Skip to main content
PermitBase

Version history — Unincorporated Wasatch County, Utah

This is PermitBase’s own verified record for Unincorporated Wasatch County, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Unincorporated Wasatch County’s actual law was at that time.

Permanent link to today’s record

/utah/wasatch-county/unincorporated-wasatch/as-of/2026-08-25/

Look up a specific date

Pick a date and we’ll show you the record as it stood then.

All versions

  • 2026-08-25Current record
  • 2026-07-22Superseded
  • 2026-07-20Superseded
    • Unincorporated Wasatch County, Utah — EV Charger / EVSE Permit record added
    • Unincorporated Wasatch County, Utah — Solar PV Permit fee record added: Building Permit Fee — Building Department (general, all mounting types) (approximately $1.25 per square foot (all finished, unfinished, garage, porch, and deck square footage))
    • Unincorporated Wasatch County, Utah — Solar PV Permit fee record added: County Impact Fee ($3,085.00 for new single-family residences)
    • Unincorporated Wasatch County, Utah — Solar PV Permit fee record added: Conditional Use Permit Fee ('structured'/non-flush roof panels, or any freestanding installation requiring CUP review) ($700.00 + costs (costs include $0.50 per notice letter, any Engineering Review expenses, or legal noticing))
    • Unincorporated Wasatch County, Utah — Sign Permit record added
  • 2026-07-19Superseded
    • Unincorporated Wasatch County, Utah — Solar PV Permit record added
    • Unincorporated Wasatch County, Utah — Commercial Building Permit fee record removed: Plan Review Fee
  • 2026-07-16Superseded
  • 2026-07-04Initial record — coverage of Unincorporated Wasatch County began