You are viewing the permanent link for the record currently in effect, published 2026-09-16.
Yakima building permits
Yakima, Washington — as published 2026-09-16.
Reviewed 2026-09-16 · Source
Codes adopted
Permit types & fees
Building Permit
Required for construction in Yakima. The city adopts the 2021 Washington State Building Code by name and amends the residential exempt-work list generously.
Reviewed 2026-09-16 · Source
Requirements
- Built to the 2021 Washington State Building Code, including Appendix E Sections 101-111, Appendix G and Appendix J
- Residential work is to the 2021 Washington State Residential Code including Appendix Q (Tiny Homes)
- Design to the city's own Table R301.2(1) - and check your site elevation against the 1,166 foot line before fixing a snow load
Required documents
- RequiredPermit applicationPermit application as required by the City of Yakima division of code administration.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building permit fee | Not stated in this guide - see notes | YAKIMA'S PERMIT FEE AMOUNTS ARE NOT IN ITS CODE. Show full citationHideYAKIMA'S PERMIT FEE AMOUNTS ARE NOT IN ITS CODE. YMC 11.04.030 provides that "The city council shall adopt by resolution a schedule of permit fees required under this chapter which shall include a schedule of fees and a building valuation" - so both the fee schedule AND the valuation basis it is computed from sit in a council resolution outside the code, the same arrangement Lynden uses. Ask the city for the current resolution. |
Fence
Yakima exempts fences up to seven feet from a building permit - a higher threshold than neighbouring cities in this guide.
Reviewed 2026-09-16 · Source
Requirements
- No building permit for a fence not over 7 feet (2134 mm) high
- Zoning rules on height, placement and sight triangles can still apply
Required documents
- RequiredPermit applicationPermit application as required by the City of Yakima division of code administration.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building permit fee | Not stated in this guide - see notes | YAKIMA'S PERMIT FEE AMOUNTS ARE NOT IN ITS CODE. Show full citationHideYAKIMA'S PERMIT FEE AMOUNTS ARE NOT IN ITS CODE. YMC 11.04.030 provides that "The city council shall adopt by resolution a schedule of permit fees required under this chapter which shall include a schedule of fees and a building valuation" - so both the fee schedule AND the valuation basis it is computed from sit in a council resolution outside the code, the same arrangement Lynden uses. Ask the city for the current resolution. |
Shed or Detached Accessory Structure
Yakima exempts detached non-habitable accessory structures up to 200 square feet.
Reviewed 2026-09-16 · Source
Requirements
- One story, DETACHED, and NON-HABITABLE
- Used as a tool or storage shed, play house or similar use
- Floor area not exceeding 200 square feet
- Zoning setbacks and lot coverage still apply
Required documents
- RequiredPermit applicationPermit application as required by the City of Yakima division of code administration.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building permit fee | Not stated in this guide - see notes | YAKIMA'S PERMIT FEE AMOUNTS ARE NOT IN ITS CODE. Show full citationHideYAKIMA'S PERMIT FEE AMOUNTS ARE NOT IN ITS CODE. YMC 11.04.030 provides that "The city council shall adopt by resolution a schedule of permit fees required under this chapter which shall include a schedule of fees and a building valuation" - so both the fee schedule AND the valuation basis it is computed from sit in a council resolution outside the code, the same arrangement Lynden uses. Ask the city for the current resolution. |
Verify a Contractor Licence
Washington contractors register with the Department of Labor & Industries. Registration is a STATE record; Yakima does not issue it.
Reviewed 2026-09-16 · Source
Requirements
- Check contractor registration with Washington State Labor & Industries
Required documents
- OptionalNo city document requiredNo city document - check the state register.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building permit fee | Not stated in this guide - see notes | YAKIMA'S PERMIT FEE AMOUNTS ARE NOT IN ITS CODE. Show full citationHideYAKIMA'S PERMIT FEE AMOUNTS ARE NOT IN ITS CODE. YMC 11.04.030 provides that "The city council shall adopt by resolution a schedule of permit fees required under this chapter which shall include a schedule of fees and a building valuation" - so both the fee schedule AND the valuation basis it is computed from sit in a council resolution outside the code, the same arrangement Lynden uses. Ask the city for the current resolution. |
Sources & verification
Key facts verified against official sources. Last reviewed 2026-09-16.
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Yakima building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.