Vancouver building permits

Vancouver, Washington — as published 2026-09-16.

Reviewed 2026-09-16 · Source

Codes adopted

VANCOUVER NAMES NO EDITION. VMC 17.12.010: "As required by RCW Chapter 19.27, the City of Vancouver hereby adopts by reference Washington State's currently adopted International Building Code (IBC) and appendices I and J (not including IBC Section J103.2, Exemption 1) and M (International Existing Building Code) as published by the International Code Council, and as adopted and amended by RCW Chapter 19.27, WAC Chapter 51-50, and the provisions of this chapter."THE RESIDENTIAL CODE IS ADOPTED THE SAME WAY. VMC 17.10.010 adopts "Washington State's currently adopted International Residential Code (IRC) and appendices F, G, H and K".NEITHER CODE'S CHAPTER 1 IS ADOPTED. VMC 17.12.010 states "The City of Vancouver does not adopt IBC Chapter 1" and VMC 17.10.010 states "The city of Vancouver does not adopt IRC Chapter 1." Chapter 1 is the administrative chapter in each model code; VMC Chapter 17.08 replaces it, and enforcement runs through VMC Title 22.The exclusion at VMC 17.12.010 is surgical: appendix J is adopted but "not including IBC Section J103.2, Exemption 1".Title 17 also carries separate chapters for the Energy Code (17.09), National Electrical Code (17.16), Uniform Plumbing Code (17.20), International Mechanical Code (17.24), Manufactured Housing (17.25) and the National Green Building Standard (17.42).RCW 19.27 - the Washington State Building Code applies statewide.

Permit types & fees

Building Permit

Required for construction in Vancouver. Unusually for Washington, the permit fee schedule is published in the municipal code rather than in a separate council resolution.

Reviewed 2026-09-16 · Source

Requirements

  • Built to Washington State's currently adopted IBC or IRC - VMC Title 17 names no edition year
  • Neither model code's Chapter 1 applies; VMC Chapter 17.08 supplies the administration
  • Valuation is determined by the building official from national statistical averages, not by the applicant
  • A permit is not valid until the permit and construction documents are approved AND the fees are paid

Required documents

  • RequiredBuilding permit application and construction documentsBuilding permit application and construction documents, as required by VMC 17.08.100

Fee schedule

Fee typeAmountNotes
Building permit feeFrom the city's own schedule - see notes
VANCOUVER IS UNUSUAL: ITS BUILDING PERMIT FEES ARE IN THE CODE ITSELF, AS TABLE I OF VMC 17.08, marked "2026 Fees". Show full citation

VANCOUVER IS UNUSUAL: ITS BUILDING PERMIT FEES ARE IN THE CODE ITSELF, AS TABLE I OF VMC 17.08, marked "2026 Fees". The schedule is valuation-based and regressive, starting at $30.93 for work valued at $1 to $500 and reaching "$7,378.62 for the first $1,000,000 plus $4.14 for each additional $1,000 or fraction thereof" at the top bracket. THREE THINGS ARE ADDED ON TOP AND PEOPLE MISS THEM: a plan review fee of 65% of the building permit fee (100% if you want fast track review); a technology fee of five and one-half percent applied to the building fund fees in Tables I through VI; and, where the work involves two or more codes, a single permit fee of ONE AND SIX-TENTHS TIMES the fee otherwise set out. Valuation itself is not yours to choose - VMC 17.08.130 provides that it "shall be generated from national statistical averages as found in 'Building Standards' or similar source", with the determination made by the building official. These figures were read from the code on 2026-09-16 and checked for internal consistency; confirm them with the city before relying on them for a budget.

Deck Permit

Residential decks in Vancouver are built to the state's currently adopted IRC as amended by VMC 17.10, using the city's own design criteria.

Reviewed 2026-09-16 · Source

Requirements

  • Minimum roof snow load 25 lbs/sft for any covered structure
  • Frost depth 12 inches - footings must bear below it
  • Seismic design category D1
  • Design wind speed: V-ASD 105 mph or V-ULT 135 mph (Risk Category II) - use the one your design method calls for

Required documents

  • RequiredBuilding permit application and construction documentsBuilding permit application and construction documents, as required by VMC 17.08.100

Fee schedule

Fee typeAmountNotes
Building permit feeFrom the city's own schedule - see notes
VANCOUVER IS UNUSUAL: ITS BUILDING PERMIT FEES ARE IN THE CODE ITSELF, AS TABLE I OF VMC 17.08, marked "2026 Fees". Show full citation

VANCOUVER IS UNUSUAL: ITS BUILDING PERMIT FEES ARE IN THE CODE ITSELF, AS TABLE I OF VMC 17.08, marked "2026 Fees". The schedule is valuation-based and regressive, starting at $30.93 for work valued at $1 to $500 and reaching "$7,378.62 for the first $1,000,000 plus $4.14 for each additional $1,000 or fraction thereof" at the top bracket. THREE THINGS ARE ADDED ON TOP AND PEOPLE MISS THEM: a plan review fee of 65% of the building permit fee (100% if you want fast track review); a technology fee of five and one-half percent applied to the building fund fees in Tables I through VI; and, where the work involves two or more codes, a single permit fee of ONE AND SIX-TENTHS TIMES the fee otherwise set out. Valuation itself is not yours to choose - VMC 17.08.130 provides that it "shall be generated from national statistical averages as found in 'Building Standards' or similar source", with the determination made by the building official. These figures were read from the code on 2026-09-16 and checked for internal consistency; confirm them with the city before relying on them for a budget.

Verify a Contractor Licence

Washington contractors register with the Department of Labor & Industries. Registration is a STATE record; Vancouver does not issue it.

Reviewed 2026-09-16 · Source

Requirements

  • Check contractor registration with Washington State Labor & Industries

Required documents

  • OptionalNo city document requiredNo city document - check the state register

Fee schedule

Fee typeAmountNotes
Building permit feeFrom the city's own schedule - see notes
VANCOUVER IS UNUSUAL: ITS BUILDING PERMIT FEES ARE IN THE CODE ITSELF, AS TABLE I OF VMC 17.08, marked "2026 Fees". Show full citation

VANCOUVER IS UNUSUAL: ITS BUILDING PERMIT FEES ARE IN THE CODE ITSELF, AS TABLE I OF VMC 17.08, marked "2026 Fees". The schedule is valuation-based and regressive, starting at $30.93 for work valued at $1 to $500 and reaching "$7,378.62 for the first $1,000,000 plus $4.14 for each additional $1,000 or fraction thereof" at the top bracket. THREE THINGS ARE ADDED ON TOP AND PEOPLE MISS THEM: a plan review fee of 65% of the building permit fee (100% if you want fast track review); a technology fee of five and one-half percent applied to the building fund fees in Tables I through VI; and, where the work involves two or more codes, a single permit fee of ONE AND SIX-TENTHS TIMES the fee otherwise set out. Valuation itself is not yours to choose - VMC 17.08.130 provides that it "shall be generated from national statistical averages as found in 'Building Standards' or similar source", with the determination made by the building official. These figures were read from the code on 2026-09-16 and checked for internal consistency; confirm them with the city before relying on them for a budget.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-09-16.

Department & other records

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Vancouver building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →