Version history — Unincorporated Wasatch County, Utah
This is PermitBase’s own verified record for Unincorporated Wasatch County, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Unincorporated Wasatch County’s actual law was at that time.
Permanent link to today’s record
/utah/wasatch-county/unincorporated-wasatch/as-of/2026-08-25/
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-25Current record
- 2026-07-22Superseded
- 2026-07-20Superseded
- Unincorporated Wasatch County, Utah — EV Charger / EVSE Permit record added
- Unincorporated Wasatch County, Utah — Solar PV Permit fee record added: Building Permit Fee — Building Department (general, all mounting types) (approximately $1.25 per square foot (all finished, unfinished, garage, porch, and deck square footage))
- Unincorporated Wasatch County, Utah — Solar PV Permit fee record added: County Impact Fee ($3,085.00 for new single-family residences)
- Unincorporated Wasatch County, Utah — Solar PV Permit fee record added: Conditional Use Permit Fee ('structured'/non-flush roof panels, or any freestanding installation requiring CUP review) ($700.00 + costs (costs include $0.50 per notice letter, any Engineering Review expenses, or legal noticing))
- Unincorporated Wasatch County, Utah — Sign Permit record added
- 2026-07-19Superseded
- Unincorporated Wasatch County, Utah — Solar PV Permit record added
- Unincorporated Wasatch County, Utah — Commercial Building Permit fee record removed: Plan Review Fee
- 2026-07-16Superseded
- 2026-07-04Initial record — coverage of Unincorporated Wasatch County began