This is PermitBase’s published record for Pleasant View as of 2026-07-07. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Pleasant View building permits
VerifiedPleasant View, Utah — as published 2026-07-07.
Verified 2026-07-13 · Source
Codes adopted
Permit types & fees
Residential Building Permit
VerifiedRequired for new single-family and two-family residential construction and any work regulated by the statewide-adopted IRC/IBC. Pleasant View uses its own valuation-based 'Table for Permit Fees' (Consolidated Fee Schedule, as of July 1, 2026) plus a locally published Residential One- and Two-Family Valuation per-square-foot table for computing project valuation.
Verified 2026-07-08 · Source
Requirements
- New single-family or two-family residential construction
- Any work regulated by the statewide-adopted IRC
- Structural modifications regulated by the statewide-adopted IBC/IRC
- Building Permit Application submitted electronically through the City Inspect online portal (utah.cityinspect.com), with required attachments uploaded
Required documents
- RequiredBuilding Permit Application (City Inspect)Submitted online via the City Inspect portal (utah.cityinspect.com/register?registration_id=Rbn7HGsHL8), per Pleasant View's official Permits page.
- RequiredSite PlanRequired attachment uploaded with the online Building Permit Application per the City Inspect submittal process described on Pleasant View's Permits page.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based Table for Permit Fees (Appendix L, per Pleasant View Consolidated Fee Schedule, as of July 1, 2026) | $1–$500: $24 flat. $501–$2,000: $24 for the first $500, plus $3 per additional $100 (or fraction). $2,001–$40,000: $69 for the first $2,000, plus $11 per additional $1,000 (or fraction). $40,001–$100,000: $487 for the first $40,000, plus $9 per additional $1,000. $100,001–$500,000: $1,027 for the first $100,000, plus $7 per additional $1,000. $500,001–$1,000,000: $3,827 for the first $500,000, plus $5 per additional $1,000. $1,000,001–$5,000,000: $6,327 for the first $1,000,000, plus $3 per additional $1,000. $5,000,001 and over: $18,327 for the first $5,000,000, plus $1 per additional $1,000. | Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 18, 'Table for Permit Fees, Appendix L.' Valuation computed using the city's own Residential One- and Two-Family Valuation per-square-foot table (same document, page 19): Main floor $112.90/sq ft, Upper floor $75.26/sq ft (2/3 of main), Unfinished basement $15.00/sq ft, Finished basement $26.90/sq ft, Attached garage $23.68/sq ft, Unattached garage/accessory building $37.33/sq ft, Pole building $25.00/sq ft. |
| Plan Check Fee | 50% of building fee (residential, standard plans); 35% of building fee (residential, for exact/duplicate plans) | Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2: 'Plan Check Fee ... (50% of building fee for residential, 65% for commercial)' and 'Plan Check Fee (for exact plans) ... 35% of building fee for residential.' |
| State Fee (surcharge) | 1% of building fee | Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 5: 'State Fee ... 1% of building fee.' This is the statewide Uniform Building Code Commission surcharge collected by all Utah municipalities. |
| Database & Support Fee | $40.00 | Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2. |
| Re-inspection Fee | $150.00 | Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 7. |
Electrical Permit
VerifiedRequired for electrical work in Pleasant View regulated by the statewide-adopted National Electrical Code. Fee is a flat inspection charge per the Consolidated Fee Schedule.
Verified 2026-07-08 · Source
Requirements
- New electrical circuits, wiring installations, or service upgrades
- Work regulated by the statewide-adopted NEC
- Building Permit Application submitted through the City Inspect online portal
Required documents
- RequiredBuilding Permit Application (City Inspect)Submitted online at utah.cityinspect.com/register?registration_id=Rbn7HGsHL8.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Inspection Fee | $75.00 | Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2: 'Electrical Inspection .................................................................................................................... $75.00.' If the electrical work is part of a larger valuation-based project, the general Building Permit Fee (Table for Permit Fees, Appendix L) and Plan Check Fee also apply; the $75.00 figure applies to standalone/minimum electrical permits, consistent with the fee schedule's 'Misc. permits ... $100.00 minimum fee for any building permit' baseline for trade-only work. |
Plumbing Permit
VerifiedRequired for plumbing installations and alterations in Pleasant View regulated by the statewide-adopted International Plumbing Code. Fee is a flat inspection charge per the Consolidated Fee Schedule; sewer and water lateral work carries a separate lateral inspection fee.
Verified 2026-07-08 · Source
Requirements
- New plumbing fixture installations, water heater installation/replacement, or water/sewer/gas line work
- Work regulated by the statewide-adopted IPC
- Building Permit Application submitted through the City Inspect online portal
Required documents
- RequiredBuilding Permit Application (City Inspect)Submitted online at utah.cityinspect.com/register?registration_id=Rbn7HGsHL8.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Inspection Fee | $75.00 | Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2: 'Plumbing Inspection ................................................................................................................... $75.00.' |
| Sewer Lateral Inspection Fee | $75.00 | Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2: 'Sewer Lateral Inspection............................................................................................................. $75.00.' |
| Water Lateral Inspection Fee | $75.00 | Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2: 'Water Lateral Inspection ............................................................................................................. $75.00.' |
Mechanical / HVAC Permit
VerifiedRequired for HVAC and gas-appliance installations in Pleasant View regulated by the statewide-adopted International Mechanical Code / International Fuel Gas Code. Flat administration fee per the Consolidated Fee Schedule.
Verified 2026-07-08 · Source
Requirements
- Furnace, boiler, or air conditioning installation or replacement
- Gas line or gas appliance work regulated by the statewide-adopted IMC/IFGC
- Building Permit Application submitted through the City Inspect online portal
Required documents
- RequiredBuilding Permit Application (City Inspect)Submitted online at utah.cityinspect.com/register?registration_id=Rbn7HGsHL8.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical/Gas Administration Fee | $75.00 | Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2: 'Mechanical/Gas Administration Fee........................................................................................... $75.00.' |
Re-Roof Permit (2nd or 3rd Layer)
VerifiedRequired for re-roofing work involving a second or third layer, classified by Pleasant View as a 'Misc. permit' with a flat minimum fee under the Consolidated Fee Schedule.
Verified 2026-07-08 · Source
Requirements
- Re-roof involving a 2nd or 3rd layer of roofing material, per the Consolidated Fee Schedule's 'Misc. permits' category
- Building Permit Application submitted through the City Inspect online portal
Required documents
- RequiredBuilding Permit Application (City Inspect)Submitted online at utah.cityinspect.com/register?registration_id=Rbn7HGsHL8.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Misc. Permit Fee (re-roof, 2nd or 3rd layer) | $100.00 minimum | Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2: 'Misc. permits ................................................................ $100.00 minimum fee for any building permit' with the category defined as '(i.e. demolition, fence, mechanical only, plumbing only, re-roof (2nd or 3rd layer)...)'. A first-layer re-roof (tear-off and replace) is not separately itemized and would be assessed under the general valuation-based Table for Permit Fees if it constitutes a full roofing replacement. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Pleasant View building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.