Refrigeration Permit — Seattle, Washington · Requirements sheet
Reviewed 2026-09-15 · Source: https://www.seattle.gov/construction-and-inspections/codes/codes-we-enforce-(a-z)/fees
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Refrigeration Permit in Seattle, Washington
Required for installation, addition, repair, replacement and alteration of refrigeration equipment and systems, under section 22.900D.100 of the 2026 Fee Subtitle.
Reviewed 2026-09-15 · Source
When you need this permit
- A refrigeration permit is required for the installation, addition, repair, replacement and alteration of refrigeration equipment and systems
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Charged from Table D-10 for 22.900D.100 of the 2026 Fee Subtitle: a basic fee of $42.50 plus an additional installation fee per compressor, $35.55 for 0-5 tons and $72.25 for 6-25 tons. Show full citationHide
Charged from Table D-10 for 22.900D.100 of the 2026 Fee Subtitle: a basic fee of $42.50 plus an additional installation fee per compressor, $35.55 for 0-5 tons and $72.25 for 6-25 tons. The Subtitle also provides that "Temporary installations of ten days' duration or less, made for the purposes of exhibition, display, or demonstration shall be charged a fee of $74.40 for each installation." A technology fee is added on top "in the amount of five percent of all fees or charges required under the above chapters".Review timeline
Inspection process
Tips
- Fees scale by compressor tonnage, so the system size decides the fee, not the project value
- Short exhibition or demonstration installs of ten days or less have their own flat fee
- Inspection of the installed refrigeration equipment
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-09-15.
Fee schedules
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Seattle building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Property Access
Seattle's permit history is searchable by address
192,660 permits in our copy of Seattle's register — searchable by street address, with permit type, status, issued date and valuation where the city publishes them. This is what we hold, not a statement of everything Seattle has issued.
140,002 of these 192,660 permits — 72.7% — carry an issued date, and those run from 1986 to 2026. The remaining 52,658 have no date at all.
Other permits in Seattle
Compare refrigeration permit fees across Washington →
Look up this fee in a different city →
Now live
Build your Seattle project checklist
Describe your project once and get every permit, document, and fee it triggers in Seattle — in one checklist. Free, for any city and any number of projects.
Get started →