You are viewing the permanent link for the record currently in effect, published 2026-09-16.

Lynden building permits

Lynden, Washington — as published 2026-09-16.

Reviewed 2026-09-16 · Source

Codes adopted

LYNDEN NAMES NO EDITION FOR ANY CODE, AND ADOPTS FUTURE AMENDMENTS IN ADVANCE. LMC 15.02.010: "The city adopts the International Building Code, published by the International Code Council, as the building code of the city. The city further adopts any future amendments to the International Building Code, effective upon its adoption by the State Building Code Council." (Ord. 1195 SS A(part), 2004). The same two-sentence device is used for the International Existing Building Code (15.03.010), the International Residential Code (15.04.010), the International Mechanical Code (15.06.010), the Uniform Plumbing Code (15.08.010) and the International Fire Code (15.12.010).THE ENACTING ORDINANCE IS FROM 2004 AND IT STILL TRACKS THE STATE. Most of Title 15 carries "(Ord. 1195 SS A(part), 2004)". Because the adoptions were drafted to absorb future amendments automatically, a twenty-two-year-old ordinance still delivers the current state code without the council re-enacting anything.THE ELECTRICAL CODE IS ADOPTED WITHOUT EVEN A STATE TRIGGER. LMC 15.10.010: "The city adopts the current National Electrical Code, including all appendices, as the electrical code of the city. The city further adopts any future amendments to the National Electrical Code." Note what is missing - there is no "effective upon its adoption by the State Building Code Council" qualifier on this one, unlike the building and residential adoptions.THE ENERGY CODE CITATION IS WORTH CHECKING BEFORE YOU RELY ON IT. LMC 15.24.010 adopts "The Washington State Energy Code contained in Washington Administrative Code Chapter 15-11, and all subsequent amendments thereto which are required to be adopted by the city". Camas's code, read on the same day, cites "WAC 51-11 energy code" for the same thing. This guide records both as published and does not adjudicate between them - ask the city which chapter it applies.RCW 19.27 - the Washington State Building Code applies statewide.

Permit types & fees

Building Permit

Required for construction in Lynden. The city adopts the International Building Code with no edition year and takes future state amendments automatically.

Reviewed 2026-09-16 · Source

Requirements

  • Built to the International Building Code as currently adopted by the State Building Code Council - LMC 15.02.010 names no edition year
  • Sewage disposal approved by the health department must be established first
  • If the building is within 400 feet of an existing sewer line, it MUST connect
  • Compliance with zoning, subdivision and all other applicable laws must be established before the permit issues
  • Filed through the city's SmartGov Online Permit Center

Required documents

  • RequiredPermit applicationPermit application, filed through the city's SmartGov Online Permit Center

Fee schedule

Fee typeAmountNotes
Building permit feeNot stated in this guide - see notes
LYNDEN PUTS BOTH HALVES OF THE FEE CALCULATION OUTSIDE ITS CODE, SO NO AMOUNT IS PRINTED HERE. Show full citation

LYNDEN PUTS BOTH HALVES OF THE FEE CALCULATION OUTSIDE ITS CODE, SO NO AMOUNT IS PRINTED HERE. LMC 15.02.060 provides that "The valuation schedule to be utilized by the planning director or his or her designee in administering the International Building Code shall be set by resolution of the city council" and that "Building permit fees shall be as set forth by resolution of the city council." Both the valuation basis AND the fee are council resolutions, so neither can be read off the municipal code. Ask the Building Division for the current resolution. AND BUDGET FOR ONE MORE THING: under LMC Chapter 15.26 the city may require third-party review of your application at your sole cost, payable as a deposit before review begins.

Shed or Detached Accessory Building

Lynden exempts the smallest detached accessory buildings from a building permit, and its code states both the exemption and its converse.

Reviewed 2026-09-16 · Source

Requirements

  • Exempt only if one story, used as a tool or storage shed, playhouse or similar use, and not exceeding one hundred twenty square feet of floor area
  • The code states expressly that "A permit is required for any building that is more than one hundred twenty square feet of floor area."
  • Zoning setbacks and lot coverage still apply even where a building permit does not

Required documents

  • RequiredPermit applicationPermit application, filed through the city's SmartGov Online Permit Center

Fee schedule

Fee typeAmountNotes
Building permit feeNot stated in this guide - see notes
LYNDEN PUTS BOTH HALVES OF THE FEE CALCULATION OUTSIDE ITS CODE, SO NO AMOUNT IS PRINTED HERE. Show full citation

LYNDEN PUTS BOTH HALVES OF THE FEE CALCULATION OUTSIDE ITS CODE, SO NO AMOUNT IS PRINTED HERE. LMC 15.02.060 provides that "The valuation schedule to be utilized by the planning director or his or her designee in administering the International Building Code shall be set by resolution of the city council" and that "Building permit fees shall be as set forth by resolution of the city council." Both the valuation basis AND the fee are council resolutions, so neither can be read off the municipal code. Ask the Building Division for the current resolution. AND BUDGET FOR ONE MORE THING: under LMC Chapter 15.26 the city may require third-party review of your application at your sole cost, payable as a deposit before review begins.

Verify a Contractor Licence

Washington contractors register with the Department of Labor & Industries. Registration is a STATE record; Lynden does not issue it.

Reviewed 2026-09-16 · Source

Requirements

  • Check contractor registration with Washington State Labor & Industries

Required documents

  • OptionalNo city document requiredNo city document - check the state register

Fee schedule

Fee typeAmountNotes
Building permit feeNot stated in this guide - see notes
LYNDEN PUTS BOTH HALVES OF THE FEE CALCULATION OUTSIDE ITS CODE, SO NO AMOUNT IS PRINTED HERE. Show full citation

LYNDEN PUTS BOTH HALVES OF THE FEE CALCULATION OUTSIDE ITS CODE, SO NO AMOUNT IS PRINTED HERE. LMC 15.02.060 provides that "The valuation schedule to be utilized by the planning director or his or her designee in administering the International Building Code shall be set by resolution of the city council" and that "Building permit fees shall be as set forth by resolution of the city council." Both the valuation basis AND the fee are council resolutions, so neither can be read off the municipal code. Ask the Building Division for the current resolution. AND BUDGET FOR ONE MORE THING: under LMC Chapter 15.26 the city may require third-party review of your application at your sole cost, payable as a deposit before review begins.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-09-16.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Lynden building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

View current record →All versions →

Permalink: /washington/whatcom-county/lynden/as-of/2026-09-16/

Snapshot date: 2026-09-16

Commit: 6cf9cee

Reproducible from PermitBase’s version-controlled dataset, commit 6cf9cee.