.' Plus a Zone travel fee where applicable ($15-$65 depending on distance from the Fire Marshal's office).
Automatic Fire Sprinkler — Commercial$330.00Utah County Fire Marshal Permit Fee Schedule, item 2.b. Plus applicable Zone travel fee.
Automatic Fire Sprinkler — over 10,000 sq ft (per sq ft, in addition to base fee)$0.025 per sq ftUtah County Fire Marshal Permit Fee Schedule, item 2.c.
Zone Fee (travel time/distance, added to most Fire Marshal permits)$15.00 (10 mi or less) / $30.00 (over 10 mi) / $45.00 (over 20 mi) / $65.00 (over 30 mi), one way from the Fire Marshal's officeUtah County Fire Marshal Permit Fee Schedule, Zone Fee table (Zones 1-4).
Re-inspection after non-compliance of initial inspection$70.00Utah County Fire Marshal Permit Fee Schedule, Miscellaneous Permits and Fees, item 2. Plus applicable Zone Fee.

Fire Alarm System Permit

Verified

Required for installation of a fire alarm system in unincorporated Utah County, issued by the Utah County Fire Marshal's Office under International Fire Code (IFC) § 907.1. Published as a distinct line item and dollar fee on the Fire Marshal's own Permit Fee Schedule, separate from the general Community Development building permit and from the Fire Sprinkler Permit.

Verified 2026-07-20 · Source

Requirements

  • Installation of a new fire alarm system, per IFC § 907.1
  • Plan review, one rough-in visual site inspection, and one final test, per the Fire Marshal's fee schedule
  • Applies in addition to, not instead of, any building permit required from the Community Development Building Division for the same project

Required documents

  • RequiredFire Alarm System Permit Application / Plan SubmittalSubmitted to the Utah County Fire Marshal's Office (51 South University Avenue, Suite 120, Provo).

Fee schedule

Fee typeAmountNotes
Fire Alarm System$150.00Utah County Fire Marshal Permit Fee Schedule, item 9: 'Overview of plan(s), one rough-in visual site inspection and one final test.' Plus applicable Zone travel fee ($15-$65).
Zone Fee (travel time/distance, added to most Fire Marshal permits)$15.00 (10 mi or less) / $30.00 (over 10 mi) / $45.00 (over 20 mi) / $65.00 (over 30 mi), one way from the Fire Marshal's officeUtah County Fire Marshal Permit Fee Schedule, Zone Fee table (Zones 1-4).
Re-inspection after non-compliance of initial inspection$70.00Utah County Fire Marshal Permit Fee Schedule, Miscellaneous Permits and Fees, item 2. Plus applicable Zone Fee.

Change of Use / Certificate of Occupancy Permit

Verified

Required when a building or portion of a building in unincorporated Utah County changes from one use or occupancy classification to another. The county's Community Development Building page lists 'changing the use of a building' alongside new construction as a permit-triggering activity, requiring a standard Building Permit Application. Utah County's own codified Fee Schedule (Building Permits, Exhibit A, effective 4/3/2012, last updated 3/13/2019) publishes a dedicated 'Change in Use or Occupancy' line item in its 'Permit Fee by Building Type & Size' table, billed at the same $0.30 per square foot 'All Occupancies' multiplier tier as Remodeling, Shell Only Buildings (prior to tenant build-out), and Porches/Decks — confirmed live 2026-07-22 by rendering the codified ordinance site (utahcounty.municipalcodeonline.com), which serves the full Exhibit A table (this schedule is a JavaScript single-page application not reachable by direct non-browser fetch, which is why the commercial-building-permit and commercial-tenant-improvement-permit entries elsewhere in this file could not independently confirm their own commercial per-square-foot rows — the 'Change in Use or Occupancy' row was successfully located and confirmed on this same live-rendered table). A new or amended Certificate of Occupancy is issued upon passing final inspection, consistent with the Certificate of Occupancy language used throughout this file's other Building Division entries.

Verified 2026-07-22 · Source

Requirements

  • Any change in the use or occupancy classification of an existing building or portion of a building in unincorporated Utah County
  • Utah County Building Permit Application, including Description of Work and the existing and proposed use
  • Health Department review/approval if the proposed use involves plumbing fixtures connecting to sewer/potable water, or is within 5 feet of an existing septic system, per the county's own Building Permit Application health-screening questions
  • Compliance with the occupancy-classification provisions of the adopted 2024 IBC and 2024 IEBC (Utah Code § 15A-2-103) before a new or amended Certificate of Occupancy is issued

Required documents

  • RequiredUtah County Building Permit Application (PDF)Official form; requires a description of the proposed work, and the existing and proposed use. Available at https://codev.utahcounty.gov/codev/forms/building-permit-application-2026.pdf
  • OptionalHealth Department Approval FormRequired only if the Building Permit Application's health-screening questions (sewer/water connection, proximity to septic, private water system impact) are answered yes.

Fee schedule

Fee typeAmountNotes
Change in Use or Occupancy$0.30 per square footUtah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012), 'Permit Fee by Building Type & Size' table, 'All Occupancies — Change in Use or Occupancy' row. Same $0.30/sq ft multiplier tier as Remodeling, Shell Only Buildings (prior to tenant build-out), and Porches/Decks. Includes Plan Review Fee and State of Utah surcharge; does not include bonds. Confirmed live 2026-07-22 on the codified ordinance site (utahcounty.municipalcodeonline.com).
Minimum Permit Fee$101.00Utah County Code, Fee Schedule — Building Permits, Exhibit A (effective 4/3/2012), 'Permit Fee by Activity & Flat Fee — Minimum permit fee.' General floor applicable to any permit type, including a change of use, if the per-square-foot calculation falls below it.

Sources & verification

Verified against official sources. Last reviewed 2026-07-16.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Utah County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-06-30)View current record →All versions →