You are viewing the permanent link for the record currently in effect, published 2026-09-16.

Shoreline building permits

Shoreline, Washington — as published 2026-09-16.

Reviewed 2026-09-16 · Source

Codes adopted

NO EDITION YEAR IS NAMED, BY DESIGN. SMC 15.05.010(A): "The current edition of the International Building Code, International Existing Building Code and International Swimming Pool and Spa Code, published by the International Code Council, Inc., as adopted by the Washington State Building Code Council in Chapter 51-50 WAC, as now or hereafter amended." Shoreline follows whatever the state has adopted, without re-enacting.THE SAME FOR RESIDENTIAL. SMC 15.05.010(B): "The current edition of the International Residential Code published by the International Code Council, Inc., as adopted by the Washington State Building Code Council in Chapter 51-51 WAC, as now or hereafter amended."IRC APPENDICES SPECIFICALLY ADOPTED: "Appendix A, Sizing and Capacities of Gas Piping"; "Appendix B, Sizing of Venting Systems Serving Appliances"; "Appendix H, Patio Covers"; and "Appendix Q, Tiny Houses, as adopted in WAC 51-51-60104." Appendix Q is in, as in Camas, Yakima and Sammamish - and not as in Marysville.Also adopted as current editions: the International Mechanical Code (Chapter 51-52 WAC), except that liquefied petroleum gas installations follow NFPA 58 and ANSI Z223.1/NFPA 54; the International Fuel Gas Code with Appendix A; and the International Fire Code.RCW 19.27 - the Washington State Building Code applies statewide.

Permit types & fees

Building Permit

Required for construction in Shoreline. The city adopts whatever edition the state has adopted, with no year named, and makes the signed permit card serve as the certificate of occupancy.

Reviewed 2026-09-16 · Source

Requirements

  • Built to the CURRENT edition of the IBC and IRC as adopted by the State Building Code Council, as now or hereafter amended
  • IRC Appendices A, B, H and Q (Tiny Houses) are specifically adopted
  • Automatic residential fire sprinklers are required in one- and two-family dwellings
  • A waste diversion plan is required before issuance for work over the thresholds
  • A waste diversion report is required before finalization or certificate of occupancy

Required documents

  • RequiredPermit application and plansApplication with plans; a plan review fee is payable and is partly refundable if the application is withdrawn before review begins.

Fee schedule

Fee typeAmountNotes
Permit fee (set by Chapter 3.01 SMC)Set by Chapter 3.01 SMC - see notes
SHORELINE DOES NOT PUBLISH PERMIT FEE AMOUNTS IN ITS BUILDING TITLE - THIS ENTRY DECLINES TO STATE A FIGURE RATHER THAN INVENT ONE. Show full citation

SHORELINE DOES NOT PUBLISH PERMIT FEE AMOUNTS IN ITS BUILDING TITLE - THIS ENTRY DECLINES TO STATE A FIGURE RATHER THAN INVENT ONE. SMC 15.05.020(A): "All city of Shoreline permit fees shall be established by Chapter 3.01 SMC." Chapter 3.01 is a different title of the same code and was not read for this entry. WHAT THIS CHAPTER DOES PUBLISH IS A REFUND SCHEDULE, WHICH FEW CITIES IN THIS SET DO. The city manager or designee may authorise refunding of "One hundred percent of any fee erroneously paid or collected"; "Up to 80 percent of the permit fee paid when no work has been done under a permit issued in accordance with this code"; and "Up to 80 percent of the plan review fee paid when an application for a permit for which a plan review fee has been paid is with-drawn or canceled before any plan reviewing is done". THERE IS A HARD DEADLINE AND IT IS EASY TO MISS: no refund may be authorised "except on written application filed by the original permittee not later than 180 days after the date of fee payment." The clock runs from PAYMENT, not from cancellation, and only the ORIGINAL PERMITTEE can file.

Demolition Permit

Required to remove or demolish a building in Shoreline, with four supporting reports and a financial security before issuance.

Reviewed 2026-09-16 · Source

Requirements

  • No removal or demolition of any building without a demolition permit, unless the structure is exempt from permit under the adopted codes
  • Documentation of rodent abatement
  • Documentation of compliance with the Puget Sound Clean Air Agency's asbestos/demolition notification requirements
  • A letter of compliance with the sewer district's requirements for demolition
  • A waste diversion plan where SMC 15.05.017 applies
  • A bond or other approved financial security before the permit issues

Required documents

  • RequiredRodent abatement documentationRequired with a demolition permit application (SMC 15.05.015).
  • RequiredPuget Sound Clean Air Agency asbestos/demolition notificationDocumentation of compliance with the agency's notification requirements - obtained from the agency, not the city.
  • RequiredSewer district letter of complianceLetter of compliance with the sewer district's requirements for demolition - obtained from the district, not the city.
  • RequiredWaste diversion planRequired where SMC 15.05.017 applies, identifying amount by weight and volume, the hauler and the receiving facility for each commodity.
  • RequiredBond or financial securityApproved by the city and in place before the demolition permit issues; level set by rule adopted by the building official.

Fee schedule

Fee typeAmountNotes
Permit fee (set by Chapter 3.01 SMC)Set by Chapter 3.01 SMC - see notes
SHORELINE DOES NOT PUBLISH PERMIT FEE AMOUNTS IN ITS BUILDING TITLE - THIS ENTRY DECLINES TO STATE A FIGURE RATHER THAN INVENT ONE. Show full citation

SHORELINE DOES NOT PUBLISH PERMIT FEE AMOUNTS IN ITS BUILDING TITLE - THIS ENTRY DECLINES TO STATE A FIGURE RATHER THAN INVENT ONE. SMC 15.05.020(A): "All city of Shoreline permit fees shall be established by Chapter 3.01 SMC." Chapter 3.01 is a different title of the same code and was not read for this entry. WHAT THIS CHAPTER DOES PUBLISH IS A REFUND SCHEDULE, WHICH FEW CITIES IN THIS SET DO. The city manager or designee may authorise refunding of "One hundred percent of any fee erroneously paid or collected"; "Up to 80 percent of the permit fee paid when no work has been done under a permit issued in accordance with this code"; and "Up to 80 percent of the plan review fee paid when an application for a permit for which a plan review fee has been paid is with-drawn or canceled before any plan reviewing is done". THERE IS A HARD DEADLINE AND IT IS EASY TO MISS: no refund may be authorised "except on written application filed by the original permittee not later than 180 days after the date of fee payment." The clock runs from PAYMENT, not from cancellation, and only the ORIGINAL PERMITTEE can file.

Verify a Contractor Licence

Washington contractors register with the Department of Labor & Industries. Registration is a STATE record; Shoreline does not issue it.

Reviewed 2026-09-16 · Source

Requirements

  • Check contractor registration with Washington State Labor & Industries

Required documents

  • OptionalNo city document requiredNo city document - check the state register.

Fee schedule

Fee typeAmountNotes
Permit fee (set by Chapter 3.01 SMC)Set by Chapter 3.01 SMC - see notes
SHORELINE DOES NOT PUBLISH PERMIT FEE AMOUNTS IN ITS BUILDING TITLE - THIS ENTRY DECLINES TO STATE A FIGURE RATHER THAN INVENT ONE. Show full citation

SHORELINE DOES NOT PUBLISH PERMIT FEE AMOUNTS IN ITS BUILDING TITLE - THIS ENTRY DECLINES TO STATE A FIGURE RATHER THAN INVENT ONE. SMC 15.05.020(A): "All city of Shoreline permit fees shall be established by Chapter 3.01 SMC." Chapter 3.01 is a different title of the same code and was not read for this entry. WHAT THIS CHAPTER DOES PUBLISH IS A REFUND SCHEDULE, WHICH FEW CITIES IN THIS SET DO. The city manager or designee may authorise refunding of "One hundred percent of any fee erroneously paid or collected"; "Up to 80 percent of the permit fee paid when no work has been done under a permit issued in accordance with this code"; and "Up to 80 percent of the plan review fee paid when an application for a permit for which a plan review fee has been paid is with-drawn or canceled before any plan reviewing is done". THERE IS A HARD DEADLINE AND IT IS EASY TO MISS: no refund may be authorised "except on written application filed by the original permittee not later than 180 days after the date of fee payment." The clock runs from PAYMENT, not from cancellation, and only the ORIGINAL PERMITTEE can file.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-09-16.

Department & other records

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Shoreline building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /washington/king-county/shoreline/as-of/2026-09-16/

Snapshot date: 2026-09-16

Commit: 6cf9cee

Reproducible from PermitBase’s version-controlled dataset, commit 6cf9cee.