You are viewing the permanent link for the record currently in effect, published 2026-09-16.
Issaquah building permits
VerifiedIssaquah, Washington — as published 2026-09-16.
Verified 2026-09-16 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new one- and two-family dwellings and townhouses in Issaquah, reviewed under the 2021 International Residential Code and administered through the city's own Construction Administrative Code.
Verified 2026-09-16 · Source
Requirements
- “2021 International Residential Code – Chapter 51-51 WAC” (CAC 101.2)
- IRC Appendices F (Radon Control Methods), Q (Tiny Houses) and U (Dwelling Unit Fire Sprinkler Systems) are included; other appendices “shall not apply unless specifically adopted”
- The IRC also covers adult family homes, foster family care homes and family day care homes licensed by the Washington State Department of Social and Health Services (CAC 101.4.2)
- Fees are charged on valuation under Table A, and valuation includes the contractor's overhead and profit
- Applications expire 18 months after filing; permits expire 2 years after issuance (CAC 105.3.4, 105.5)
Required documents
- RequiredBuilding Permit ApplicationA permit “shall not be valid until the fees prescribed by law, outlined in the Construction Administrative Code, or adopted by resolution have been paid” (CAC 109.1).
- RequiredSubmittal Documents for Plan ReviewRequired by CAC Section 107. A plan review fee is paid at the time of submitting them; the Building Official may take a deposit in lieu of the full fee “if the full amount is not known at the time” (CAC 109.3).
- RequiredContractor Code of Conduct AgreementIMC 16.01.060 requires agreement to the contractor code of conduct, and IMC 16.01.070 makes contractors responsible for the actions of their subcontractors.
- OptionalAffordable Housing DocumentationNeeded to obtain the fee waiver under CAC 109.2.A where units qualify as affordable housing as defined in Chapter 18.102 IMC. In mixed buildings fees are pro-rated by the number of affordable units.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building permit (valuation-tiered) | $33.26 minimum, tiered by valuation | ISSAQUAH ACTUALLY PUBLISHES THE NUMBERS — the first city in this Washington set to do so. Show full citationHideISSAQUAH ACTUALLY PUBLISHES THE NUMBERS — the first city in this Washington set to do so. Construction Administrative Code Section 109.2, Table A: “$1.00 to $500.00 — $33.26”; “$501.00 to $2,000.00 — $33.26 for the first $500.00 plus $4.16 for each additional $100.00, or fraction thereof”; then bases of $99.16 at $2,000, $558.75 at $25,000, $919.23 at $50,000, $1,418.35 at $100,000, $4,618.29 at $500,000 and $8,009.61 above $1,000,000, with marginal rates of $20.13, $14.61, $9.69, $8.00, $6.67 and $5.54 per $1,000. Fees are charged on VALUATION as determined under CAC 109.4. CONTINUITY CONTROL RUN ON TABLE A, AND IT FIRES AT 6 OF 7 BRACKET BOUNDARIES. Carrying each bracket's stated base plus its marginal rate across the bracket width does not reproduce the next bracket's stated base: at $2,000 the carry gives $95.66 against a stated $99.16 (+$3.50); at $25,000, $562.15 against $558.75 (-$3.40); at $50,000, $924.00 against $919.23 (-$4.77); at $100,000, $1,403.73 against $1,418.35 (+$14.62); at $500,000, $4,618.35 against $4,618.29 (-$0.06); at $1,000,000, $7,953.29 against $8,009.61 (+$56.32). Only the $500 boundary reconciles exactly. THIS IS NOT ASSERTED TO BE AN ERROR — the residuals run in both directions and are mostly small, which is what per-row derivation with independent rounding looks like rather than a drafting mistake. The practical consequence is the useful part: USE THE STATED BASE FOR YOUR OWN BRACKET AND DO NOT ACCUMULATE UP FROM A LOWER ONE, because the two methods disagree. |
| Affordable housing | Waived for affordable housing units | CAC 109.2.A: building permit fees “excluding fees for affordable housing [as defined in Chapter 18.102 IMC] which shall be waived”. In buildings where not all units are affordable, “permit fees shall be pro-rated based on the number of affordable units.” |
| Refund if withdrawn | Up to 80% refunded if no work is done | CAC 109.7: “not more than 80 percent of the permit fee paid when no work has been done”, and the same cap on plan review fees where an application is withdrawn or cancelled before any plan review is done. |
| Refund if charged in error | 100% only if charged in error | CAC 109.7: “The Building Official may authorize full refund only if the fee was charged in error or the wrong type of permit was selected…” |
Commercial Building Permit
VerifiedRequired for commercial construction, alteration, movement, enlargement, repair, change of use and demolition in Issaquah, under the 2021 International Building Code and the city's Construction Administrative Code.
Verified 2026-09-16 · Source
Requirements
- “2021 International Building Code – Chapter 51-50 Washington Administrative Code” (CAC 101.2)
- The 2021 International Existing Building Code is listed alongside it, also under Chapter 51-50 WAC
- The IBC applies to “the construction, alteration, movement, enlargement, replacement, repair, equipment, use and occupancy, location, maintenance, removal, and demolition of every building or structure” (CAC 101.4.1)
- Fees follow Table A on valuation, with inspection, plan review and related services added under Table D
- Permits expire 2 years after issuance, extendable for phased work “due to the unique size and scope of project work” with a pre-approved construction schedule
Required documents
- RequiredBuilding Permit ApplicationNot valid until fees are paid under CAC 109.1.
- RequiredSubmittal Documents for Plan ReviewPer CAC Section 107; consultants may be used under CAC 107.3.1, in which case a plan review fee is payable at submittal.
- RequiredContractor Code of Conduct AgreementRequired under IMC 16.01.060.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building permit (valuation-tiered) | $33.26 minimum, tiered by valuation | ISSAQUAH ACTUALLY PUBLISHES THE NUMBERS — the first city in this Washington set to do so. Show full citationHideISSAQUAH ACTUALLY PUBLISHES THE NUMBERS — the first city in this Washington set to do so. Construction Administrative Code Section 109.2, Table A: “$1.00 to $500.00 — $33.26”; “$501.00 to $2,000.00 — $33.26 for the first $500.00 plus $4.16 for each additional $100.00, or fraction thereof”; then bases of $99.16 at $2,000, $558.75 at $25,000, $919.23 at $50,000, $1,418.35 at $100,000, $4,618.29 at $500,000 and $8,009.61 above $1,000,000, with marginal rates of $20.13, $14.61, $9.69, $8.00, $6.67 and $5.54 per $1,000. Fees are charged on VALUATION as determined under CAC 109.4. CONTINUITY CONTROL RUN ON TABLE A, AND IT FIRES AT 6 OF 7 BRACKET BOUNDARIES. Carrying each bracket's stated base plus its marginal rate across the bracket width does not reproduce the next bracket's stated base: at $2,000 the carry gives $95.66 against a stated $99.16 (+$3.50); at $25,000, $562.15 against $558.75 (-$3.40); at $50,000, $924.00 against $919.23 (-$4.77); at $100,000, $1,403.73 against $1,418.35 (+$14.62); at $500,000, $4,618.35 against $4,618.29 (-$0.06); at $1,000,000, $7,953.29 against $8,009.61 (+$56.32). Only the $500 boundary reconciles exactly. THIS IS NOT ASSERTED TO BE AN ERROR — the residuals run in both directions and are mostly small, which is what per-row derivation with independent rounding looks like rather than a drafting mistake. The practical consequence is the useful part: USE THE STATED BASE FOR YOUR OWN BRACKET AND DO NOT ACCUMULATE UP FROM A LOWER ONE, because the two methods disagree. |
| Plan review | Paid at submittal; deposit allowed | CAC 109.3: “a plan review fee shall be paid at the time of submitting the submittal documents for plan review. The Building Official has the option to charge a deposit, in lieu of the full plan review fee, if the full amount is not known at the time.” |
| Refund if withdrawn | Up to 80% refunded if no work is done | CAC 109.7: “not more than 80 percent of the permit fee paid when no work has been done”, and the same cap on plan review fees where an application is withdrawn or cancelled before any plan review is done. |
| Refund if charged in error | 100% only if charged in error | CAC 109.7: “The Building Official may authorize full refund only if the fee was charged in error or the wrong type of permit was selected…” |
Plumbing Permit
VerifiedPlumbing work in Issaquah is reviewed under the 2021 Uniform Plumbing Code, with house plumbing fees set as a percentage of the building permit fee.
Verified 2026-09-16 · Source
Requirements
- “2021 Uniform Plumbing Code – Chapter 51-56 WAC” (CAC 101.2)
- Table B-1 governs one- and two-family dwellings and townhouses; Table B-2 governs commercial and multifamily and was NOT read for this entry
- “Plumbing Permit Fee for new construction: An amount equal to 8% of the determined building permit” fee (Table B-1)
- Additional inspection, plan review and related fees come from Table D
Required documents
- RequiredPlumbing Permit ApplicationFiled under IMC Chapter 16.04; not valid until fees are paid (CAC 109.1).
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| New construction (1-2 family) | 8% of the building permit fee | Table B-1: “Plumbing Permit Fee for new construction — An amount equal to 8% of the determined building permit” fee, for one- and two-family dwellings and townhouses. Commercial and multifamily work uses Table B-2, which was not read for this entry. |
| Refund if withdrawn | Up to 80% refunded if no work is done | CAC 109.7: “not more than 80 percent of the permit fee paid when no work has been done”, and the same cap on plan review fees where an application is withdrawn or cancelled before any plan review is done. |
| Refund if charged in error | 100% only if charged in error | CAC 109.7: “The Building Official may authorize full refund only if the fee was charged in error or the wrong type of permit was selected…” |
Mechanical Permit
VerifiedMechanical and fuel gas work in Issaquah is reviewed under the 2021 International Mechanical Code together with the fuel gas codes named in the Construction Administrative Code.
Verified 2026-09-16 · Source
Requirements
- “2021 International Mechanical Code – Chapter 51-52 WAC” (CAC 101.2)
- “2021 National Fuel Gas Code (NFPA 54) – Chapter 51-52 WAC” and “2021 International Fuel Gas Code – Chapter 51-52 WAC”
- “2020 Liquefied Petroleum Gas Code (NFPA 58) – Chapter 51-52 WAC” — the one document named at a 2020 edition
- Each has its own adopting section: IMC 16.04.040, 16.04.050, 16.04.060 and 16.04.070
Required documents
- RequiredMechanical Permit ApplicationFiled under IMC Chapter 16.04; not valid until fees are paid (CAC 109.1).
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical permit | Per CAC Table A/D on valuation | CAC 109.2 charges mechanical permits through the city's published schedule: “For buildings, structures, gas, mechanical and plumbing systems, or alterations requiring a permit, a fee for each permit… Show full citationHideCAC 109.2 charges mechanical permits through the city's published schedule: “For buildings, structures, gas, mechanical and plumbing systems, or alterations requiring a permit, a fee for each permit shall be paid as required, in accordance with the schedule as established by the City of Issaquah.” Additional inspection and plan review charges come from Table D, which was not read for this entry. |
| Refund if withdrawn | Up to 80% refunded if no work is done | CAC 109.7: “not more than 80 percent of the permit fee paid when no work has been done”, and the same cap on plan review fees where an application is withdrawn or cancelled before any plan review is done. |
| Refund if charged in error | 100% only if charged in error | CAC 109.7: “The Building Official may authorize full refund only if the fee was charged in error or the wrong type of permit was selected…” |
Electrical Permit
VerifiedIssaquah's construction codes chapter adopts no electrical code, and its definition of the NEC is the only one that does not tie to a city adoption.
Verified 2026-09-16 · Source
Requirements
- THE SECTION LIST OF IMC CHAPTER 16.04 CONTAINS NO ELECTRICAL ADOPTION SECTION — it runs Construction Administrative Code, IBC, IRC, IEBC, IMC, NFPA 54, NFPA 58, IFGC, UPC, energy code, IPMC, ISPSC, IWUIC Section 403.2.4, documents to be filed, and violation/penalty
- CAC 101.2.1(11): “‘NEC’ means the latest edition of the National Electrical Code promulgated by the National Fire Protection Association.” — with no “as adopted by the City”, unlike every sibling definition
- CAC 101.2 does not list an electrical code among the Applicable Codes
- CONFIRM WITH THE CITY OR L&I which body issues electrical permits for your project; this entry does not establish it
Required documents
- RequiredElectrical Permit ApplicationNOT ESTABLISHED FROM THE CODE. Chapter 16.04 adopts no electrical code and does not say who issues electrical permits; ask the city or the Washington State Department of Labor and Industries before filing.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical permit | Not published in the code — ask city | No electrical fee appears in IMC Chapter 16.04, which contains no electrical adoption section at all. The absence is bounded to that chapter's full section list, which contains no electrical section. |
Expanded Work Hours Permit
VerifiedRequired to carry out construction outside Issaquah's default hours, which exclude weekends and legal holidays entirely.
Verified 2026-09-16 · Source
Requirements
- Default hours are “only between the hours of 7:00 a.m. and 6:00 p.m. on weekdays, excluding weekdays that are legal holidays” (IMC 16.35.010(A))
- Applies to building permits, utility permits, grading permits and land use certification permits alike
- Approved by the City Development Services Director or the Director of Public Works Engineering “as determined by the Mayor”
- Three application classes: Class 0 (minor work valued under $15,000), Class 1 (a single-family residence not part of a larger residential project), Class 2 (everything else)
- “Approval may only be for specific dates and times and under terms that the approving official deems appropriate”
- Regular municipal maintenance and operations activities not covered by a City permit are outside the chapter
Required documents
- RequiredExpanded Work Hours Permit ApplicationFiled in the applicable class under IMC 16.35.005. The Development Services Director sets the review procedures and approval criteria, aimed at ensuring the hours “will not unreasonably disturb persons or property in the vicinity of the work”.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Application fee | Set in Land Use and Site Work Schedule | IMC 16.35.010(B): “The application fee established in the Land Use and Site Work Fee Schedule shall be paid for review and potential issuance of the expanded work hours permit.” That schedule is not part of the municipal code and no amount is published here. |
| After-hours inspection | Minimum charge applies after hours | IMC 16.35.020 is titled “Minimum inspection charges after hours.” The section was not opened for this entry, so the amount and its conditions are not stated here. |
Sources & verification
Verified against official sources. Last reviewed 2026-09-16.
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Issaquah building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.