Skip to main content
PermitBase

This is PermitBase’s published record for Seattle as of 2026-09-15. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Seattle building permits

Seattle, Washington — as published 2026-09-15.

Reviewed 2026-09-15 · Source

Codes adopted

2021 Seattle Building Code - SDCI publishes a read-only 2021 Seattle Building Code which contains substantial copyrighted material from the 2021 International Building Code. The 2018 Seattle Building Code is the prior cycle.2021 Seattle Residential Code - SDCI publishes a read-only 2021 Seattle Residential Code which contains substantial copyrighted material from the 2021 International Residential Code. The 2018 Seattle Residential Code is the prior cycle.2021 Seattle Energy Code - SDCI states it has adopted the 2021 Seattle Energy Codes and publishes a read-only 2021 Seattle Energy Code.Seattle Electrical Code - enforced by SDCI and listed on its Codes We Enforce (A-Z) page.Seattle Existing Building Code - listed on the Codes We Enforce (A-Z) page.Seattle Mechanical Code - listed on the Codes We Enforce (A-Z) page.Seattle Plumbing Code - listed on the Codes We Enforce (A-Z) page.Seattle Fire Code - listed on the Codes We Enforce (A-Z) page.Seattle Energy Code, Fuel Gas Code, Refrigeration Code, Elevator Code and Boiler & Pressure Vessel Code - each listed separately on the Codes We Enforce (A-Z) page.Seattle Land Use Code and Neighborhood Residential Code - the zoning instruments, listed separately from the construction codes.2026 Fee Subtitle - Seattle Municipal Code Chapter 22.900, effective January 1, 2026, setting fees for all SDCI services.

Permit types & fees

Construction Permit - Addition or Alteration

Required to add to or alter an existing building in Seattle. Listed by SDCI under Permits We Issue (A-Z) as "Construction Permit - Addition or Alteration".

Reviewed 2026-09-15 · Source

Requirements

  • A construction permit is required before beginning an addition or alteration
  • Work is reviewed against the 2021 Seattle Building Code or the 2021 Seattle Residential Code depending on the structure
  • Energy-code compliance is reviewed under the 2021 Seattle Energy Code

Required documents

  • Optional
  • Optional
  • Optional

Fee schedule

Fee typeAmountNotes

Construction Permit - Subject-to-Field-Inspection (STFI)

Seattle issues a Subject-to-Field-Inspection (STFI) construction permit for work that can be checked by an inspector in the field rather than through full plan review. It is the permit most small residential jobs in Seattle are issued under.

Reviewed 2026-09-15 · Source

Requirements

  • Issued for work SDCI can verify by field inspection rather than full plan review
  • Listed by SDCI under Permits We Issue (A-Z) as "Construction Permit - Subject-to-Field-Inspection"

Required documents

  • Optional
  • Optional

Fee schedule

Fee typeAmountNotes

Refrigeration Permit

Required for installation, addition, repair, replacement and alteration of refrigeration equipment and systems, under section 22.900D.100 of the 2026 Fee Subtitle.

Reviewed 2026-09-15 · Source

Requirements

  • A refrigeration permit is required for the installation, addition, repair, replacement and alteration of refrigeration equipment and systems

Required documents

  • Optional
  • Optional

Fee schedule

Fee typeAmountNotes

Demolition Permit - Building

Required to demolish a building in Seattle. Listed by SDCI under Permits We Issue (A-Z) as "Demolition Permit - Building".

Reviewed 2026-09-15 · Source

Requirements

  • A demolition permit is required before a building is demolished

Required documents

  • Optional

Fee schedule

Fee typeAmountNotes

Re-Roof Permit

Listed by SDCI under Permits We Issue (A-Z) as "Re-Roof Permit". Required for qualifying roof replacement work in Seattle.

Reviewed 2026-09-15 · Source

Requirements

  • A re-roof permit is required for qualifying roof replacement work

Required documents

  • Optional

Fee schedule

Fee typeAmountNotes

Electrical Permit

Listed by SDCI under Permits We Issue (A-Z) as "Electrical Permit". Seattle enforces its own Electrical Code, listed on the department's Codes We Enforce (A-Z) page.

Reviewed 2026-09-15 · Source

Requirements

  • An electrical permit is required for electrical work within Seattle

Required documents

  • Optional

Fee schedule

Fee typeAmountNotes

Mechanical Permit

Listed by SDCI under Permits We Issue (A-Z) as "Mechanical Permit".

Reviewed 2026-09-15 · Source

Requirements

  • A mechanical permit is required for mechanical work
  • May be submitted as part of a building permit application or separately

Required documents

  • Optional

Fee schedule

Fee typeAmountNotes

Tree Removal

Listed by SDCI under Permits We Issue (A-Z) as "Tree Removal". Seattle enforces a Trees & Codes regime listed on its Codes We Enforce (A-Z) page.

Reviewed 2026-09-15 · Source

Requirements

  • Tree removal is regulated by SDCI and may require authorisation before removal

Required documents

  • Optional

Fee schedule

Fee typeAmountNotes

Sources & verification

Key facts verified against official sources. Last reviewed 2026-09-15.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Seattle building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Later version (2026-09-16) →View current record →All versions →

Permalink: /washington/king-county/seattle/as-of/2026-09-15/

Snapshot date: 2026-09-15

Commit: e0dd4c6

Reproducible from PermitBase’s version-controlled dataset, commit e0dd4c6.