Lake Stevens building permits

Verified

Lake Stevens, Washington — as published 2026-09-16.

Verified 2026-09-16 · Source

Codes adopted

EDITIONS ARE NAMED HERE — 2021 THROUGHOUT. LSMC 14.80.010 opens: “The below-listed model codes, as approved, adopted and amended by the State Building Code Council (SBCC) are hereby adopted by this reference. These codes shall apply to all new construction, remodeling, or repairs. Copies of the codes are on file in the office of the Building Official.”IBC — “The 2021 Edition of the International Building Code (IBC) including Appendix E, and the adoption of ICC/ANSI A117.1-2017, Requirements for Accessible and Useable Buildings and Facilities, as adopted and amended by the State Building Code Council in Chapter 51-50 WAC…”IEBC — “The 2021 International Existing Building Code (IEBC) is included in the adoption of the International Building Code as provided by IBC Section 101.4.7 as adopted and amended by the State Building Code Council.”IRC — “The 2021 Edition of the International Residential Code … provided, that Chapters 11 and 25 through 43 of this code are not adopted. Energy Code is regulated by Chapter 51-11R WAC; Plumbing Code is regulated by Chapter 51-56 WAC; Electrical Code is regulated by Chapter 296-46B WAC or Electrical Code as adopted by the local jurisdiction. Appendix F, Radon Control Methods, and Appendix Q, Tiny Homes, are included in adoption of the International Residential Code.”UPC — “2021 Edition of the Uniform Plumbing Code, including Appendices A, B and I … provided, that Chapters 12 and 15 of this code are not adopted; provided further, that those requirements relating to venting and combustion air of fuel-fired appliances as found in Chapter 5 and portions of the code addressing building sewers are not adopted (WAC 51-56-003).”IMC — “2021 Edition of the International Mechanical Code published by the International Code Council, including 2021 International Fuel Gas Code, 2020 National Fire Protection Association (NFPA) 58 (Liquefied Petroleum Gas Code) and 2021 NFPA 54 (National Fuel Gas Code) with exceptions noted in WAC 51-52-003.” NOTE THE THREE DIFFERENT YEARS IN ONE SENTENCE: the IMC and IFGC are 2021, NFPA 58 is 2020, NFPA 54 is 2021. These are real edition years of four different documents, not a typo.ENERGY — “2021 International Energy Conservation Code of the State of Washington regulated by Chapters 51-11C and 51-11R WAC.”IPMC — “The 2021 Edition of the International Property Maintenance Code (IPMC), including Sections 107.4 and 107.6 (IPMC) … Provided, Sections 103.5, 106, 111, and 112 are not adopted.” The code then re-routes each excluded section to LSMC Chapter 17.20.ISPSC — “The 2021 International Swimming Pool and Spa Code (ISPSC) is included in the adoption of the International Building Code as provided by IBC Section 3109.1 and amended in WAC 51-50-3109, and as provided by IRC Section R328 and amended in WAC 51-51-0328.” Adopted THROUGH the IBC and IRC rather than as a standalone chapter.WUI — A NAMED EDITION WITH A DELEGATED OVERRIDE, WHICH IS A SHAPE OF ITS OWN. “The 2021 International Wildland-Urban Interface Code (WUI) as published by the International Code Council adopted and amended by the State Building Code Council in Chapter 51-55 WAC; provided, that it includes adoption of Appendix B as Chapter 7, Appendix C as Chapter 8, Appendix D as Chapter 9 and re-numbers referenced standard as Chapter 10.” Then: “Exception: If State Building Code Council votes to change or not adopt and or delay the implementation of 2021 WUI code or portion thereof then delay, not adopt and/or delay implementation in accordance with State Building Code Council.” The year is named AND contingent on the state — neither purely named-and-static nor purely delegated.NOT OPENED FOR THIS ENTRY and therefore not asserted: LSMC Chapter 14.84 (Fire Code, which carries the sprinkler and address-identification provisions this chapter points to), 14.64 (Special Flood Hazard Areas), 14.50 (Land Disturbance), 14.52 (Fences, Hedges and Walls), 14.68 (Signs), 14.60 (Utilities), 14.124 (Deferred Collection of Impact Fees for Residential Construction), 14.112 and 14.120 (impact fees), and Title 17 (Uniform Enforcement Code).

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new one- and two-family dwellings and townhouses in Lake Stevens, reviewed under the 2021 International Residential Code as adopted and amended by the Washington State Building Code Council.

Verified 2026-09-16 · Source

Requirements

  • “The 2021 Edition of the International Residential Code … provided, that Chapters 11 and 25 through 43 of this code are not adopted” (LSMC 14.80.010); Appendix F (Radon Control Methods) and Appendix Q (Tiny Homes) ARE included
  • A permit is required to construct, enlarge, alter, move, demolish “or change occupancy” (LSMC 14.80.030(a))
  • A sewage disposal permit under Chapter 14.60 must be secured BEFORE the building permit issues (LSMC 14.80.050)
  • Design to the local table at LSMC 14.80.010: snow load 25, wind 110 mph, Seismic Design Category D2, frost line depth 12 inches, outdoor design temp 23/79
  • The permit expires if work has not begun within 180 days of issuance; “one or more 180-day extensions” are available for justifiable cause (LSMC 14.80.030(c)-(d))

Required documents

  • RequiredBuilding Permit Application with Scaled PlansLSMC 14.80.030(b) requires plans “drawn to scale, showing the actual dimensions and shape of the lot to be built upon; the exact sizes and locations of existing buildings on the lot, if any; and the location and dimensions of the proposed building or alteration.” The Building Official retains the plans for 180 days.
  • RequiredSewage Disposal PermitA precondition, not a parallel step: no building permit for a primary use structure issues until this is secured under Chapter 14.60 (Utilities).
  • RequiredEnergy Code Compliance DocumentationIRC Chapter 11 is not adopted; energy is regulated by Chapter 51-11R WAC under the 2021 IECC (LSMC 14.80.010).

Fee schedule

Fee typeAmountNotes
Permit feeSet by city council resolution
LSMC 14.80.040: “The City shall collect fees for all services rendered and activities performed in reviewing and issuing building permits. Show full citation

LSMC 14.80.040: “The City shall collect fees for all services rendered and activities performed in reviewing and issuing building permits. Said fees shall be set by resolution.” No dollar amount appears in the code and none is asserted here. Across this Washington set the INSTRUMENT varies and is worth knowing: Edmonds and Lake Stevens use a council RESOLUTION, Lynnwood a fee ORDINANCE, and Puyallup an EXECUTIVE ORDER of the city manager. Ask the city for the current resolution.

Appeal feeSet by resolution; due with the appealLSMC 14.80.030(e)(3): “The written appeal and the appeal fee, if any, must be received by the Department of Planning and Community Development no later than 4:00 p.m. on the fourteenth day following the date of the notice of decision.” The code says “if any” and states no amount.

Commercial Building Permit

Verified

Required for commercial construction, alterations, additions and changes of occupancy in Lake Stevens, under the 2021 International Building Code as adopted and amended by the State Building Code Council.

Verified 2026-09-16 · Source

Requirements

  • “The 2021 Edition of the International Building Code (IBC) including Appendix E, and the adoption of ICC/ANSI A117.1-2017 … in Chapter 51-50 WAC” (LSMC 14.80.010)
  • The 2021 IEBC comes in with it via IBC Section 101.4.7
  • Address identification must comply with LSMC 14.84.190, except for Group R-3 occupancies, townhomes and one- and two-family dwellings
  • Automatic sprinkler systems must also comply with LSMC 14.84.150 (IBC Section 903 addition)
  • A certificate of occupancy requires acceptance by the Planning AND Public Works Departments (LSMC 14.80.110)

Required documents

  • RequiredBuilding Permit Application with Scaled PlansPer LSMC 14.80.030(b), including uses of building and land and the number of units the building is designed to accommodate.
  • RequiredSewage Disposal PermitRequired before a building permit for a primary use structure issues (LSMC 14.80.050).
  • OptionalAccessibility DocumentationThe city adopts ICC/ANSI A117.1-2017 alongside the IBC and takes IBC Appendix E (LSMC 14.80.010).

Fee schedule

Fee typeAmountNotes
Permit feeSet by city council resolution
LSMC 14.80.040: “The City shall collect fees for all services rendered and activities performed in reviewing and issuing building permits. Show full citation

LSMC 14.80.040: “The City shall collect fees for all services rendered and activities performed in reviewing and issuing building permits. Said fees shall be set by resolution.” No dollar amount appears in the code and none is asserted here. Across this Washington set the INSTRUMENT varies and is worth knowing: Edmonds and Lake Stevens use a council RESOLUTION, Lynnwood a fee ORDINANCE, and Puyallup an EXECUTIVE ORDER of the city manager. Ask the city for the current resolution.

Appeal feeSet by resolution; due with the appealLSMC 14.80.030(e)(3): “The written appeal and the appeal fee, if any, must be received by the Department of Planning and Community Development no later than 4:00 p.m. on the fourteenth day following the date of the notice of decision.” The code says “if any” and states no amount.

Plumbing Permit

Verified

Plumbing work in Lake Stevens is reviewed under the 2021 Uniform Plumbing Code as amended by the Washington State Building Code Council, with several parts expressly excluded.

Verified 2026-09-16 · Source

Requirements

  • “2021 Edition of the Uniform Plumbing Code, including Appendices A, B and I … with additions, deletions and exceptions noted in Chapter 51-56 WAC” (LSMC 14.80.010)
  • “Chapters 12 and 15 of this code are not adopted”
  • Requirements “relating to venting and combustion air of fuel-fired appliances as found in Chapter 5 and portions of the code addressing building sewers are not adopted (WAC 51-56-003)”
  • IRC Chapters 25 through 43 are not adopted, so residential plumbing is reviewed here

Required documents

  • RequiredPlumbing Permit ApplicationFiled with the Building Official under LSMC Chapter 14.80.
  • OptionalSewage Disposal PermitSeparate from the plumbing permit and a precondition of any primary-structure building permit (LSMC 14.80.050, Chapter 14.60).

Fee schedule

Fee typeAmountNotes
Permit feeSet by city council resolution
LSMC 14.80.040: “The City shall collect fees for all services rendered and activities performed in reviewing and issuing building permits. Show full citation

LSMC 14.80.040: “The City shall collect fees for all services rendered and activities performed in reviewing and issuing building permits. Said fees shall be set by resolution.” No dollar amount appears in the code and none is asserted here. Across this Washington set the INSTRUMENT varies and is worth knowing: Edmonds and Lake Stevens use a council RESOLUTION, Lynnwood a fee ORDINANCE, and Puyallup an EXECUTIVE ORDER of the city manager. Ask the city for the current resolution.

Appeal feeSet by resolution; due with the appealLSMC 14.80.030(e)(3): “The written appeal and the appeal fee, if any, must be received by the Department of Planning and Community Development no later than 4:00 p.m. on the fourteenth day following the date of the notice of decision.” The code says “if any” and states no amount.

Mechanical Permit

Verified

Mechanical and fuel gas work in Lake Stevens is reviewed under the 2021 International Mechanical Code together with the 2021 IFGC and named NFPA standards.

Verified 2026-09-16 · Source

Requirements

  • “2021 Edition of the International Mechanical Code … including 2021 International Fuel Gas Code, 2020 National Fire Protection Association (NFPA) 58 (Liquefied Petroleum Gas Code) and 2021 NFPA 54 (National Fuel Gas Code) with exceptions noted in WAC 51-52-003” (LSMC 14.80.010)
  • FOUR EDITION YEARS APPEAR IN THAT ONE SENTENCE and they are not all the same: IMC 2021, IFGC 2021, NFPA 58 2020, NFPA 54 2021
  • UPC Chapter 5 venting and combustion air requirements for fuel-fired appliances are NOT adopted, so those come through the mechanical side

Required documents

  • RequiredMechanical Permit ApplicationFiled with the Building Official under LSMC Chapter 14.80.

Fee schedule

Fee typeAmountNotes
Permit feeSet by city council resolution
LSMC 14.80.040: “The City shall collect fees for all services rendered and activities performed in reviewing and issuing building permits. Show full citation

LSMC 14.80.040: “The City shall collect fees for all services rendered and activities performed in reviewing and issuing building permits. Said fees shall be set by resolution.” No dollar amount appears in the code and none is asserted here. Across this Washington set the INSTRUMENT varies and is worth knowing: Edmonds and Lake Stevens use a council RESOLUTION, Lynnwood a fee ORDINANCE, and Puyallup an EXECUTIVE ORDER of the city manager. Ask the city for the current resolution.

Appeal feeSet by resolution; due with the appealLSMC 14.80.030(e)(3): “The written appeal and the appeal fee, if any, must be received by the Department of Planning and Community Development no later than 4:00 p.m. on the fourteenth day following the date of the notice of decision.” The code says “if any” and states no amount.

Electrical Permit

Verified

Electrical work in Lake Stevens follows the electrical code as regulated by Chapter 296-46B WAC — the Department of Labor and Industries rule — rather than a city-named edition.

Verified 2026-09-16 · Source

Requirements

  • “Electrical Code is regulated by Chapter 296-46B WAC or Electrical Code as adopted by the local jurisdiction” (LSMC 14.80.010, within the IRC adoption)
  • IRC Chapters 25 through 43 are not adopted, so residential electrical work is routed out of the IRC
  • The city names no NEC edition year in Chapter 14.80

Required documents

  • RequiredElectrical Permit ApplicationConfirm with the city or with L&I which body issues for your project — LSMC 14.80.010 points to Chapter 296-46B WAC “or Electrical Code as adopted by the local jurisdiction” without resolving which applies.

Fee schedule

Fee typeAmountNotes
Permit feeSet by city council resolution
LSMC 14.80.040: “The City shall collect fees for all services rendered and activities performed in reviewing and issuing building permits. Show full citation

LSMC 14.80.040: “The City shall collect fees for all services rendered and activities performed in reviewing and issuing building permits. Said fees shall be set by resolution.” No dollar amount appears in the code and none is asserted here. Across this Washington set the INSTRUMENT varies and is worth knowing: Edmonds and Lake Stevens use a council RESOLUTION, Lynnwood a fee ORDINANCE, and Puyallup an EXECUTIVE ORDER of the city manager. Ask the city for the current resolution.

Appeal feeSet by resolution; due with the appealLSMC 14.80.030(e)(3): “The written appeal and the appeal fee, if any, must be received by the Department of Planning and Community Development no later than 4:00 p.m. on the fourteenth day following the date of the notice of decision.” The code says “if any” and states no amount.

Dock and Over-Water Structure Permit

Verified

Lake Stevens expressly requires a building permit for docks, bridges and other over-water structures — a distinct requirement for a city built around a lake.

Verified 2026-09-16 · Source

Requirements

  • “Building permits shall be required for all docks, bridges or other over-water structures and shall comply with the regulations of this title.” (LSMC 14.80.080)
  • “This title” is Title 14, the Land Use Code, so shoreline, critical-areas and dimensional provisions elsewhere in Title 14 apply as well
  • LSMC Chapter 14.92 (Shoreline Management) and Chapter 14.88 (Critical Areas) are likely to apply and were NOT opened for this entry

Required documents

  • RequiredBuilding Permit ApplicationFiled under LSMC Chapter 14.80 as for any other structure.
  • OptionalShoreline and Critical Areas Review MaterialsNOT ESTABLISHED FROM THE CODE for this entry — LSMC Chapters 14.92 and 14.88 were not opened. Listed because LSMC 14.80.080 requires compliance with “the regulations of this title” and those chapters sit within it. Confirm with the city.

Fee schedule

Fee typeAmountNotes
Permit feeSet by city council resolution
LSMC 14.80.040: “The City shall collect fees for all services rendered and activities performed in reviewing and issuing building permits. Show full citation

LSMC 14.80.040: “The City shall collect fees for all services rendered and activities performed in reviewing and issuing building permits. Said fees shall be set by resolution.” No dollar amount appears in the code and none is asserted here. Across this Washington set the INSTRUMENT varies and is worth knowing: Edmonds and Lake Stevens use a council RESOLUTION, Lynnwood a fee ORDINANCE, and Puyallup an EXECUTIVE ORDER of the city manager. Ask the city for the current resolution.

Appeal feeSet by resolution; due with the appealLSMC 14.80.030(e)(3): “The written appeal and the appeal fee, if any, must be received by the Department of Planning and Community Development no later than 4:00 p.m. on the fourteenth day following the date of the notice of decision.” The code says “if any” and states no amount.

Sources & verification

Verified against official sources. Last reviewed 2026-09-16.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lake Stevens building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /washington/snohomish-county/lake-stevens/as-of/2026-09-16/

Snapshot date: 2026-09-16

Commit: 0f10392

Reproducible from PermitBase’s version-controlled dataset, commit 0f10392.