Camas building permits

Camas, Washington — as published 2026-09-16.

Reviewed 2026-09-16 · Source

Codes adopted

CAMAS NAMES NO EDITION YEAR AT ALL. CMC 15.04.010 provides that "the City of Camas adopts the most current edition of building codes adopted by the Washington State Building Code Council, as amended, pursuant to RCW 19.27.074 and as set forth in WAC 51-50 IBC/IEBC; WAC 51-51 IRC; WAC 51-52 IMC/IFGC; WAC 51-54 IFC; WAC 51-56 UPC; and WAC 51-11 energy code as amended in Section 15.04.030 of this Chapter." To learn which edition applies you must go to the WAC chapters or ask the city - the municipal code will not tell you.WHICH CYCLE THE CITY SAYS IT IS ON. The Building Division page states "2021 I-Codes will be effective, Friday, March 15, 2024". That sentence is written in the future tense and was still on the page when it was read on 2026-09-16, so it is an announcement that has since taken effect rather than a current-status statement. Confirm the governing edition with the Building Division before you design to it.APPENDICES CAMAS SPECIFICALLY ADOPTS, WHICH OTHER CITIES OFTEN DO NOT. Under the IRC: Appendix AJ Existing Buildings and Structures; Appendix AH Patio Covers; Appendix AF Radon Control Methods; Appendix AQ Tiny Homes; Appendix AWU Dwelling Unit Fire Sprinkler Systems; and Appendix AWV Fire Sprinklers. Under the IBC: Appendix H, Signs. Under the IFC: Appendices A Board of Appeals, B Fire Flow, C Hydrants, E Hazard Categories and F Hazard Ranking.For liquefied petroleum gas, CMC 15.04.010(C) provides that "the standards for liquefied petroleum gas installations shall be NFPA 58 (Storage and Handling of Liquefied Petroleum Gases) and ANSI Z223.1/NFPA 54 (National Fuel Gas Code)" rather than the IMC's own.RCW 19.27 - the Washington State Building Code applies statewide.

Permit types & fees

Building Permit

Required for construction in Camas. The city adopts whatever edition of the I-Codes the Washington State Building Code Council currently has in force, rather than a named year.

Reviewed 2026-09-16 · Source

Requirements

  • Built to the edition currently adopted by the State Building Code Council - CMC 15.04.010 names no year, so confirm the governing edition before designing
  • Filed through the city's Tyler EnerGov self-service portal
  • An application expires if no permit issues within 180 days
  • A permit is void if work does not start within 180 days, or is abandoned for 180 days

Required documents

  • RequiredPermit applicationPermit application, filed through the city's Tyler EnerGov self-service portal; questions to permits@cityofcamas.us

Fee schedule

Fee typeAmountNotes
Building permit feeNot stated in this guide - see notes
CAMAS DOES NOT PRINT PERMIT AMOUNTS IN ITS CODE, AND SAYS SO. Show full citation

CAMAS DOES NOT PRINT PERMIT AMOUNTS IN ITS CODE, AND SAYS SO. CMC 15.04.030 replaces IBC Section 109.7 with "The fee for each permit shall be set as per the fee schedule established by the City Council per Resolution." So no dollar figure appears here. THE RATIOS ARE IN THE CODE AND DO APPLY: the plan review fee "shall be sixty-five percent of the building permit fee"; a "same as" residential plan set is reviewed at fifty percent of the plan review fee, conditioned on an identical and complete set being submitted, with the first set paying one hundred percent; a permit that has expired for time may be renewed "for one-half of the original permit fee"; and starting work without a permit triggers an investigation fee "equal to the amount of the permit fee required by this code", charged whether or not a permit is ever issued. Ask the Building Division for the Council's current fee schedule.

Accessory Dwelling Unit (ADU)

Camas applies its residential fire sprinkler requirement to new detached accessory dwelling units, which is a substantial design and cost consideration many owners do not expect.

Reviewed 2026-09-16 · Source

Requirements

  • A new accessory detached dwelling unit is subject to CMC 15.17.050, which requires an automatic fire sprinkler system
  • The same requirement applies to a dwelling undergoing a "substantial" remodel
  • Camas specifically adopts IRC Appendix AQ, Tiny Homes
  • Built to the edition currently adopted by the State Building Code Council

Required documents

  • RequiredPermit applicationPermit application, filed through the city's Tyler EnerGov self-service portal; questions to permits@cityofcamas.us

Fee schedule

Fee typeAmountNotes
Building permit feeNot stated in this guide - see notes
CAMAS DOES NOT PRINT PERMIT AMOUNTS IN ITS CODE, AND SAYS SO. Show full citation

CAMAS DOES NOT PRINT PERMIT AMOUNTS IN ITS CODE, AND SAYS SO. CMC 15.04.030 replaces IBC Section 109.7 with "The fee for each permit shall be set as per the fee schedule established by the City Council per Resolution." So no dollar figure appears here. THE RATIOS ARE IN THE CODE AND DO APPLY: the plan review fee "shall be sixty-five percent of the building permit fee"; a "same as" residential plan set is reviewed at fifty percent of the plan review fee, conditioned on an identical and complete set being submitted, with the first set paying one hundred percent; a permit that has expired for time may be renewed "for one-half of the original permit fee"; and starting work without a permit triggers an investigation fee "equal to the amount of the permit fee required by this code", charged whether or not a permit is ever issued. Ask the Building Division for the Council's current fee schedule.

Patio Cover

Camas specifically adopts IRC Appendix AH, Patio Covers, so the appendix's provisions apply here rather than being optional.

Reviewed 2026-09-16 · Source

Requirements

  • IRC Appendix AH, Patio Covers, is specifically adopted at CMC 15.04.010(B)
  • Built to the edition currently adopted by the State Building Code Council

Required documents

  • RequiredPermit applicationPermit application, filed through the city's Tyler EnerGov self-service portal; questions to permits@cityofcamas.us

Fee schedule

Fee typeAmountNotes
Building permit feeNot stated in this guide - see notes
CAMAS DOES NOT PRINT PERMIT AMOUNTS IN ITS CODE, AND SAYS SO. Show full citation

CAMAS DOES NOT PRINT PERMIT AMOUNTS IN ITS CODE, AND SAYS SO. CMC 15.04.030 replaces IBC Section 109.7 with "The fee for each permit shall be set as per the fee schedule established by the City Council per Resolution." So no dollar figure appears here. THE RATIOS ARE IN THE CODE AND DO APPLY: the plan review fee "shall be sixty-five percent of the building permit fee"; a "same as" residential plan set is reviewed at fifty percent of the plan review fee, conditioned on an identical and complete set being submitted, with the first set paying one hundred percent; a permit that has expired for time may be renewed "for one-half of the original permit fee"; and starting work without a permit triggers an investigation fee "equal to the amount of the permit fee required by this code", charged whether or not a permit is ever issued. Ask the Building Division for the Council's current fee schedule.

Verify a Contractor Licence

Washington contractors register with the Department of Labor & Industries. Registration is a STATE record; Camas does not issue it.

Reviewed 2026-09-16 · Source

Requirements

  • Check contractor registration with Washington State Labor & Industries

Required documents

  • OptionalNo city document requiredNo city document - check the state register

Fee schedule

Fee typeAmountNotes
Building permit feeNot stated in this guide - see notes
CAMAS DOES NOT PRINT PERMIT AMOUNTS IN ITS CODE, AND SAYS SO. Show full citation

CAMAS DOES NOT PRINT PERMIT AMOUNTS IN ITS CODE, AND SAYS SO. CMC 15.04.030 replaces IBC Section 109.7 with "The fee for each permit shall be set as per the fee schedule established by the City Council per Resolution." So no dollar figure appears here. THE RATIOS ARE IN THE CODE AND DO APPLY: the plan review fee "shall be sixty-five percent of the building permit fee"; a "same as" residential plan set is reviewed at fifty percent of the plan review fee, conditioned on an identical and complete set being submitted, with the first set paying one hundred percent; a permit that has expired for time may be renewed "for one-half of the original permit fee"; and starting work without a permit triggers an investigation fee "equal to the amount of the permit fee required by this code", charged whether or not a permit is ever issued. Ask the Building Division for the Council's current fee schedule.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-09-16.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Camas building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /washington/clark-county-wa/camas/as-of/2026-09-16/

Snapshot date: 2026-09-16

Commit: 6cf9cee

Reproducible from PermitBase’s version-controlled dataset, commit 6cf9cee.