Skip to main content
PermitBase

You are viewing the permanent link for the record currently in effect, published 2026-09-16.

Mountlake Terrace building permits

Verified

Mountlake Terrace, Washington — as published 2026-09-16.

Verified 2026-09-16 · Source

Codes adopted

IBC — MTMC 15.05.030(A): “International Building Code, 2021 Edition, published by the International Code Council, with state of Washington amendments”. Its own adopting section, 15.05.040, also names 2021.IRC — MTMC 15.05.030(B): “International Residential Code, 2021 Edition, published by the International Code Council, with state of Washington amendments”. Its own adopting section, 15.05.060, also names 2021.IMC — MTMC 15.05.030(C): “International Mechanical Code, 2021 Edition, published by the International Code Council, with state of Washington amendments”. 15.05.080 agrees.IFC — MTMC 15.05.030(D) names the 2021 Edition “as adopted in Chapter 15.10 MTMC”, and 15.10.010 independently names “The International Fire Code (‘IFC’), 2021 Edition, as published by the ICC, together with any additions, deletions and exceptions currently enacted or as may be amended from time to time by the state of Washington, as set forth in Chapter 51-54A WAC”. The two agree.UPC — MTMC 15.05.030(E): “Uniform Plumbing Code, 2021 Edition, with state of Washington amendments, and Uniform Plumbing Code Standards, published by the International Association of Plumbing and Mechanical Officials”. 15.05.090 agrees.International Performance Code for Buildings and Facilities — MTMC 15.05.030(F), 2021 Edition. 15.05.100 agrees.International Green Construction Code — MTMC 15.05.030(G) lists it at the 2021 Edition, BUT ITS OWN ADOPTING SECTION, 15.05.110, READS “Reserved.” A code reviser's note records that Ordinance 2621 removed the Uniform Housing Code provisions and reserved the section for the IGCC. The list names it; the section is empty.IFGC — MTMC 15.05.030(H): “International Fuel Gas Code, 2021 Edition, published by the International Code Council, with state of Washington amendments”. 15.05.120 agrees.Electrical — MTMC 15.05.030(I) adopts TWO codes at TWO YEARS in one lettered item: “National Electrical Code, 2023 Edition, published by the National Fire Protection Association; and the Washington Cities Electrical Code, 2020 Edition, published by Washington Association of Building Officials”. 15.05.130 adds a third instrument, the state “Department of Labor and Industries, Electrical Inspection Section, Rules and Regulations for Installing Electric Wiring and Equipment”.IECC — MTMC 15.05.030(J), 2021 Edition.IEBC — MTMC 15.05.030(K), 2021 Edition. 15.05.155 agrees.Accessibility — MTMC 15.05.030(L): “Washington State accessibility provisions for physically disabled or elderly persons as provided in RCW 70.92.100 through 70.92.160”. No edition year, because the instrument is a statute.Uniform Code for Abatement of Dangerous Buildings — MTMC 15.05.030(M), “1997 Edition, published by the International Conference of Building Officials”. THE OLDEST EDITION YEAR ANY CITY IN THIS WASHINGTON SERIES NAMES.IPMC — MTMC 15.05.030(N), 2021 Edition.WSEC — MTMC 15.05.030(O) says “Washington State Energy Code (Commercial and Residential), 2021 Editions”, BUT 15.05.160 says “the Washington State Energy Code, 2018 Edition, with any amendments established by Chapters 51-11C and 51-11R WAC, as now exist or shall be amended”. BOTH ARE RECORDED AND NEITHER IS ADJUDICATED.

Permit types & fees

Residential building permit

Verified

Permit to build, alter, add to or change the occupancy of a house in Mountlake Terrace, under the International Residential Code adopted at MTMC 15.05.060.

Verified 2026-09-16 · Source

Requirements

  • MTMC 15.05.030(B) adopts the “International Residential Code, 2021 Edition, published by the International Code Council, with state of Washington amendments”, and MTMC 15.05.060 adopts the same year.
  • MTMC 15.05.210 requires a permit before you “construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure”, and makes all such work “subject to inspection by the City”.
  • The IRC keeps its own exemption list here; MTMC 15.05.070(B) changes only item 5, to “Sidewalks and driveways, except for required civil permits.”
  • One-family dwellings of 3,000 square feet or greater must meet IRC Appendix S for residential fire sprinklers, inserted by MTMC 15.05.070(D) via WAC 51-51-60107.
  • In the TC zoning districts, additions, improvements, alterations or repairs exceeding 50 percent of assessed value IN ANY FIVE-YEAR PERIOD bring the whole building up to IRC new-building safety requirements (MTMC 15.05.070(C)).
  • Design criteria are fixed locally by the Table R301.2(1) inserted at MTMC 15.05.070(A): 25 lbs./sq. foot ground snow load, 85 mph wind, seismic D2, 12-inch frost line depth, 27° F winter design temperature, no ice shield underlayment required.

Required documents

  • RequiredPermit applicationMTMC 15.05.210 requires application to the Building Official before any regulated work. The city runs an online permit portal; property owners register with “Setup an Account” and contractors with “Contractor Application”.
  • OptionalPlans prepared by a licensed professional where requiredMTMC 15.05.230 governs professional preparation of plans. Confirm with the Building Official whether your project crosses the threshold before drawing.
  • OptionalPerformance guarantee where improvements are requiredMTMC 15.05.290 and Chapter 15.35. A performance guarantee is “for 150 percent of a written estimate of the cost of construction of the required improvements associated with any development project”, except erosion control and street invasion control, which 15.35.010(B) treats separately. THIS IS SECURITY, NOT A PERMIT FEE, and it is returned or drawn on rather than spent.

Fee schedule

Fee typeAmountNotes
Permit feeSet by annually adopted fee schedule
No dollar figure is published in the municipal code. Show full citation

No dollar figure is published in the municipal code. MTMC 15.05.220(A) says permit fees “are established pursuant to MTMC § 3.150.090”, and 3.150.090 sets a mechanism rather than an amount: schedules “shall be established annually”, fees “shall be based upon a cost of service study completed every three years”, and they are “adjusted annually, based on the Seattle Area Consumer Price Index (CPI)” for All Urban Consumers over one 12-month period. Building, plumbing, mechanical and electrical permit and plan check fees are separately “adjusted annually based upon building valuation data or otherwise recognized sources”. Ask the city for the current schedule; it is not derivable from the code.

Commercial building permit

Verified

Permit for commercial and multifamily construction, alteration and change of occupancy in Mountlake Terrace, under the International Building Code adopted at MTMC 15.05.040.

Verified 2026-09-16 · Source

Requirements

  • MTMC 15.05.030(A) adopts the “International Building Code, 2021 Edition, published by the International Code Council, with state of Washington amendments”; MTMC 15.05.040 adopts the same year.
  • THE EXEMPTION LIST IS ONE ITEM LONG. MTMC 15.05.050(B) sets out IBC Section 105.2 in full and lists a single exemption: one-story detached accessory structures not exceeding 80 square feet with no side wall over 6 feet.
  • Sprinklers are required in all new buildings with a fire area of 5,000 square feet or greater “regardless of type or use”, and in existing buildings whose addition brings the new total fire area to 5,000 square feet or greater (MTMC 15.05.050(C)).
  • Additions and alterations must meet the IEBC for new construction and must not put the existing building into violation; an existing building plus additions must satisfy IBC Chapter 5 height and area limits (MTMC 15.05.050(A), amending Section [A]101.4.7).
  • CONFLICTS RESOLVE IN THREE TIERS AND THE TIE-BREAKER IS A NAMED OFFICER'S OPINION. Between the IBC, IRC, IMC and IFC “the first named code shall govern over those following”; between those four and other codes in the chapter, whichever “in the opinion of the Building Official, is more restrictive or more protective of public safety” prevails; and against other City development codes the same test is applied “in the opinion of the Community Development Director” (MTMC 15.05.200).

Required documents

  • RequiredPermit applicationMTMC 15.05.210 requires application to the Building Official before any regulated work. The city runs an online permit portal; property owners register with “Setup an Account” and contractors with “Contractor Application”.
  • OptionalPlans prepared by a licensed professional where requiredMTMC 15.05.230 governs professional preparation of plans. Confirm with the Building Official whether your project crosses the threshold before drawing.
  • OptionalPerformance guarantee where improvements are requiredMTMC 15.05.290 and Chapter 15.35. A performance guarantee is “for 150 percent of a written estimate of the cost of construction of the required improvements associated with any development project”, except erosion control and street invasion control, which 15.35.010(B) treats separately. THIS IS SECURITY, NOT A PERMIT FEE, and it is returned or drawn on rather than spent.

Fee schedule

Fee typeAmountNotes
Permit feeSet by annually adopted fee schedule
No dollar figure is published in the municipal code. Show full citation

No dollar figure is published in the municipal code. MTMC 15.05.220(A) says permit fees “are established pursuant to MTMC § 3.150.090”, and 3.150.090 sets a mechanism rather than an amount: schedules “shall be established annually”, fees “shall be based upon a cost of service study completed every three years”, and they are “adjusted annually, based on the Seattle Area Consumer Price Index (CPI)” for All Urban Consumers over one 12-month period. Building, plumbing, mechanical and electrical permit and plan check fees are separately “adjusted annually based upon building valuation data or otherwise recognized sources”. Ask the city for the current schedule; it is not derivable from the code.

Mechanical permit

Verified

Permit to install, alter, repair, convert or replace mechanical systems in Mountlake Terrace, under the International Mechanical Code adopted at MTMC 15.05.080.

Verified 2026-09-16 · Source

Requirements

  • MTMC 15.05.030(C) adopts the “International Mechanical Code, 2021 Edition, published by the International Code Council, with state of Washington amendments”, and MTMC 15.05.080 adopts the same year.
  • MTMC 15.05.210 names mechanical systems expressly: no person may “erect, install, enlarge, alter, repair, convert, or replace any electrical, gas, mechanical or plumbing system” regulated by the chapter without first applying to the Building Official and obtaining the permit.
  • Mechanical permit and plan check fees are adjusted annually on building valuation data under MTMC 3.150.090(D), separately from the CPI adjustment that applies to fees generally.

Required documents

  • RequiredPermit applicationMTMC 15.05.210 requires application to the Building Official before any regulated work. The city runs an online permit portal; property owners register with “Setup an Account” and contractors with “Contractor Application”.
  • OptionalPlans prepared by a licensed professional where requiredMTMC 15.05.230 governs professional preparation of plans. Confirm with the Building Official whether your project crosses the threshold before drawing.
  • OptionalPerformance guarantee where improvements are requiredMTMC 15.05.290 and Chapter 15.35. A performance guarantee is “for 150 percent of a written estimate of the cost of construction of the required improvements associated with any development project”, except erosion control and street invasion control, which 15.35.010(B) treats separately. THIS IS SECURITY, NOT A PERMIT FEE, and it is returned or drawn on rather than spent.

Fee schedule

Fee typeAmountNotes
Permit feeSet by annually adopted fee schedule
No dollar figure is published in the municipal code. Show full citation

No dollar figure is published in the municipal code. MTMC 15.05.220(A) says permit fees “are established pursuant to MTMC § 3.150.090”, and 3.150.090 sets a mechanism rather than an amount: schedules “shall be established annually”, fees “shall be based upon a cost of service study completed every three years”, and they are “adjusted annually, based on the Seattle Area Consumer Price Index (CPI)” for All Urban Consumers over one 12-month period. Building, plumbing, mechanical and electrical permit and plan check fees are separately “adjusted annually based upon building valuation data or otherwise recognized sources”. Ask the city for the current schedule; it is not derivable from the code.

Plumbing permit

Verified

Permit for plumbing installation, alteration, repair, conversion or replacement in Mountlake Terrace, under the Uniform Plumbing Code adopted at MTMC 15.05.090.

Verified 2026-09-16 · Source

Requirements

  • MTMC 15.05.030(E) adopts the “Uniform Plumbing Code, 2021 Edition, with state of Washington amendments, and Uniform Plumbing Code Standards, published by the International Association of Plumbing and Mechanical Officials”; MTMC 15.05.090 adopts the same year.
  • Washington is a Uniform Plumbing Code state rather than an International Plumbing Code state, and Mountlake Terrace adopts the UPC together with the separately published UPC Standards.
  • MTMC 15.05.210 requires a permit before any plumbing system is erected, installed, enlarged, altered, repaired, converted or replaced.
  • Plumbing permit and plan check fees are adjusted annually on building valuation data under MTMC 3.150.090(D).

Required documents

  • RequiredPermit applicationMTMC 15.05.210 requires application to the Building Official before any regulated work. The city runs an online permit portal; property owners register with “Setup an Account” and contractors with “Contractor Application”.
  • OptionalPlans prepared by a licensed professional where requiredMTMC 15.05.230 governs professional preparation of plans. Confirm with the Building Official whether your project crosses the threshold before drawing.
  • OptionalPerformance guarantee where improvements are requiredMTMC 15.05.290 and Chapter 15.35. A performance guarantee is “for 150 percent of a written estimate of the cost of construction of the required improvements associated with any development project”, except erosion control and street invasion control, which 15.35.010(B) treats separately. THIS IS SECURITY, NOT A PERMIT FEE, and it is returned or drawn on rather than spent.

Fee schedule

Fee typeAmountNotes
Permit feeSet by annually adopted fee schedule
No dollar figure is published in the municipal code. Show full citation

No dollar figure is published in the municipal code. MTMC 15.05.220(A) says permit fees “are established pursuant to MTMC § 3.150.090”, and 3.150.090 sets a mechanism rather than an amount: schedules “shall be established annually”, fees “shall be based upon a cost of service study completed every three years”, and they are “adjusted annually, based on the Seattle Area Consumer Price Index (CPI)” for All Urban Consumers over one 12-month period. Building, plumbing, mechanical and electrical permit and plan check fees are separately “adjusted annually based upon building valuation data or otherwise recognized sources”. Ask the city for the current schedule; it is not derivable from the code.

Electrical permit

Verified

Permit for electrical installation, alteration, repair, conversion or replacement in Mountlake Terrace, under the codes adopted at MTMC 15.05.130.

Verified 2026-09-16 · Source

Requirements

  • THREE INSTRUMENTS ARE ADOPTED TOGETHER. MTMC 15.05.130 adopts “the 2023 National Electrical Code (NEC), published by the National Fire Protection Association”, and also adopts the state “Department of Labor and Industries, Electrical Inspection Section, Rules and Regulations for Installing Electric Wiring and Equipment, and the Washington Cities Electrical Code, 2020 Edition” as part of the city's electrical code.
  • THE TWO ELECTRICAL CODES CARRY DIFFERENT YEARS, AND THE CODE SAYS SO IN ONE SENTENCE: MTMC 15.05.030(I) lists the “National Electrical Code, 2023 Edition” and “the Washington Cities Electrical Code, 2020 Edition” side by side.
  • City amendments to the NEC are set out separately at MTMC 15.05.140, and MTMC 15.05.130 adopts the NEC “provided, that certain sections of the NEC are amended as set forth in MTMC § 15.05.140”.
  • MTMC 15.05.210 requires a permit before any electrical system is erected, installed, enlarged, altered, repaired, converted or replaced.

Required documents

  • RequiredPermit applicationMTMC 15.05.210 requires application to the Building Official before any regulated work. The city runs an online permit portal; property owners register with “Setup an Account” and contractors with “Contractor Application”.
  • OptionalPlans prepared by a licensed professional where requiredMTMC 15.05.230 governs professional preparation of plans. Confirm with the Building Official whether your project crosses the threshold before drawing.
  • OptionalPerformance guarantee where improvements are requiredMTMC 15.05.290 and Chapter 15.35. A performance guarantee is “for 150 percent of a written estimate of the cost of construction of the required improvements associated with any development project”, except erosion control and street invasion control, which 15.35.010(B) treats separately. THIS IS SECURITY, NOT A PERMIT FEE, and it is returned or drawn on rather than spent.

Fee schedule

Fee typeAmountNotes
Permit feeSet by annually adopted fee schedule
No dollar figure is published in the municipal code. Show full citation

No dollar figure is published in the municipal code. MTMC 15.05.220(A) says permit fees “are established pursuant to MTMC § 3.150.090”, and 3.150.090 sets a mechanism rather than an amount: schedules “shall be established annually”, fees “shall be based upon a cost of service study completed every three years”, and they are “adjusted annually, based on the Seattle Area Consumer Price Index (CPI)” for All Urban Consumers over one 12-month period. Building, plumbing, mechanical and electrical permit and plan check fees are separately “adjusted annually based upon building valuation data or otherwise recognized sources”. Ask the city for the current schedule; it is not derivable from the code.

Fuel gas permit

Verified

Permit for fuel gas piping and appliance work in Mountlake Terrace, under the International Fuel Gas Code adopted at MTMC 15.05.120.

Verified 2026-09-16 · Source

Requirements

  • MTMC 15.05.030(H) adopts the “International Fuel Gas Code, 2021 Edition, published by the International Code Council, with state of Washington amendments”, and MTMC 15.05.120 adopts the same year.
  • MTMC 15.05.210 names gas systems expressly among the systems that may not be erected, installed, enlarged, altered, repaired, converted or replaced without a permit.
  • NO NFPA EDITION YEAR IS ADOPTED FOR FUEL GAS HERE. Chapter 15.10 brings in the fire code “specifically including reference standards of the National Fire Protection Association” but names no NFPA edition, so unlike several cities in this series Mountlake Terrace states no NFPA 54 or NFPA 58 year.

Required documents

  • RequiredPermit applicationMTMC 15.05.210 requires application to the Building Official before any regulated work. The city runs an online permit portal; property owners register with “Setup an Account” and contractors with “Contractor Application”.
  • OptionalPlans prepared by a licensed professional where requiredMTMC 15.05.230 governs professional preparation of plans. Confirm with the Building Official whether your project crosses the threshold before drawing.
  • OptionalPerformance guarantee where improvements are requiredMTMC 15.05.290 and Chapter 15.35. A performance guarantee is “for 150 percent of a written estimate of the cost of construction of the required improvements associated with any development project”, except erosion control and street invasion control, which 15.35.010(B) treats separately. THIS IS SECURITY, NOT A PERMIT FEE, and it is returned or drawn on rather than spent.

Fee schedule

Fee typeAmountNotes
Permit feeSet by annually adopted fee schedule
No dollar figure is published in the municipal code. Show full citation

No dollar figure is published in the municipal code. MTMC 15.05.220(A) says permit fees “are established pursuant to MTMC § 3.150.090”, and 3.150.090 sets a mechanism rather than an amount: schedules “shall be established annually”, fees “shall be based upon a cost of service study completed every three years”, and they are “adjusted annually, based on the Seattle Area Consumer Price Index (CPI)” for All Urban Consumers over one 12-month period. Building, plumbing, mechanical and electrical permit and plan check fees are separately “adjusted annually based upon building valuation data or otherwise recognized sources”. Ask the city for the current schedule; it is not derivable from the code.

Sources & verification

Verified against official sources. Last reviewed 2026-09-16.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Mountlake Terrace building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /washington/snohomish-county/mountlake-terrace/as-of/2026-09-16/

Snapshot date: 2026-09-16

Commit: 8d9e658

Reproducible from PermitBase’s version-controlled dataset, commit 8d9e658.