This is PermitBase’s published record for Pleasant View as of 2026-07-21. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Pleasant View building permits

Verified

Pleasant View, Utah — as published 2026-07-21.

Verified 2026-07-13 · Source

Codes adopted

2024 International Building Code (IBC), including Appendices C and J — current statewide code per Utah Code § 15A-2-103(1)(a), in force since July 1, 2026, under the statewide preemption mandate of § 15A-1-204 (State Construction and Fire Codes Act); Pleasant View's own codified Title 15.04 text still references the 2000 IBC (Ord. 2002-10), but that codification is stale and superseded by the mandatory statewide cycle.2021 International Residential Code (IRC) — current statewide code per Utah Code § 15A-2-103(1)(b) (unchanged by the July 1, 2026 code cycle flip); Pleasant View's Consolidated Fee Schedule (as of July 1, 2026) still labels its Table for Permit Fees 'Appendix L, 2015 IRC,' which is stale fee-table boilerplate, not evidence the city enforces an outdated code edition — plan review and inspections apply the current statewide IRC per § 15A-1-204.2024 International Plumbing Code (IPC) — current statewide code per Utah Code § 15A-2-103(1)(d); Pleasant View's codified Title 15.16.010 references the 2000 IPC (stale codification), superseded by § 15A-1-204.2024 International Mechanical Code (IMC) / International Fuel Gas Code (IFGC) — current statewide code per Utah Code § 15A-2-103(1)(e)/(f); Pleasant View's codified Title 15.12.010 references the 2000 IMC (stale codification), superseded by § 15A-1-204.2024 International Energy Conservation Code (IECC) with Utah amendments — current statewide code per Utah Code § 15A-2-103(1)(h) (a single edition applies statewide, no separate residential/commercial split); Pleasant View's codified Title 15.28.010 references the 2000 IECC (stale codification), superseded by § 15A-1-204.2023 National Electrical Code (NEC) — current statewide code per Utah Code § 15A-2-103(1)(g) (unchanged by the July 1, 2026 code cycle flip); Pleasant View's codified Title 15.20.010 references the 1999 NEC (stale codification), superseded by § 15A-1-204.

Permit types & fees

Residential Building Permit

Verified

Required for new single-family and two-family residential construction and any work regulated by the statewide-adopted IRC/IBC. Pleasant View uses its own valuation-based 'Table for Permit Fees' (Consolidated Fee Schedule, as of July 1, 2026) plus a locally published Residential One- and Two-Family Valuation per-square-foot table for computing project valuation.

Verified 2026-07-08 · Source

Requirements

  • New single-family or two-family residential construction
  • Any work regulated by the statewide-adopted IRC
  • Structural modifications regulated by the statewide-adopted IBC/IRC
  • Building Permit Application submitted electronically through the City Inspect online portal (utah.cityinspect.com), with required attachments uploaded

Required documents

  • RequiredBuilding Permit Application (City Inspect)Submitted online via the City Inspect portal (utah.cityinspect.com/register?registration_id=Rbn7HGsHL8), per Pleasant View's official Permits page.
  • RequiredSite PlanRequired attachment uploaded with the online Building Permit Application per the City Inspect submittal process described on Pleasant View's Permits page.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based Table for Permit Fees (Appendix L, per Pleasant View Consolidated Fee Schedule, as of July 1, 2026)$1–$500: $24 flat. $501–$2,000: $24 for the first $500, plus $3 per additional $100 (or fraction). $2,001–$40,000: $69 for the first $2,000, plus $11 per additional $1,000 (or fraction). $40,001–$100,000: $487 for the first $40,000, plus $9 per additional $1,000. $100,001–$500,000: $1,027 for the first $100,000, plus $7 per additional $1,000. $500,001–$1,000,000: $3,827 for the first $500,000, plus $5 per additional $1,000. $1,000,001–$5,000,000: $6,327 for the first $1,000,000, plus $3 per additional $1,000. $5,000,001 and over: $18,327 for the first $5,000,000, plus $1 per additional $1,000.
Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 18, 'Table for Permit Fees, Appendix L.' Valuation computed using the city's own Residential One- and Two-Family Valuation… Show full citation

Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 18, 'Table for Permit Fees, Appendix L.' Valuation computed using the city's own Residential One- and Two-Family Valuation per-square-foot table (same document, page 19): Main floor $112.90/sq ft, Upper floor $75.26/sq ft (2/3 of main), Unfinished basement $15.00/sq ft, Finished basement $26.90/sq ft, Attached garage $23.68/sq ft, Unattached garage/accessory building $37.33/sq ft, Pole building $25.00/sq ft.

Plan Check Fee50% of building fee (residential, standard plans); 35% of building fee (residential, for exact/duplicate plans)Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2: 'Plan Check Fee ... (50% of building fee for residential, 65% for commercial)' and 'Plan Check Fee (for exact plans) ... 35% of building fee for residential.'
State Fee (surcharge)1% of building feePleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 5: 'State Fee ... 1% of building fee.' This is the statewide Uniform Building Code Commission surcharge collected by all Utah municipalities.
Database & Support Fee$40.00Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2.
Re-inspection Fee$150.00Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 7.

Electrical Permit

Verified

Required for electrical work in Pleasant View regulated by the statewide-adopted National Electrical Code. Fee is a flat inspection charge per the Consolidated Fee Schedule. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; the Consolidated Fee Schedule (as of July 1, 2026) does not publish a separate EV-specific fee line item. Residential rooftop and ground-mount solar PV installations likewise fall under the general valuation-based Building Permit Fee (Table for Permit Fees, Appendix L) plus this flat $75.00 Electrical Inspection fee for the electrical scope — a full-text review of the Consolidated Fee Schedule (as of July 1, 2026) found no separate solar-specific permit type or fee line item.

Verified 2026-07-19 · Source

Requirements

  • New electrical circuits, wiring installations, or service upgrades
  • Work regulated by the statewide-adopted NEC
  • Building Permit Application submitted through the City Inspect online portal

Required documents

  • RequiredBuilding Permit Application (City Inspect)Submitted online at utah.cityinspect.com/register?registration_id=Rbn7HGsHL8.

Fee schedule

Fee typeAmountNotes
Electrical Inspection Fee$75.00
Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2: 'Electrical Inspection .................................................................................................................... Show full citation

Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2: 'Electrical Inspection .................................................................................................................... $75.00.' If the electrical work is part of a larger valuation-based project, the general Building Permit Fee (Table for Permit Fees, Appendix L) and Plan Check Fee also apply; the $75.00 figure applies to standalone/minimum electrical permits, consistent with the fee schedule's 'Misc. permits ... $100.00 minimum fee for any building permit' baseline for trade-only work.

Plumbing Permit

Verified

Required for plumbing installations and alterations in Pleasant View regulated by the statewide-adopted International Plumbing Code. Fee is a flat inspection charge per the Consolidated Fee Schedule; sewer and water lateral work carries a separate lateral inspection fee.

Verified 2026-07-08 · Source

Requirements

  • New plumbing fixture installations, water heater installation/replacement, or water/sewer/gas line work
  • Work regulated by the statewide-adopted IPC
  • Building Permit Application submitted through the City Inspect online portal

Required documents

  • RequiredBuilding Permit Application (City Inspect)Submitted online at utah.cityinspect.com/register?registration_id=Rbn7HGsHL8.

Fee schedule

Fee typeAmountNotes
Plumbing Inspection Fee$75.00Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2: 'Plumbing Inspection ................................................................................................................... $75.00.'
Sewer Lateral Inspection Fee$75.00Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2: 'Sewer Lateral Inspection............................................................................................................. $75.00.'
Water Lateral Inspection Fee$75.00Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2: 'Water Lateral Inspection ............................................................................................................. $75.00.'

Mechanical / HVAC Permit

Verified

Required for HVAC and gas-appliance installations in Pleasant View regulated by the statewide-adopted International Mechanical Code / International Fuel Gas Code. Flat administration fee per the Consolidated Fee Schedule.

Verified 2026-07-08 · Source

Requirements

  • Furnace, boiler, or air conditioning installation or replacement
  • Gas line or gas appliance work regulated by the statewide-adopted IMC/IFGC
  • Building Permit Application submitted through the City Inspect online portal

Required documents

  • RequiredBuilding Permit Application (City Inspect)Submitted online at utah.cityinspect.com/register?registration_id=Rbn7HGsHL8.

Fee schedule

Fee typeAmountNotes
Mechanical/Gas Administration Fee$75.00Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2: 'Mechanical/Gas Administration Fee........................................................................................... $75.00.'

Re-Roof Permit (2nd or 3rd Layer)

Verified

Required for re-roofing work involving a second or third layer, classified by Pleasant View as a 'Misc. permit' with a flat minimum fee under the Consolidated Fee Schedule.

Verified 2026-07-08 · Source

Requirements

  • Re-roof involving a 2nd or 3rd layer of roofing material, per the Consolidated Fee Schedule's 'Misc. permits' category
  • Building Permit Application submitted through the City Inspect online portal

Required documents

  • RequiredBuilding Permit Application (City Inspect)Submitted online at utah.cityinspect.com/register?registration_id=Rbn7HGsHL8.

Fee schedule

Fee typeAmountNotes
Misc. Permit Fee (re-roof, 2nd or 3rd layer)$100.00 minimum
Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2: 'Misc. Show full citation

Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2: 'Misc. permits ................................................................ $100.00 minimum fee for any building permit' with the category defined as '(i.e. demolition, fence, mechanical only, plumbing only, re-roof (2nd or 3rd layer)...)'. A first-layer re-roof (tear-off and replace) is not separately itemized and would be assessed under the general valuation-based Table for Permit Fees if it constitutes a full roofing replacement.

Commercial Building Permit

Verified

Required for new commercial construction in Pleasant View. The city's Consolidated Fee Schedule computes the Building Fee from the same valuation-based 'Table for Permit Fees' (Appendix L) used for residential construction ('Building Fee ... refer to building permit schedule, attached'), but charges a higher Plan Check Fee percentage for commercial work: 65%, versus 50% for residential.

Verified 2026-07-19 · Source

Requirements

  • New commercial construction regulated by the statewide-adopted IBC (2024 edition, effective July 1, 2026, per Utah Code § 15A-2-103(1)(a))
  • Building Permit Application submitted electronically through the City Inspect online portal (utah.cityinspect.com)
  • Accounts Receivable Deposit for commercial Site Plan/Conditional Use review ($2,000.00), plus an Engineering Deposit per lot (minimum $800.00), a Database fee ($400.00), and an Application fee ($400.00), per the Consolidated Fee Schedule's 'All Commercial Development' section — separate from and in addition to the Building Fee itself

Required documents

  • RequiredBuilding Permit Application (City Inspect)Submitted online via the City Inspect portal (utah.cityinspect.com/register?registration_id=Rbn7HGsHL8).
  • RequiredSite PlanRequired attachment uploaded with the online Building Permit Application.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based Table for Permit Fees (Appendix L, per Pleasant View Consolidated Fee Schedule, as of July 1, 2026)$1–$500: $24 flat. $501–$2,000: $24 for the first $500, plus $3 per additional $100 (or fraction). $2,001–$40,000: $69 for the first $2,000, plus $11 per additional $1,000 (or fraction). $40,001–$100,000: $487 for the first $40,000, plus $9 per additional $1,000. $100,001–$500,000: $1,027 for the first $100,000, plus $7 per additional $1,000. $500,001–$1,000,000: $3,827 for the first $500,000, plus $5 per additional $1,000. $1,000,001–$5,000,000: $6,327 for the first $1,000,000, plus $3 per additional $1,000. $5,000,001 and over: $18,327 for the first $5,000,000, plus $1 per additional $1,000.
Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 18, 'Table for Permit Fees, Appendix L' — same table used for the Residential Building Permit; Show full citation

Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 18, 'Table for Permit Fees, Appendix L' — same table used for the Residential Building Permit; the city publishes a different commercial Plan Check Fee percentage (below) rather than a separate commercial valuation table.

Plan Check Fee (commercial)65% of building feePleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2: 'Plan Check Fee ... (50% of building fee for residential, 65% for commercial).'
State Fee (surcharge)1% of building feePleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 5: 'State Fee ... 1% of building fee.'
Database & Support Fee$40.00Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2.
Re-inspection Fee$150.00Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 7.
Storm Sewer Impact Fee — Manufacturing/commercial (including office and retail)$0.412 per sq. ft. of impervious surfacePleasant View City Consolidated Fee Schedule (as of July 1, 2026), Storm Sewer Impact Fee section: 'Manufacturing / commercial (including office and retail) per sq. ft. of impervious surface.... $0.412.'
Commercial Site Plan / Conditional Use Accounts Receivable Deposit and related Planning fees$2,000.00 Accounts Receivable Deposit, plus $400.00 Engineering Deposit per lot (minimum $800.00), $400.00 Database fee, and $400.00 Application feePleasant View City Consolidated Fee Schedule (as of July 1, 2026), 'All Commercial Development' section — a Planning Department prerequisite deposit/fee bundle, separate from and in addition to the Building Fee itself.

Commercial Tenant Improvement / Tenant Finish Permit

Verified

Required for tenant improvement and interior remodel work in existing commercial buildings in Pleasant View. Uses the same valuation-based Table for Permit Fees (Appendix L) and 65% commercial Plan Check Fee as new commercial construction — tenant improvement is not one of the enumerated categories in the city's flat-fee 'Misc. permits' bucket (which covers only demolition, fence, mechanical-only, plumbing-only, and 2nd/3rd-layer re-roof), so it is billed on the general valuation-based schedule.

Verified 2026-07-19 · Source

Requirements

  • Tenant improvement / interior remodel work in an existing commercial building, regulated by the statewide-adopted IBC
  • Building Permit Application submitted through the City Inspect online portal
  • Not eligible for the city's flat $100.00-minimum 'Misc. permits' fee category, which per the Consolidated Fee Schedule is limited to demolition, fence, mechanical-only, plumbing-only, and 2nd/3rd-layer re-roof work

Required documents

  • RequiredBuilding Permit Application (City Inspect)Submitted online at utah.cityinspect.com/register?registration_id=Rbn7HGsHL8.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based Table for Permit Fees (Appendix L)$1–$500: $24 flat. $501–$2,000: $24 for the first $500, plus $3 per additional $100 (or fraction). $2,001–$40,000: $69 for the first $2,000, plus $11 per additional $1,000 (or fraction). $40,001–$100,000: $487 for the first $40,000, plus $9 per additional $1,000. $100,001–$500,000: $1,027 for the first $100,000, plus $7 per additional $1,000. $500,001–$1,000,000: $3,827 for the first $500,000, plus $5 per additional $1,000. $1,000,001–$5,000,000: $6,327 for the first $1,000,000, plus $3 per additional $1,000. $5,000,001 and over: $18,327 for the first $5,000,000, plus $1 per additional $1,000.Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 18 — same table used for new commercial and residential construction; Pleasant View does not publish a distinct tenant-improvement valuation table.
Plan Check Fee (commercial)65% of building feePleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2: 'Plan Check Fee ... (50% of building fee for residential, 65% for commercial).' Same rate applies to tenant improvement as to new commercial construction.
State Fee (surcharge)1% of building feePleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 5.
Database & Support Fee$40.00Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 2.
Re-inspection Fee$150.00Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 7.

Sign Permit

Verified

Required for placement of all signs in Pleasant View except those specifically exempted, per City Code § 18.29.310 (Chapter 18.29, Sign Regulations). It is unlawful to erect, install, or modify a sign requiring a permit without first obtaining one. Applications are accepted only from licensed general contractors or sign installation contractors (§ 18.29.140).

Verified 2026-07-20 · Source

Requirements

  • Sign must be installed by, or the application submitted by, a licensed general contractor or sign installation contractor licensed by the State of Utah (§ 18.29.140)
  • Sign must comply with current city-adopted building and construction codes; electric sign components must be labeled per U.S. Bureau of Standards, Underwriters' Laboratories, or similar authority (§ 18.29.180.A)
  • Engineering drawings stamped and signed by a Utah-licensed structural engineer, where required by the department, attesting to the adequacy of the sign's construction and supports (§ 18.29.180.B)
  • Freestanding sign structures/poles must be self-supporting and permanently attached to concrete foundations (§ 18.29.180.D)
  • A minimum 8-foot vertical clearance is required between the ground/sidewalk and any part of a projecting sign that extends more than 8 inches from a wall (§ 18.29.180.G)

Required documents

  • RequiredSign Permit ApplicationSubmitted per Chapter 18.29, Article III (Permits and Enforcement). Contact Pleasant View Planning, Zoning & Building at 801-782-8529 for the current application.
  • OptionalEngineering DrawingsStamped/signed by a Utah-licensed structural engineer, required where the department determines the proposed sign's construction adequacy needs verification (§ 18.29.180.B).

Fee schedule

Fee typeAmountNotes
Wall-mounted Sign Fee$50.00Pleasant View City Consolidated Fee Schedule, as of July 1, 2026: 'Signs — $50.00; Wall-mounted Sign Fee — $50.00.'
Monument/Low Profile Sign Fee$50.00Pleasant View City Consolidated Fee Schedule, as of July 1, 2026: 'Monument/Low Profile Sign Fee — $50.00.'
Pole Sign Fee$100.00Pleasant View City Consolidated Fee Schedule, as of July 1, 2026: 'Pole Sign Fee — $100.00.'
Billboard Fee$250.00Pleasant View City Consolidated Fee Schedule, as of July 1, 2026: 'Billboard Fee — $250.00.'
Electrical Inspection (lighted signs)Separate fee required
Pleasant View City Consolidated Fee Schedule, as of July 1, 2026, Signs section note: '(a separate electrical inspection fee will be required for lighted signs).' City Code § 18.29.310.F: 'A sign… Show full citation

Pleasant View City Consolidated Fee Schedule, as of July 1, 2026, Signs section note: '(a separate electrical inspection fee will be required for lighted signs).' City Code § 18.29.310.F: 'A sign permit does not include electrical work and a separate electrical permit shall be required.'

Investigation Fee (work without permit)Building fee doublesPleasant View City Consolidated Fee Schedule, as of July 1, 2026: 'Investigation Fee (work performed without a permit) — $ building fee doubles.'
Re-inspection Fee$150.00Pleasant View City Consolidated Fee Schedule, as of July 1, 2026: 'Re-inspection Fee — $150.00.'

Certificate of Occupancy / Change of Use (Business License Route)

Pleasant View City Code Section 18.60.020(C) makes a Certificate of Occupancy a distinct legal requirement, separate from the construction-permit process: 'No land shall be used or occupied and no building hereafter structurally altered or erected shall be used or changed in use... until a certificate of occupancy shall have been issued.' The Code specifically extends this to nonconforming-use changes: 'A like certificate shall be issued for the purpose of maintaining, renewing, changing or extending a nonconforming use.' Pleasant View does not publish a standalone change-of-use application, however -- in practice, a new occupant or a changed use in an existing commercial building is verified through the City's Business License process, which requires a Fire Department inspection and, for new applicants, a Safety Inspection performed by the City's contracted building inspector (Sunrise Engineering) before the license -- and lawful occupancy -- is granted.

Reviewed 2026-07-20 · Source

Requirements

  • A building 'used or changed in use' (Pleasant View City Code Section 18.60.020(C)) requires a certificate of occupancy before that use may lawfully commence, aside from agricultural uses
  • Maintaining, renewing, changing, or extending a nonconforming use likewise requires a new certificate of occupancy, per the same section
  • For a new business/occupant, a completed Pleasant View City Business License Application (new applicant or renewal)
  • Fire Department inspection, scheduled with the North View Fire Marshal (801-782-8159) -- required for most license types (Contractor, Wholesale & Professional, Preschool/Day Care, General/Retail, Storage Units)
  • Safety Inspection performed by the City's contracted building inspector (Sunrise Engineering, 800-560-6151) -- marked 'new applicants only' on the official Business License Application, consistent with verifying occupancy/use compliance for a new tenant or use

Required documents

  • RequiredPleasant View City Business License ApplicationOfficial fillable packet (cdnsm5-hosted.civiclive.com .../Business License packet - fillable.pdf); the practical vehicle through which a change of use or new occupant in an existing building is reviewed for fire-safety and building compliance ahead of lawful occupancy. Includes a License Eligibility Verification Affidavit for new applicants.
  • RequiredFire Department / Safety Inspection sign-offInspector's signature section on the Business License Application; Fire Department inspection via the North View Fire Marshal, Safety Inspection via Sunrise Engineering (the City's contracted building inspector) for new applicants.

Fee schedule

Fee typeAmountNotes
General/Retail Business License65.00 dollars
Pleasant View City Consolidated Fee Schedule, as of July 1, 2026 (pleasantviewut.gov/DocumentCenter/View/441), Business License Fees section, live-read 2026-07-20: 'Retail...$65.00.' Matches the… Show full citation

Pleasant View City Consolidated Fee Schedule, as of July 1, 2026 (pleasantviewut.gov/DocumentCenter/View/441), Business License Fees section, live-read 2026-07-20: 'Retail...$65.00.' Matches the 'General/Retail $65.00' line on the official fillable Business License Application packet. Requires a Fire Dept. inspection per the application form.

Storage Units Business License65.00 dollarsPleasant View City Consolidated Fee Schedule, as of July 1, 2026, Business License Fees section: 'Storage units...$65.00.' Requires a Fire Dept. inspection per the application form.
Wholesale / Professional & Occupational / Contractor Business License43.25 dollarsPleasant View City Consolidated Fee Schedule, as of July 1, 2026, Business License Fees section: 'Wholesale...$43.25,' 'Professional & occupational businesses...$43.25,' 'Contractors...$43.25.' Each requires a Fire Dept. inspection per the official application form.
Home Occupation Business License40.00 dollarsPleasant View City Consolidated Fee Schedule, as of July 1, 2026, Business License Fees section: 'Home Occupation...$40.00.'

EV Charger / EVSE Permit

Verified

Pleasant View has no distinct EV charger/EVSE permit type or fee line item — EV charger (EVSE) installation is billed under the city's standard Electrical Permit, using the same flat $75.00 Electrical Inspection fee that applies to any other standalone electrical work. Pleasant View's own Electrical Permit entry explicitly states: 'EV charger (EVSE) installations do not have their own permit type in Pleasant View — apply for this Electrical Permit and pay the flat $75.00 Electrical Inspection fee like any other standalone electrical work.' A direct check of the city's Consolidated Fee Schedule (as of July 1, 2026) confirms this flat fee and found no separate 'EV' or 'electric vehicle' line item.

Verified 2026-07-20 · Source

Requirements

  • Installation of a Level 2 or DC fast EV charger (EVSE) at a residential or commercial property in Pleasant View
  • Work regulated by the statewide-adopted 2023 National Electrical Code (Utah Code § 15A-2-103(1)(g))
  • Building Permit Application submitted through the City Inspect online portal

Required documents

  • RequiredBuilding Permit Application (City Inspect)Submitted online at utah.cityinspect.com/register?registration_id=Rbn7HGsHL8, selecting the Electrical Permit category for the EV charger circuit.

Fee schedule

Fee typeAmountNotes
Electrical Inspection Fee (covers EV charger/EVSE circuit work)$75.00
Pleasant View Consolidated Fee Schedule (as of July 1, 2026): 'Electrical Inspection $75.00.' EV charger (EVSE) installations do not have their own permit type in Pleasant View — the standard flat… Show full citation

Pleasant View Consolidated Fee Schedule (as of July 1, 2026): 'Electrical Inspection $75.00.' EV charger (EVSE) installations do not have their own permit type in Pleasant View — the standard flat Electrical Inspection fee applies. Confirmed via existing Pleasant View Electrical Permit entry in this dataset, which explicitly documents this treatment.

Misc. Permits Minimum Fee (general building permit floor, where applicable)$100.00 minimum fee for any building permitPleasant View Consolidated Fee Schedule: 'Misc. permits — $100.00 minimum fee for any building permit.'

Solar PV / Solar Panel Installation Permit

Verified

Pleasant View has no distinct solar/solar-PV permit type or fee line item — a full-text, page-by-page read of the entire 19-page Consolidated Fee Schedule (as of July 1, 2026) found no mention of 'solar,' 'photovoltaic,' 'PV,' or 'renewable energy' anywhere in the document, and neither the city's official Permits page nor its Building & Construction Applications page (which lists City Inspect, Business License, Dog License, Subdivisions/Zone Changes, and Utility Services as the enumerated application categories) references a solar-specific application. Residential rooftop or ground-mount solar PV installation is billed as a standard Building Permit for the structural/mounting scope (valuation-based Table for Permit Fees, Appendix L, with project valuation per the city's general 'ICC Building Valuation Data — most recent data available') plus the flat $75.00 Electrical Inspection fee for the electrical interconnection scope. Pleasant View's own Electrical Permit entry in this dataset independently documents the same conclusion: 'Residential rooftop and ground-mount solar PV installations likewise fall under the general valuation-based Building Permit Fee (Table for Permit Fees, Appendix L) plus this flat $75.00 Electrical Inspection fee for the electrical scope — a full-text review of the Consolidated Fee Schedule (as of July 1, 2026) found no separate solar-specific permit type or fee line item.'

Verified 2026-07-21 · Source

Requirements

  • Rooftop-mounted or ground-mount solar PV system installation, regulated by the statewide-adopted IBC/IRC for the structural/mounting scope and by the statewide-adopted 2023 National Electrical Code (Utah Code § 15A-2-103(1)(g)) for the electrical interconnection scope
  • Building Permit Application submitted electronically through the City Inspect online portal (utah.cityinspect.com), with required attachments uploaded
  • Project valuation established per the city's 'ICC Building Valuation Data (most recent data available)' for computing the Building Permit Fee, since Pleasant View does not publish a solar-specific valuation formula

Required documents

  • RequiredBuilding Permit Application (City Inspect)Submitted online via the City Inspect portal (utah.cityinspect.com/register?registration_id=Rbn7HGsHL8), per Pleasant View's official Permits and Building & Construction Applications pages — there is no separate solar-specific application form.

Fee schedule

Fee typeAmountNotes
Building Permit Fee — valuation-based Table for Permit Fees (Appendix L, per Pleasant View Consolidated Fee Schedule, as of July 1, 2026)$1–$500: $24 flat. $501–$2,000: $24 for the first $500, plus $3 per additional $100 (or fraction). $2,001–$40,000: $69 for the first $2,000, plus $11 per additional $1,000 (or fraction). $40,001–$100,000: $487 for the first $40,000, plus $9 per additional $1,000. $100,001–$500,000: $1,027 for the first $100,000, plus $7 per additional $1,000. $500,001–$1,000,000: $3,827 for the first $500,000, plus $5 per additional $1,000. $1,000,001–$5,000,000: $6,327 for the first $1,000,000, plus $3 per additional $1,000. $5,000,001 and over: $18,327 for the first $5,000,000, plus $1 per additional $1,000.
Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 18, 'Table for Permit Fees, Appendix L' — the same general table used for all other Building Permits in this dataset; Show full citation

Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 18, 'Table for Permit Fees, Appendix L' — the same general table used for all other Building Permits in this dataset; the schedule publishes no separate solar-specific valuation table, so project valuation is established per the schedule's general 'ICC Building Valuation Data (most recent data available)' line (page 3).

Electrical Inspection Fee (interconnection/electrical scope)$75.00
Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 3: 'Electrical Inspection .................................................................................................................... Show full citation

Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 3: 'Electrical Inspection .................................................................................................................... $75.00.' Confirmed via the existing Pleasant View Electrical Permit entry in this dataset, which explicitly documents that solar PV electrical work is billed under this same flat fee.

Plan Check Fee50% of building fee (residential); 65% of building fee (commercial)
Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 3: 'Plan Check Fee ... Show full citation

Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 3: 'Plan Check Fee ... (50% of building fee for residential, 65% for commercial).' Applies to solar installations billed under the general valuation-based Building Permit Fee, same as any other building permit.

State Fee (surcharge)1% of building feePleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 5: 'State Fee ... 1% of building fee.' Statewide Uniform Building Code Commission surcharge collected by all Utah municipalities.
Database & Support Fee$40.00Pleasant View City Consolidated Fee Schedule (as of July 1, 2026), page 3.

Sources & verification

Verified against official sources. Last reviewed 2026-07-13.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Pleasant View building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-20)Later version (2026-07-22) →View current record →All versions →

Permalink: /utah/weber-county/pleasant-view-ut/as-of/2026-07-21/

Snapshot date: 2026-07-21

Commit: c9b89ef

Reproducible from PermitBase’s version-controlled dataset, commit c9b89ef.