Issaquah building permits

Verified

Issaquah, Washington — as published 2026-09-16.

Verified 2026-09-16 · Source

Codes adopted

ISSAQUAH WROTE ITS OWN ADMINISTRATIVE CODE RATHER THAN ADOPTING THE MODEL ONE. IMC 16.04.010 sets out a full “Construction Administrative Code” (CAC): “101.1 Title. These regulations shall be known as the Construction Administrative Code (CAC) of the City of Issaquah, hereinafter referred to as ‘this code.’” Chapter 16.04 runs to roughly 257,000 characters, most of it local administrative text rather than adoption-by-reference.THE NAMED LIST — CAC 101.2 Applicable Codes: “2021 International Building Code – Chapter 51-50 Washington Administrative Code (‘WAC’); 2021 International Residential Code – Chapter 51-51 WAC; 2021 International Mechanical Code – Chapter 51-52 WAC; 2021 National Fuel Gas Code (NFPA 54) – Chapter 51-52 WAC; 2020 Liquefied Petroleum Gas Code (NFPA 58) – Chapter 51-52 WAC; 2021 International Fuel Gas Code – Chapter 51-52 WAC; 2021 Uniform Plumbing Code – Chapter 51-56 WAC; 2021 Washington State Energy Code – Chapters 51-11C and 51-11R WAC; … 2021 International Existing Building Code – Chapter 51-50 WAC; 2021 International Property Maintenance Code; 2021 International Wildland Interface Code; 2021 International Swimming Pool and Spa Code – Chapter 51-51 WAC”.NFPA 58 IS 2020 WHILE EVERYTHING ELSE IS 2021 — AND LAKE STEVENS PUBLISHES THE SAME SPLIT. Two independently drafted codes in this set both name the Liquefied Petroleum Gas Code at its 2020 edition alongside 2021 for the IMC, IFGC and NFPA 54. The agreement of two unrelated cities is why this is recorded as the state-adopted vintage rather than flagged as a typo.BUT THE SAME CHAPTER DELEGATES IN ITS DEFINITIONS, WHICH IS WHERE A BINDING CAN HIDE. CAC 101.2.1 defines each acronym used throughout the code as the LATEST edition: “‘IBC’ means the latest edition of the International Building Code promulgated by the International Code Council as adopted by the City”, and likewise for the IEBC, IMC, IPMC, IRC, UPC, “energy code” and “housing code”. Those definitions resolve circularly back to what the City has adopted — the named 2021 editions in 101.2 — so 2021 is what applies; but a reader who consults only the definitions would find no year at all.THE ELECTRICAL DEFINITION IS THE ONE THAT DROPS THE QUALIFIER. Every other acronym is defined as the latest edition “as adopted by the City”. CAC 101.2.1(11) reads: “‘NEC’ means the latest edition of the National Electrical Code promulgated by the National Fire Protection Association.” — with no “as adopted by the City”. Consistent with that, the section list of Chapter 16.04 contains NO electrical adoption section at all: it runs CAC, IBC, IRC, IEBC, IMC, NFPA 54, NFPA 58, IFGC, UPC, energy code, IPMC, ISPSC, IWUIC 403.2.4, documents to be filed, and violation/penalty.IRC APPENDICES: “IRC Appendix F – Radon Control Methods, Appendix Q – Tiny Houses, and Appendix U – Dwelling Unit Fire Sprinkler Systems are included in adoption of the International Residential Code.” Lake Stevens takes F and Q; Issaquah adds U. Otherwise “Provisions in the appendices shall not apply unless specifically adopted” (CAC 101.2.2).A STATE-LEVEL CONSTRAINT ON LOCAL APPENDIX ADOPTION IS QUOTED IN THE CODE: “An appendix adopted by the City that affects single-family or multifamily residential buildings as defined in RCW 19.27.015 shall not be effective unless approved by the State Building Code Council pursuant to RCW 19.27.060(1)(a).” (CAC 101.4.2.1).The Wildland-Urban Interface code is adopted only in part — IMC 16.04.111 is titled “International Wildland-Urban Interface Code Section 403.2.4 adopted.”, a single section, while CAC 101.2 lists the whole “2021 International Wildland Interface Code”. NOTE ALSO THE NAME VARIANT between those two places: “Wildland Interface” in the applicability list, “Wildland-Urban Interface” in the section heading.The fire code is NOT in this chapter: the chapter's own footnote reads “For adoption of the International Fire Code, see Chapter 16.06 IMC.”, and Chapter 16.06 was not opened for this entry.NOT OPENED FOR THIS ENTRY: IMC 16.06 (Fire Code), 16.08 (Fire Zone), 16.10 (Conversion Condominium), 16.20 (Site Renovation), 16.24 (Improvements in Hazardous Areas), 16.26 (Clearing, Grading, and Stormwater Management), 16.36 (Areas of Special Flood Hazard), 16.38 (Fats, Oils and Grease Regulations), 16.40 (Sustainable Building Regulations), and the whole of the separately published Land Use Code (IMC Title 18 / LUC Parts I–VIII).

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new one- and two-family dwellings and townhouses in Issaquah, reviewed under the 2021 International Residential Code and administered through the city's own Construction Administrative Code.

Verified 2026-09-16 · Source

Requirements

  • “2021 International Residential Code – Chapter 51-51 WAC” (CAC 101.2)
  • IRC Appendices F (Radon Control Methods), Q (Tiny Houses) and U (Dwelling Unit Fire Sprinkler Systems) are included; other appendices “shall not apply unless specifically adopted”
  • The IRC also covers adult family homes, foster family care homes and family day care homes licensed by the Washington State Department of Social and Health Services (CAC 101.4.2)
  • Fees are charged on valuation under Table A, and valuation includes the contractor's overhead and profit
  • Applications expire 18 months after filing; permits expire 2 years after issuance (CAC 105.3.4, 105.5)

Required documents

  • RequiredBuilding Permit ApplicationA permit “shall not be valid until the fees prescribed by law, outlined in the Construction Administrative Code, or adopted by resolution have been paid” (CAC 109.1).
  • RequiredSubmittal Documents for Plan ReviewRequired by CAC Section 107. A plan review fee is paid at the time of submitting them; the Building Official may take a deposit in lieu of the full fee “if the full amount is not known at the time” (CAC 109.3).
  • RequiredContractor Code of Conduct AgreementIMC 16.01.060 requires agreement to the contractor code of conduct, and IMC 16.01.070 makes contractors responsible for the actions of their subcontractors.
  • OptionalAffordable Housing DocumentationNeeded to obtain the fee waiver under CAC 109.2.A where units qualify as affordable housing as defined in Chapter 18.102 IMC. In mixed buildings fees are pro-rated by the number of affordable units.

Fee schedule

Fee typeAmountNotes
Building permit (valuation-tiered)$33.26 minimum, tiered by valuation
ISSAQUAH ACTUALLY PUBLISHES THE NUMBERS — the first city in this Washington set to do so. Show full citation

ISSAQUAH ACTUALLY PUBLISHES THE NUMBERS — the first city in this Washington set to do so. Construction Administrative Code Section 109.2, Table A: “$1.00 to $500.00 — $33.26”; “$501.00 to $2,000.00 — $33.26 for the first $500.00 plus $4.16 for each additional $100.00, or fraction thereof”; then bases of $99.16 at $2,000, $558.75 at $25,000, $919.23 at $50,000, $1,418.35 at $100,000, $4,618.29 at $500,000 and $8,009.61 above $1,000,000, with marginal rates of $20.13, $14.61, $9.69, $8.00, $6.67 and $5.54 per $1,000. Fees are charged on VALUATION as determined under CAC 109.4. CONTINUITY CONTROL RUN ON TABLE A, AND IT FIRES AT 6 OF 7 BRACKET BOUNDARIES. Carrying each bracket's stated base plus its marginal rate across the bracket width does not reproduce the next bracket's stated base: at $2,000 the carry gives $95.66 against a stated $99.16 (+$3.50); at $25,000, $562.15 against $558.75 (-$3.40); at $50,000, $924.00 against $919.23 (-$4.77); at $100,000, $1,403.73 against $1,418.35 (+$14.62); at $500,000, $4,618.35 against $4,618.29 (-$0.06); at $1,000,000, $7,953.29 against $8,009.61 (+$56.32). Only the $500 boundary reconciles exactly. THIS IS NOT ASSERTED TO BE AN ERROR — the residuals run in both directions and are mostly small, which is what per-row derivation with independent rounding looks like rather than a drafting mistake. The practical consequence is the useful part: USE THE STATED BASE FOR YOUR OWN BRACKET AND DO NOT ACCUMULATE UP FROM A LOWER ONE, because the two methods disagree.

Affordable housingWaived for affordable housing unitsCAC 109.2.A: building permit fees “excluding fees for affordable housing [as defined in Chapter 18.102 IMC] which shall be waived”. In buildings where not all units are affordable, “permit fees shall be pro-rated based on the number of affordable units.”
Refund if withdrawnUp to 80% refunded if no work is doneCAC 109.7: “not more than 80 percent of the permit fee paid when no work has been done”, and the same cap on plan review fees where an application is withdrawn or cancelled before any plan review is done.
Refund if charged in error100% only if charged in errorCAC 109.7: “The Building Official may authorize full refund only if the fee was charged in error or the wrong type of permit was selected…”

Commercial Building Permit

Verified

Required for commercial construction, alteration, movement, enlargement, repair, change of use and demolition in Issaquah, under the 2021 International Building Code and the city's Construction Administrative Code.

Verified 2026-09-16 · Source

Requirements

  • “2021 International Building Code – Chapter 51-50 Washington Administrative Code” (CAC 101.2)
  • The 2021 International Existing Building Code is listed alongside it, also under Chapter 51-50 WAC
  • The IBC applies to “the construction, alteration, movement, enlargement, replacement, repair, equipment, use and occupancy, location, maintenance, removal, and demolition of every building or structure” (CAC 101.4.1)
  • Fees follow Table A on valuation, with inspection, plan review and related services added under Table D
  • Permits expire 2 years after issuance, extendable for phased work “due to the unique size and scope of project work” with a pre-approved construction schedule

Required documents

  • RequiredBuilding Permit ApplicationNot valid until fees are paid under CAC 109.1.
  • RequiredSubmittal Documents for Plan ReviewPer CAC Section 107; consultants may be used under CAC 107.3.1, in which case a plan review fee is payable at submittal.
  • RequiredContractor Code of Conduct AgreementRequired under IMC 16.01.060.

Fee schedule

Fee typeAmountNotes
Building permit (valuation-tiered)$33.26 minimum, tiered by valuation
ISSAQUAH ACTUALLY PUBLISHES THE NUMBERS — the first city in this Washington set to do so. Show full citation

ISSAQUAH ACTUALLY PUBLISHES THE NUMBERS — the first city in this Washington set to do so. Construction Administrative Code Section 109.2, Table A: “$1.00 to $500.00 — $33.26”; “$501.00 to $2,000.00 — $33.26 for the first $500.00 plus $4.16 for each additional $100.00, or fraction thereof”; then bases of $99.16 at $2,000, $558.75 at $25,000, $919.23 at $50,000, $1,418.35 at $100,000, $4,618.29 at $500,000 and $8,009.61 above $1,000,000, with marginal rates of $20.13, $14.61, $9.69, $8.00, $6.67 and $5.54 per $1,000. Fees are charged on VALUATION as determined under CAC 109.4. CONTINUITY CONTROL RUN ON TABLE A, AND IT FIRES AT 6 OF 7 BRACKET BOUNDARIES. Carrying each bracket's stated base plus its marginal rate across the bracket width does not reproduce the next bracket's stated base: at $2,000 the carry gives $95.66 against a stated $99.16 (+$3.50); at $25,000, $562.15 against $558.75 (-$3.40); at $50,000, $924.00 against $919.23 (-$4.77); at $100,000, $1,403.73 against $1,418.35 (+$14.62); at $500,000, $4,618.35 against $4,618.29 (-$0.06); at $1,000,000, $7,953.29 against $8,009.61 (+$56.32). Only the $500 boundary reconciles exactly. THIS IS NOT ASSERTED TO BE AN ERROR — the residuals run in both directions and are mostly small, which is what per-row derivation with independent rounding looks like rather than a drafting mistake. The practical consequence is the useful part: USE THE STATED BASE FOR YOUR OWN BRACKET AND DO NOT ACCUMULATE UP FROM A LOWER ONE, because the two methods disagree.

Plan reviewPaid at submittal; deposit allowedCAC 109.3: “a plan review fee shall be paid at the time of submitting the submittal documents for plan review. The Building Official has the option to charge a deposit, in lieu of the full plan review fee, if the full amount is not known at the time.”
Refund if withdrawnUp to 80% refunded if no work is doneCAC 109.7: “not more than 80 percent of the permit fee paid when no work has been done”, and the same cap on plan review fees where an application is withdrawn or cancelled before any plan review is done.
Refund if charged in error100% only if charged in errorCAC 109.7: “The Building Official may authorize full refund only if the fee was charged in error or the wrong type of permit was selected…”

Plumbing Permit

Verified

Plumbing work in Issaquah is reviewed under the 2021 Uniform Plumbing Code, with house plumbing fees set as a percentage of the building permit fee.

Verified 2026-09-16 · Source

Requirements

  • “2021 Uniform Plumbing Code – Chapter 51-56 WAC” (CAC 101.2)
  • Table B-1 governs one- and two-family dwellings and townhouses; Table B-2 governs commercial and multifamily and was NOT read for this entry
  • “Plumbing Permit Fee for new construction: An amount equal to 8% of the determined building permit” fee (Table B-1)
  • Additional inspection, plan review and related fees come from Table D

Required documents

  • RequiredPlumbing Permit ApplicationFiled under IMC Chapter 16.04; not valid until fees are paid (CAC 109.1).

Fee schedule

Fee typeAmountNotes
New construction (1-2 family)8% of the building permit feeTable B-1: “Plumbing Permit Fee for new construction — An amount equal to 8% of the determined building permit” fee, for one- and two-family dwellings and townhouses. Commercial and multifamily work uses Table B-2, which was not read for this entry.
Refund if withdrawnUp to 80% refunded if no work is doneCAC 109.7: “not more than 80 percent of the permit fee paid when no work has been done”, and the same cap on plan review fees where an application is withdrawn or cancelled before any plan review is done.
Refund if charged in error100% only if charged in errorCAC 109.7: “The Building Official may authorize full refund only if the fee was charged in error or the wrong type of permit was selected…”

Mechanical Permit

Verified

Mechanical and fuel gas work in Issaquah is reviewed under the 2021 International Mechanical Code together with the fuel gas codes named in the Construction Administrative Code.

Verified 2026-09-16 · Source

Requirements

  • “2021 International Mechanical Code – Chapter 51-52 WAC” (CAC 101.2)
  • “2021 National Fuel Gas Code (NFPA 54) – Chapter 51-52 WAC” and “2021 International Fuel Gas Code – Chapter 51-52 WAC”
  • “2020 Liquefied Petroleum Gas Code (NFPA 58) – Chapter 51-52 WAC” — the one document named at a 2020 edition
  • Each has its own adopting section: IMC 16.04.040, 16.04.050, 16.04.060 and 16.04.070

Required documents

  • RequiredMechanical Permit ApplicationFiled under IMC Chapter 16.04; not valid until fees are paid (CAC 109.1).

Fee schedule

Fee typeAmountNotes
Mechanical permitPer CAC Table A/D on valuation
CAC 109.2 charges mechanical permits through the city's published schedule: “For buildings, structures, gas, mechanical and plumbing systems, or alterations requiring a permit, a fee for each permit… Show full citation

CAC 109.2 charges mechanical permits through the city's published schedule: “For buildings, structures, gas, mechanical and plumbing systems, or alterations requiring a permit, a fee for each permit shall be paid as required, in accordance with the schedule as established by the City of Issaquah.” Additional inspection and plan review charges come from Table D, which was not read for this entry.

Refund if withdrawnUp to 80% refunded if no work is doneCAC 109.7: “not more than 80 percent of the permit fee paid when no work has been done”, and the same cap on plan review fees where an application is withdrawn or cancelled before any plan review is done.
Refund if charged in error100% only if charged in errorCAC 109.7: “The Building Official may authorize full refund only if the fee was charged in error or the wrong type of permit was selected…”

Electrical Permit

Verified

Issaquah's construction codes chapter adopts no electrical code, and its definition of the NEC is the only one that does not tie to a city adoption.

Verified 2026-09-16 · Source

Requirements

  • THE SECTION LIST OF IMC CHAPTER 16.04 CONTAINS NO ELECTRICAL ADOPTION SECTION — it runs Construction Administrative Code, IBC, IRC, IEBC, IMC, NFPA 54, NFPA 58, IFGC, UPC, energy code, IPMC, ISPSC, IWUIC Section 403.2.4, documents to be filed, and violation/penalty
  • CAC 101.2.1(11): “‘NEC’ means the latest edition of the National Electrical Code promulgated by the National Fire Protection Association.” — with no “as adopted by the City”, unlike every sibling definition
  • CAC 101.2 does not list an electrical code among the Applicable Codes
  • CONFIRM WITH THE CITY OR L&I which body issues electrical permits for your project; this entry does not establish it

Required documents

  • RequiredElectrical Permit ApplicationNOT ESTABLISHED FROM THE CODE. Chapter 16.04 adopts no electrical code and does not say who issues electrical permits; ask the city or the Washington State Department of Labor and Industries before filing.

Fee schedule

Fee typeAmountNotes
Electrical permitNot published in the code — ask cityNo electrical fee appears in IMC Chapter 16.04, which contains no electrical adoption section at all. The absence is bounded to that chapter's full section list, which contains no electrical section.

Expanded Work Hours Permit

Verified

Required to carry out construction outside Issaquah's default hours, which exclude weekends and legal holidays entirely.

Verified 2026-09-16 · Source

Requirements

  • Default hours are “only between the hours of 7:00 a.m. and 6:00 p.m. on weekdays, excluding weekdays that are legal holidays” (IMC 16.35.010(A))
  • Applies to building permits, utility permits, grading permits and land use certification permits alike
  • Approved by the City Development Services Director or the Director of Public Works Engineering “as determined by the Mayor”
  • Three application classes: Class 0 (minor work valued under $15,000), Class 1 (a single-family residence not part of a larger residential project), Class 2 (everything else)
  • “Approval may only be for specific dates and times and under terms that the approving official deems appropriate”
  • Regular municipal maintenance and operations activities not covered by a City permit are outside the chapter

Required documents

  • RequiredExpanded Work Hours Permit ApplicationFiled in the applicable class under IMC 16.35.005. The Development Services Director sets the review procedures and approval criteria, aimed at ensuring the hours “will not unreasonably disturb persons or property in the vicinity of the work”.

Fee schedule

Fee typeAmountNotes
Application feeSet in Land Use and Site Work ScheduleIMC 16.35.010(B): “The application fee established in the Land Use and Site Work Fee Schedule shall be paid for review and potential issuance of the expanded work hours permit.” That schedule is not part of the municipal code and no amount is published here.
After-hours inspectionMinimum charge applies after hoursIMC 16.35.020 is titled “Minimum inspection charges after hours.” The section was not opened for this entry, so the amount and its conditions are not stated here.

Sources & verification

Verified against official sources. Last reviewed 2026-09-16.

Department & other records

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Issaquah building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /washington/king-county/issaquah/as-of/2026-09-16/

Snapshot date: 2026-09-16

Commit: 95ce3d6

Reproducible from PermitBase’s version-controlled dataset, commit 95ce3d6.