Bonney Lake building permits

Verified

Bonney Lake, Washington — as published 2026-09-16.

Verified 2026-09-16 · Source

Codes adopted

THE ADOPTION NAMES NO EDITION YEAR FOR ANY CODE. BLMC 15.04.020 adopts every code “by this reference as if fully set forth”, “Pursuant to RCW 35A.12.140”, and none of the nine lettered items states a year.AND IT DELEGATES FUTURE EDITIONS TO A NAMED OFFICER, EXPRESSLY BYPASSING THE COUNCIL: “provided, that the community development director or building official at any time may adopt any subsequent or amended versions of the following codes without further action by the city council, such that the most current version of the regulations remains in effect”.IBC — BLMC 15.04.020(A): “The International Building Code, published by the International Code Council, is hereby adopted by reference with the exceptions noted in Chapter 51-50 WAC.”IRC — BLMC 15.04.020(B), adopted with the Chapter 51-51 WAC exceptions, “provided, that Chapters 11 and 25 through 43 of this code are not adopted”. Appendix F (Radon Control Methods), Appendix G (Swimming Pools, Spas and Hot Tubs), Appendix R (Dwelling Unit Fire Sprinkler Systems) and Appendix S (Fire Sprinklers) ARE included.IFC — BLMC 15.04.020(C), adopted with Appendix B (Fire-Flow Requirements for Buildings) and Appendix D (Fire Apparatus Access Roads) only, per Chapter 51-54A WAC.IECC — BLMC 15.04.020(D): “The International Energy Conservation Code, as amended by Chapters 51-11C and 51-11R WAC, is hereby adopted by reference.”IMC — BLMC 15.04.020(E), adopted by reference with the exceptions noted in Chapter 51-52 WAC.UPC — BLMC 15.04.020(F), adopted by reference. Washington is a Uniform Plumbing Code state.IEBC — BLMC 15.04.020(H), adopted by reference with no year.IFGC — BLMC 15.04.020(I), adopted by reference with the exceptions noted in Chapter 51-52 WAC.NO ELECTRICAL CODE IS ADOPTED. Chapter 15.04's nineteen sections were enumerated and none adopts the NEC or the Washington Cities Electrical Code, and the IRC's own electrical chapters (25 through 43) are among those expressly NOT adopted. No electrical route is asserted for this city.

Permit types & fees

Residential building permit

Verified

Permit to build, alter or add to a house in Bonney Lake, under the International Residential Code adopted at BLMC 15.04.020(B).

Verified 2026-09-16 · Source

Requirements

  • BLMC 15.04.020(B) adopts the International Residential Code by reference with the Chapter 51-51 WAC exceptions AND NAMES NO EDITION YEAR.
  • “Chapters 11 and 25 through 43 of this code are not adopted” — the IRC's energy chapter and its plumbing, mechanical and electrical chapters are excluded, so those subjects follow the IECC, UPC and IMC instead.
  • Appendix F (Radon Control Methods), Appendix G (Swimming Pools, Spas and Hot Tubs), Appendix R (Dwelling Unit Fire Sprinkler Systems) and Appendix S (Fire Sprinklers) are expressly included.
  • Design criteria are fixed by the table at BLMC 15.04.020(J), adopted “pursuant to Section R301.2 of the International Residential Code and ASCE 7-16”: 20 psf ground snow load, 85 mph wind speed with topographic effects, seismic design category D1, 12-inch frost line depth, winter design temperature 27, air freeze index 160.
  • PERMIT EXPIRY IS NOT IN THE BUILDING CHAPTER. BLMC 15.04.081 is repealed; BLMC 14.10.100 applies, and a permit expires two years after issuance if the use is not commenced or the construction permits are not issued.
  • Adding dwelling units to a building that has held a certificate of occupancy for at least three years may avoid current energy code on unchanged residential or conditioned portions, under BLMC 15.04.098(A)(1).

Required documents

  • RequiredPermit applicationBLMC 14.40.020 governs application forms and BLMC 14.40.030 the notice of complete application, which is the event that starts the review clock under BLMC 14.10.070.
  • OptionalConfirmation of the operative code editionNOT A CITY FORM, AND THE REASON IS SPECIFIC TO THIS CITY. BLMC 15.04.020 names no edition year and lets the community development director or building official adopt newer versions without council action, so the edition in force is a question for staff rather than a fact in the code.
  • OptionalFee schedule resolutionBLMC 3.68.030: fees “shall be set by resolution of the city council”. The amounts are not in the municipal code and the building chapter's own fee sections were repealed by Ord. 1598.

Fee schedule

Fee typeAmountNotes
Permit feeSet by city council resolution
No dollar figure is published in the code, AND THE FEE SECTIONS IN THE BUILDING CHAPTER NO LONGER EXIST. Show full citation

No dollar figure is published in the code, AND THE FEE SECTIONS IN THE BUILDING CHAPTER NO LONGER EXIST. BLMC 15.04.072 “Building permit – Fees” and 15.04.080 “Building plan review – Fees” both read “Repealed by Ord. 1598.” Fees moved to BLMC Chapter 3.68 in the revenue title, where 3.68.030 provides that fees “shall be set by resolution of the city council”. REFUNDS ARE DISCRETIONARY AND EFFORT-BASED: BLMC 3.68.020 lets the director refund “not more than 80 percent of the building permit fee paid when no work has been done”, and not more than 80 percent where an application is withdrawn before approval, with “the amount of the refund … based on the amount of effort expended by the city”. Ask the city for the current resolution.

Commercial building permit

Verified

Permit for commercial and multifamily construction and alteration in Bonney Lake, under the International Building Code adopted at BLMC 15.04.020(A).

Verified 2026-09-16 · Source

Requirements

  • BLMC 15.04.020(A): “The International Building Code, published by the International Code Council, is hereby adopted by reference with the exceptions noted in Chapter 51-50 WAC.” No edition year is stated.
  • The International Existing Building Code is adopted at BLMC 15.04.020(H), also with no year, for work in existing buildings.
  • The International Fire Code is adopted at BLMC 15.04.020(C) with only Appendix B (Fire-Flow Requirements for Buildings) and Appendix D (Fire Apparatus Access Roads).
  • THE PROJECT PERMIT AND THE CONSTRUCTION PERMIT ARE LINKED. Under BLMC 14.10.100, once construction permits issue the underlying project permit's expiration is tied to theirs, and if the construction permit expires the project permit approval “shall become null and void”.
  • BLMC 15.04.110 makes it unlawful to “erect, construct, enlarge, alter, repair, move, improve, remove, convert, demolish, equip, use, occupy or maintain any building or structure” contrary to the chapter or any code adopted by it.

Required documents

  • RequiredPermit applicationBLMC 14.40.020 governs application forms and BLMC 14.40.030 the notice of complete application, which is the event that starts the review clock under BLMC 14.10.070.
  • OptionalConfirmation of the operative code editionNOT A CITY FORM, AND THE REASON IS SPECIFIC TO THIS CITY. BLMC 15.04.020 names no edition year and lets the community development director or building official adopt newer versions without council action, so the edition in force is a question for staff rather than a fact in the code.
  • OptionalFee schedule resolutionBLMC 3.68.030: fees “shall be set by resolution of the city council”. The amounts are not in the municipal code and the building chapter's own fee sections were repealed by Ord. 1598.

Fee schedule

Fee typeAmountNotes
Permit feeSet by city council resolution
No dollar figure is published in the code, AND THE FEE SECTIONS IN THE BUILDING CHAPTER NO LONGER EXIST. Show full citation

No dollar figure is published in the code, AND THE FEE SECTIONS IN THE BUILDING CHAPTER NO LONGER EXIST. BLMC 15.04.072 “Building permit – Fees” and 15.04.080 “Building plan review – Fees” both read “Repealed by Ord. 1598.” Fees moved to BLMC Chapter 3.68 in the revenue title, where 3.68.030 provides that fees “shall be set by resolution of the city council”. REFUNDS ARE DISCRETIONARY AND EFFORT-BASED: BLMC 3.68.020 lets the director refund “not more than 80 percent of the building permit fee paid when no work has been done”, and not more than 80 percent where an application is withdrawn before approval, with “the amount of the refund … based on the amount of effort expended by the city”. Ask the city for the current resolution.

Mechanical permit

Verified

Permit for mechanical work in Bonney Lake, under the International Mechanical Code adopted at BLMC 15.04.020(E).

Verified 2026-09-16 · Source

Requirements

  • BLMC 15.04.020(E): the International Mechanical Code “is hereby adopted by reference with the exceptions noted in Chapter 51-52 WAC”, with no edition year stated.
  • The IMC governs residential mechanical work too, because BLMC 15.04.020(B) does not adopt IRC Chapters 25 through 43.
  • BLMC 15.04.110 makes it unlawful to equip or alter a building contrary to any code adopted by the chapter.

Required documents

  • RequiredPermit applicationBLMC 14.40.020 governs application forms and BLMC 14.40.030 the notice of complete application, which is the event that starts the review clock under BLMC 14.10.070.
  • OptionalConfirmation of the operative code editionNOT A CITY FORM, AND THE REASON IS SPECIFIC TO THIS CITY. BLMC 15.04.020 names no edition year and lets the community development director or building official adopt newer versions without council action, so the edition in force is a question for staff rather than a fact in the code.
  • OptionalFee schedule resolutionBLMC 3.68.030: fees “shall be set by resolution of the city council”. The amounts are not in the municipal code and the building chapter's own fee sections were repealed by Ord. 1598.

Fee schedule

Fee typeAmountNotes
Permit feeSet by city council resolution
No dollar figure is published in the code, AND THE FEE SECTIONS IN THE BUILDING CHAPTER NO LONGER EXIST. Show full citation

No dollar figure is published in the code, AND THE FEE SECTIONS IN THE BUILDING CHAPTER NO LONGER EXIST. BLMC 15.04.072 “Building permit – Fees” and 15.04.080 “Building plan review – Fees” both read “Repealed by Ord. 1598.” Fees moved to BLMC Chapter 3.68 in the revenue title, where 3.68.030 provides that fees “shall be set by resolution of the city council”. REFUNDS ARE DISCRETIONARY AND EFFORT-BASED: BLMC 3.68.020 lets the director refund “not more than 80 percent of the building permit fee paid when no work has been done”, and not more than 80 percent where an application is withdrawn before approval, with “the amount of the refund … based on the amount of effort expended by the city”. Ask the city for the current resolution.

Plumbing permit

Verified

Permit for plumbing work in Bonney Lake, under the Uniform Plumbing Code adopted at BLMC 15.04.020(F).

Verified 2026-09-16 · Source

Requirements

  • BLMC 15.04.020(F) adopts the Uniform Plumbing Code by reference, with no edition year stated. Washington is a Uniform Plumbing Code state rather than an International Plumbing Code state.
  • The UPC governs residential plumbing here, because IRC Chapters 25 through 43 are expressly not adopted by BLMC 15.04.020(B).
  • Permit expiry follows BLMC 14.10.100 rather than the repealed BLMC 15.04.081.

Required documents

  • RequiredPermit applicationBLMC 14.40.020 governs application forms and BLMC 14.40.030 the notice of complete application, which is the event that starts the review clock under BLMC 14.10.070.
  • OptionalConfirmation of the operative code editionNOT A CITY FORM, AND THE REASON IS SPECIFIC TO THIS CITY. BLMC 15.04.020 names no edition year and lets the community development director or building official adopt newer versions without council action, so the edition in force is a question for staff rather than a fact in the code.
  • OptionalFee schedule resolutionBLMC 3.68.030: fees “shall be set by resolution of the city council”. The amounts are not in the municipal code and the building chapter's own fee sections were repealed by Ord. 1598.

Fee schedule

Fee typeAmountNotes
Permit feeSet by city council resolution
No dollar figure is published in the code, AND THE FEE SECTIONS IN THE BUILDING CHAPTER NO LONGER EXIST. Show full citation

No dollar figure is published in the code, AND THE FEE SECTIONS IN THE BUILDING CHAPTER NO LONGER EXIST. BLMC 15.04.072 “Building permit – Fees” and 15.04.080 “Building plan review – Fees” both read “Repealed by Ord. 1598.” Fees moved to BLMC Chapter 3.68 in the revenue title, where 3.68.030 provides that fees “shall be set by resolution of the city council”. REFUNDS ARE DISCRETIONARY AND EFFORT-BASED: BLMC 3.68.020 lets the director refund “not more than 80 percent of the building permit fee paid when no work has been done”, and not more than 80 percent where an application is withdrawn before approval, with “the amount of the refund … based on the amount of effort expended by the city”. Ask the city for the current resolution.

Fuel gas permit

Verified

Permit for fuel gas piping and appliance work in Bonney Lake, under the International Fuel Gas Code adopted at BLMC 15.04.020(I).

Verified 2026-09-16 · Source

Requirements

  • BLMC 15.04.020(I): the International Fuel Gas Code “is hereby adopted by reference with the exceptions noted in Chapter 51-52 WAC”, with no edition year stated.
  • NO NFPA STANDARD IS ADOPTED BY NAME OR YEAR. Unlike Kenmore, Mercer Island and Tumwater, which each name NFPA 54 and or NFPA 58 with an edition, Chapter 15.04 names neither, so no NFPA year is claimed for this city.
  • Gas work is covered by BLMC 15.04.110's prohibition on equipping or altering a building contrary to an adopted code.

Required documents

  • RequiredPermit applicationBLMC 14.40.020 governs application forms and BLMC 14.40.030 the notice of complete application, which is the event that starts the review clock under BLMC 14.10.070.
  • OptionalConfirmation of the operative code editionNOT A CITY FORM, AND THE REASON IS SPECIFIC TO THIS CITY. BLMC 15.04.020 names no edition year and lets the community development director or building official adopt newer versions without council action, so the edition in force is a question for staff rather than a fact in the code.
  • OptionalFee schedule resolutionBLMC 3.68.030: fees “shall be set by resolution of the city council”. The amounts are not in the municipal code and the building chapter's own fee sections were repealed by Ord. 1598.

Fee schedule

Fee typeAmountNotes
Permit feeSet by city council resolution
No dollar figure is published in the code, AND THE FEE SECTIONS IN THE BUILDING CHAPTER NO LONGER EXIST. Show full citation

No dollar figure is published in the code, AND THE FEE SECTIONS IN THE BUILDING CHAPTER NO LONGER EXIST. BLMC 15.04.072 “Building permit – Fees” and 15.04.080 “Building plan review – Fees” both read “Repealed by Ord. 1598.” Fees moved to BLMC Chapter 3.68 in the revenue title, where 3.68.030 provides that fees “shall be set by resolution of the city council”. REFUNDS ARE DISCRETIONARY AND EFFORT-BASED: BLMC 3.68.020 lets the director refund “not more than 80 percent of the building permit fee paid when no work has been done”, and not more than 80 percent where an application is withdrawn before approval, with “the amount of the refund … based on the amount of effort expended by the city”. Ask the city for the current resolution.

Sources & verification

Verified against official sources. Last reviewed 2026-09-16.

Department & other records

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bonney Lake building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →