You are viewing the permanent link for the record currently in effect, published 2026-07-16.

Unincorporated Wayne County building permits

Unincorporated Wayne County, Utah — as published 2026-07-16.

Reviewed 2026-07-08 · Source

Codes adopted

2024 International Building Code (IBC), including Appendices C and J — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(a); supersedes the 2021 edition previously listed here2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); REMAINS CURRENT, UNCHANGED by the 7/1/2026 amendmentAppendix AQ of the 2021 IRC — statewide per Utah Code § 15A-2-103(1)(c); not itemized on any Wayne County page found, added here per statute2024 International Plumbing Code (IPC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(d); supersedes the 2021 edition previously listed here2024 International Mechanical Code (IMC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(e); supersedes the 2021 edition previously listed here2024 International Fuel Gas Code (IFGC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(f); supersedes the 2021 edition previously listed here2024 International Energy Conservation Code (IECC), single unsplit statewide edition — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(h); supersedes the 2021 edition previously listed here2024 International Existing Building Code (IEBC) — CURRENT statewide as of 7/1/2026 per Utah Code § 15A-2-103(1)(i); supersedes the 2021 edition previously listed hereResidential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — statewide per Utah Code § 15A-2-103(1)(n); not itemized on any Wayne County page found, added here per statute since this file had previously omitted it entirely2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force, UNCHANGED by the 7/1/2026 amendmentMBI 1200 and MBI 1205 (manufactured/modular construction standards) — statewide per Utah Code § 15A-2-103(1)(o); not itemized on any Wayne County page found, added here per statute since this file had previously omitted it entirelyNOTE (2026-07-16 re-verification): The Utah Code § 15A-2-103 version effective 7/1/2026 (superseded 1/1/2027) took effect 15 days before this re-verification. This entry previously described the 2024-cycle codes in future tense ('effective through June 30, 2026' / codes 'effective July 1, 2026'); that date has now passed, so IBC/IPC/IMC/IFGC/IECC/IEBC/residential ISPSC are now stated as CURRENT (2024 editions), while IRC (2021) and NEC (2023) remain unchanged. These are statewide mandatory minimum codes adopted by reference; Wayne County has not published any local code amendments or its own code-edition page beyond referencing the statewide codes generally, so there is no city-page lag to record.

Permit types & fees

Residential Building Permit

Required for new construction, additions, alterations, repairs, demolition, and moving of structures in unincorporated Wayne County. The Wayne County Building Department, via its single county-wide Building Inspector, issues and reviews all building permits under the standard 'Application for Building Permit and/or Certificate of Occupancy — Building Department - Wayne County' form. The same form and inspector serve incorporated towns within the county (confirmed via Loa Town's own building-permits page, which lists the identical inspector and directs residents to the county process) as well as unincorporated areas.

Reviewed 2026-07-19 · Source

Requirements

  • New single-family dwelling construction, addition, alteration, repair, demolition, or moving of a structure (form covers all six categories: New, Alteration, Addition, Demolish, Repair, Move)
  • Proof of ownership of property
  • Waste water system permit (septic) must accompany the application per the county's own application instructions
  • Plot plan showing lot dimensions, existing streets, building dimensions, and distances from the structure to all four property lines

Required documents

  • RequiredApplication for Building Permit and/or Certificate of OccupancyOfficial Wayne County Building Department form. Requires permittee, architect/engineer, building contractor, electrician, plumber, and heating contractor information (names, addresses, state license numbers); project type checkboxes (New/Alteration/Addition/Demolish/Repair/Move); occupancy group; square footage by floor; lot size; flood-hazard-zone status; estimated cost of construction; and an on-form plot plan diagram.
  • RequiredProof of OwnershipRequired to accompany the building permit application per the form's note
  • RequiredWaste Water System PermitSeptic/waste water system permit must accompany the building permit application (per form instructions); coordinate with the Central Utah Public Health Department, Waste Water Feasibility per Utah Admin Code R317-4-4
  • RequiredPlot PlanLot dimensions, existing streets, dimensions of new building, location of building on the property, and distance from the building to all four property lines; a special plot plan may be required for more complex sites

Fee schedule

Fee typeAmountNotes

Commercial Building Permit

Required for new commercial building construction in unincorporated Wayne County. Wayne County runs a single county-wide Building Department with one Building Inspector (Eric Torgerson) who reviews all project types — including commercial — using the same 'Application for Building Permit and/or Certificate of Occupancy' form, which includes an 'Occupancy Group' field and project-type checkboxes (New/Alteration/Addition/Demolish/Repair/Move). No separate commercial application, fee schedule, or plan-review process is published; the same inspector and form serve incorporated towns within the county (Loa, Bicknell, Torrey, Hanksville) as well as unincorporated land.

Reviewed 2026-07-19 · Source

Requirements

  • New commercial construction, using the county's Application for Building Permit and/or Certificate of Occupancy form (Occupancy Group field; New/Alteration/Addition/Demolish/Repair/Move checkboxes)
  • Proof of ownership of property
  • Utah law requires commercial building plans to be designed, drawn, and stamped by a Utah Licensed Architect or Engineer (Utah Code §§ 58-22-305 and 58-3a-304 — the exemption from stamped plans applies only to one- and two-family dwellings, not commercial structures)
  • Waste water system permit (septic) must accompany the application where applicable, per the county's application instructions (coordinate with the Central Utah Public Health Department, Waste Water Feasibility per Utah Admin Code R317-4-4)
  • Plot plan showing lot dimensions, existing streets, building dimensions, and distances from the structure to all four property lines

Required documents

  • RequiredApplication for Building Permit and/or Certificate of OccupancyOfficial Wayne County Building Department form. Requires permittee, architect/engineer, building contractor, electrician, plumber, and heating contractor information; project type checkboxes; Occupancy Group field; square footage by floor; estimated cost of construction.
  • RequiredProof of OwnershipRequired to accompany the building permit application per the form's note.
  • RequiredStamped Plans (Utah Licensed Architect or Engineer)Required for all commercial construction under statewide Utah law; the county's own form does not separately itemize this but it is a statutory requirement regardless.
  • RequiredPlot PlanLot dimensions, existing streets, dimensions of new building, location of building on the property, and distance from the building to all four property lines.

Fee schedule

Fee typeAmountNotes

Commercial Tenant Improvement / Tenant Finish Permit

Required for tenant improvement / tenant finish work inside an existing commercial building in unincorporated Wayne County. The county's single Building Department and Building Inspector process TI/remodel work under the same 'Application for Building Permit and/or Certificate of Occupancy' form used for new construction — the form's 'Alteration' project-type checkbox covers this scope — with no separate tenant-improvement fee tier or application published.

Reviewed 2026-07-19 · Source

Requirements

  • Tenant improvement, tenant finish, or alteration work inside an existing commercial building, using the county's Application for Building Permit and/or Certificate of Occupancy form ('Alteration' checkbox)
  • Proof of ownership of property, or written tenant authorization from the property owner
  • Utah law requires commercial building plans to be designed, drawn, and stamped by a Utah Licensed Architect or Engineer (Utah Code §§ 58-22-305 and 58-3a-304 — the exemption from stamped plans applies only to one- and two-family dwellings, not commercial structures)

Required documents

  • RequiredApplication for Building Permit and/or Certificate of OccupancyOfficial Wayne County Building Department form; 'Alteration' project-type checkbox covers tenant-improvement scope.
  • RequiredProof of Ownership or Tenant AuthorizationRequired to accompany the building permit application per the form's note.
  • OptionalStamped Plans (Utah Licensed Architect or Engineer, where scope requires)Required for structural, electrical, mechanical, or plumbing tenant-improvement scope in a commercial building under statewide Utah law.

Fee schedule

Fee typeAmountNotes

Sign Permit

Required for erecting, moving, reconstructing, enlarging, or structurally altering a sign in unincorporated Wayne County, governed by a dedicated Chapter 19, SIGN STANDARDS, of the Wayne County Zoning Ordinance (A Land Use Ordinance, Effective January 1, 2011). A sign requires BOTH a Land Use Application (Permitted P-1 Sign, Permitted P-2 Sign, or Conditional Sign Application, depending on the nature of the associated use) AND a valid Building Permit issued by the Building Official (Section 1902(3), Section 1903). No sign-specific dollar fee is published in the ordinance itself — Land Use Application fees are set separately by BOCC Resolution per Chapter 14 of the county's Administrative Manual, which does not embed a fee table in the ordinance text.

Reviewed 2026-07-20 · Source

Requirements

  • No sign shall be erected, moved, reconstructed, enlarged, or structurally altered except in compliance with Chapter 19 (Section 1902(1))
  • A valid Land Use Application (Permitted P-1 Sign, Permitted P-2 Sign, or Conditional Sign Application, depending on the nature of the associated use) must be approved by the applicable Land Use Authority before a sign may be erected (Section 1902(3), Section 1908, Section 1909)
  • A valid Building Permit must also be issued by the Building Official before a sign may be erected, moved, reconstructed, enlarged, or structurally altered, unless allowed as a Limited Sign (Section 1903(1)-(2))
  • No part of any sign may be within 3 feet of any road/street right-of-way or utility easement, and must maintain required clearances from power lines (Section 1902(4))
  • No sign may interfere with fire protection appliances or obstruct a fire lane (Section 1902(5))
  • No sign may be located in a clear-view area or create a traffic hazard (Section 1902(6))
  • Electrical sign components must be installed by a licensed and bonded electrical contractor or sign contractor (Section 1904(2))
  • The type of sign allowed is governed by Table 19-1, Allowed Signs, by zoning district; certain signs are exempt per Table 19-5, Exempt Signs
  • A valid business license is required for all businesses advertised on a sign within the county (Section 1906)

Required documents

  • RequiredPermitted P-1 Sign, Permitted P-2 Sign, or Conditional Sign ApplicationThe Land Use Application type required depends on the nature of the use the sign is associated with — Permitted P-1 Sign Applications are decided by the Zoning Administrator, Permitted P-2 Sign Applications by the Planning Commission, and Conditional Sign Applications by the BOCC (Section 1909).
  • RequiredBuilding Permit ApplicationA separate Building Permit, issued by the Building Official, is also required for the sign unless it qualifies as a Limited Sign (Section 1903).

Fee schedule

Fee typeAmountNotes

EV Charger / EVSE Permit

Wayne County does not publish a distinct EV charger / EVSE permit type, fee, or checklist anywhere on its site (checked 2026-07-19, re-checked 2026-07-20). EV charger (EVSE) installation is treated as standard electrical work under the county's single, unified 'Application for Building Permit and/or Certificate of Occupancy' form — the same form and single county-wide Building Inspector (Eric Torgerson) used for all other permit types in this file. The form's only electrical-related categories are the 'Electrician' trade-contractor line and the 'Rough Electrical'/'Electrical Final' inspection items; no separate electrical or EV-specific permit category exists. As with every other permit type in this file, Wayne County has not published a dollar fee schedule — the Building Permit Application form's Rate/Permit Fee/Plan Review Fee fields are left blank and completed by county staff at intake.

Reviewed 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in unincorporated Wayne County — submitted through the same unified Building Permit Application used for all construction and repair work
  • Proof of ownership of property
  • Compliance with the 2023 NEC, which governs statewide per Utah Code § 15A-2-103(1)(g)

Required documents

  • RequiredApplication for Building Permit and/or Certificate of OccupancyOfficial Wayne County Building Department form — the same single application used for all permit types, including electrical work; no distinct EV-charger checkbox or category exists on the form.
  • RequiredProof of OwnershipRequired to accompany the building permit application per the form's note.

Fee schedule

Fee typeAmountNotes

Solar PV / Solar Panel Installation Permit

Wayne County does not publish a distinct solar / solar-PV installation permit type, fee, or checklist anywhere on its site (re-verified 2026-07-21: county-offices page, full Official Documents & Links listing, Administrative Manual, and FY2026 budget all checked directly, plus a full Wayback Machine CDX sweep of the county domain filtered for 'solar' — zero results). Solar PV installation is treated as standard construction/electrical work under the county's single, unified 'Application for Building Permit and/or Certificate of Occupancy' form — the same form and single county-wide Building Inspector (Eric Torgerson) used for all other permit types in this file. The form's trade-contractor lines are Permittee, Architect/Engineer, Building Contractor, Electrician, Plumber, and Heating — there is no solar or photovoltaic-specific line item or checkbox. As with every other permit type in this file, Wayne County has not published a dollar fee schedule — the Building Permit Application form's Rate/Permit Fee/Plan Review Fee fields are left blank and completed by county staff at intake.

Reviewed 2026-07-21 · Source

Requirements

  • Installation of a rooftop or ground-mount solar photovoltaic (PV) system at a residential or commercial property in unincorporated Wayne County — submitted through the same unified Building Permit Application used for all construction and repair work (via the 'Alteration' or 'Addition' project-type checkbox)
  • Proof of ownership of property
  • Compliance with the 2024 IBC/IRC structural provisions and the 2023 NEC (National Electrical Code Article 690, Solar Photovoltaic Systems), which govern statewide per Utah Code § 15A-2-103(1)(a)-(b) and (1)(g)
  • Electrical work must be performed by, or under the supervision of, a licensed electrical contractor listed on the Building Permit Application's 'Electrician' trade line

Required documents

  • RequiredApplication for Building Permit and/or Certificate of OccupancyOfficial Wayne County Building Department form — the same single application used for all permit types, including solar/electrical work; no distinct solar-PV checkbox or category exists on the form. Use the 'Alteration' or 'Addition' project-type checkbox as applicable and complete the 'Electrician' trade-contractor block.
  • RequiredProof of OwnershipRequired to accompany the building permit application per the form's note.

Fee schedule

Fee typeAmountNotes

Fire Sprinkler & Fire Alarm Permit

Wayne County does not publish a distinct fire sprinkler or fire alarm system permit application, fee, or checklist anywhere on its site, and neither does the local fire authority (checked 2026-07-22). Under Utah Code Title 15A, Chapter 5 (State Fire Code), the 'Authority Having Jurisdiction' for fire code matters is the State Fire Marshal (or a deputy) OR the 'local fire enforcement authority.' The Utah State Fire Marshal's Office's own published scope (firemarshal.utah.gov/services/about) covers state-owned buildings, public and private K-12 schools, hospitals, jails/prisons, and universities -- not ordinary private commercial construction -- so SFM review does not automatically apply here. For unincorporated Wayne County, the applicable local fire authority is 'Special Service District #3 Fire District' (branded publicly as the Wayne County Fire District), a Special Service District formed 2018-2023 by consolidation of the Loa, Lyman, Bicknell, Teasdale, Torrey, and Hanksville town fire departments, covering all of Wayne County including unincorporated land. The county's own official Emergency Services page lists a 'Fire Inspections & Code Questions' contact for the district -- Eric Torgerson, the SAME individual who serves as the County's single Building Inspector for every other permit type in this file -- but publishes only a seasonal Burn Permit process; no sprinkler/alarm plan-review submittal process, fee, or checklist is published there or on the Fire District's own site (waynecountyfire.org), which lists only 'Burn Permits' and 'Wood Chipping' under Services.

Reviewed 2026-07-22 · Source

Requirements

  • Installation, alteration, or addition of an automatic fire sprinkler system or a fire alarm/detection system in unincorporated Wayne County must comply with the International Fire Code as adopted statewide under Utah Code Title 15A, Chapter 5 (State Fire Code)
  • The applicable local fire enforcement authority (Authority Having Jurisdiction) for unincorporated Wayne County is Special Service District #3 Fire District (Wayne County Fire District) rather than the Utah State Fire Marshal's Office, because the project scope described in this permit type (ordinary private commercial or residential fire protection systems) falls outside SFM's own published jurisdiction (state-owned buildings, K-12 schools, hospitals, jails/prisons, universities)
  • No separate sprinkler/alarm permit application exists; applicants should expect the work to be captured under the county's single 'Application for Building Permit and/or Certificate of Occupancy' form (see this file's commercial-building-permit and residential-building-permit entries), with direct coordination with Fire Inspections contact Eric Torgerson, (435) 979-1279, since no published intake process exists for the fire district itself
  • Proof of ownership of property

Required documents

  • RequiredApplication for Building Permit and/or Certificate of OccupancyOfficial Wayne County Building Department form used for all permit types in this file; it contains no dedicated fire sprinkler or fire alarm line item, trade line, or checkbox.
  • RequiredProof of OwnershipRequired to accompany the building permit application per the form's note.

Fee schedule

Fee typeAmountNotes

Change of Use Permit / Certificate of Occupancy

Unincorporated Wayne County does not publish a standalone 'change of use' application separate from its general Land Use Application / Permitted Use Application process, and does not publish a standalone Certificate of Occupancy (CO) application separate from the county's unified 'Application for Building Permit and/or Certificate of Occupancy' form (see this file's residential-building-permit and commercial-building-permit entries). Two distinct ordinance provisions govern this permit type: (1) Section 1632/1003 of the Wayne County Zoning/Subdivision Ordinance ('Certificate of Occupancy Required') makes it unlawful to occupy or use any building or structure requiring a building permit until the Building Official has issued a CO; and (2) Section 204 of the county's Administrative Manual ('Land Use Permit Required') states that 'no use, activity, or construction shall be established or commenced' without the necessary Land Use approvals -- meaning establishing a new or different use in an existing building (a change of use) requires a Permitted P-1 Use, Permitted P-2 Use, or Conditional Use Application (decided respectively by the Zoning Administrator, Planning Commission, or BOCC, per the same Land Use Authority structure already documented in this file's sign-permit entry) before the new use may lawfully begin, in addition to any CO required for the underlying building.

Reviewed 2026-07-22 · Source

Requirements

  • A Certificate of Occupancy must be obtained from the Building Official before any building or structure requiring a building permit may be occupied or used (Zoning Ordinance Section 1632 / Subdivision Ordinance Section 1003); failure to obtain one is a violation and the county may cite and abate an occupied-without-CO structure as a public nuisance
  • Establishing a new or different use in an existing building or on a property (a 'change of use') requires an approved Land Use Application -- a Permitted P-1 Use, Permitted P-2 Use, or Conditional Use Application depending on how the new use is classified in Appendix A, Table of Uses, for the applicable Zoning District -- before the use may lawfully be established (Administrative Manual Section 204; Zoning Ordinance Section 1107(7) for a nonconforming use changing to an allowed use)
  • The new use must be an allowed use (Permitted or Conditional) for the Zoning District under Appendix A, Table of Uses; a use not listed in the Table of Uses is a Prohibited Use countywide
  • A valid Wayne County business license is required for the new use if the use category requires one, per Section 1633 (Business License Required -- Continuing Obligations)
  • Proof of ownership of property, or written tenant/owner authorization

Required documents

  • RequiredApplication for Building Permit and/or Certificate of OccupancyThe same unified county form used for all other permit types in this file; a Certificate of Occupancy is requested/issued through this application rather than a separate CO-only form.
  • RequiredPermitted P-1 Use, Permitted P-2 Use, or Conditional Use ApplicationRequired Land Use Application when the proposed use of the building or property is changing; which application/Land Use Authority applies (Zoning Administrator, Planning Commission, or BOCC) depends on the classification of the new use in Appendix A, Table of Uses, mirroring the P-1/P-2/Conditional structure documented in this file's sign-permit entry.
  • RequiredProof of Ownership or AuthorizationRequired to accompany the application per the Building Permit Application form's note.

Fee schedule

Fee typeAmountNotes

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-08.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Wayne County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-08)View current record →All versions →

Permalink: /utah/wayne-county/unincorporated-wayne/as-of/2026-07-16/

Snapshot date: 2026-07-16

Commit: 9d25784

Reproducible from PermitBase’s version-controlled dataset, commit 9d25784.