Version history — Hurricane, Utah
This is PermitBase’s own verified record for Hurricane, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Hurricane’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-26Current record
- 2026-08-25Superseded
- 2026-08-02Superseded
- Hurricane, Utah — Commercial Tenant Improvement / Tenant Finish Permit fee record added: Building Permit Fee — valuation-based (2021 IRC Table AL101.1), fee-table mechanism confirmed; valuation method for TI work unconfirmed (Same tiered schedule as the Commercial Building Permit (Resolution 2025-39, Exhibit A), applied to a project valuation whose exact TI computation method is unconfirmed)
- Hurricane, Utah — Commercial Tenant Improvement / Tenant Finish Permit fee record removed: Building Permit Fee — valuation-based (2021 IRC Table AL101.1), inferred mechanism
- 2026-07-22Superseded
- Hurricane, Utah — Sign Permit fee record added: Mailing Fee ($1.50 per address)
- Hurricane, Utah — Sign Permit fee record updated: $150.00 → $50.00
- Hurricane, Utah — Sign Permit fee record updated: $1.50 per address → $150.00
- Hurricane, Utah — Grading Permit fee record updated: $150.00 → $300.00
- 2026-07-20Superseded
- Hurricane, Utah — Fire Sprinkler System Permit record added
- Hurricane, Utah — Fire Alarm System Permit record added
- Hurricane, Utah — EV Charger / EVSE Permit record added
- 2026-07-19Superseded
- 2026-07-16Superseded
- 2026-07-08Initial record — coverage of Hurricane began