This is PermitBase’s published record for Laramie as of 2026-07-01. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.
Laramie building permits
VerifiedLaramie, Wyoming — as published 2026-07-01.
Verified 2026-07-01 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family dwellings, duplexes, and other one- and two-family residential construction within the City of Laramie. Governed by the 2024 IRC as adopted by the City, with local design criteria (snow, wind, seismic, frost depth) per Informational Bulletin #2.
Verified 2026-07-01 · Source
Requirements
- Submit one set of complete plans and specifications, including a site plan and energy model (e.g., REScheck), as both a hard copy and a digital PDF
- Plans must show: site plan (lot dimensions, building footprint, decks, overhangs, off-street parking, utilities, drainage, topography, landscaping); footing/foundation plan with soils report where required; geotechnical/drainage report where required; framing plan; floor plan of each floor; exterior elevations; wall sections and details
- Design must account for local criteria: 115 mph wind speed (Exposure C), Seismic Site Class B, 30 psf ground/roof snow load, 42-inch minimum frost depth
- All applications submitted through the City of Laramie Civic Access online portal
- Standard plan review period is approximately 3 weeks (15 business days); plan review fee applies where valuation exceeds $5,000
- Separate permits required for plumbing, mechanical, electrical, signs, and fire sprinklers
- All contractors must hold a current City of Laramie contractor license (in addition to any Wyoming state trade license)
- Certificate of Occupancy required before occupying the building; issued at no additional cost after a successful final inspection
Required documents
- RequiredBuilding Permit Application (via Civic Access portal)Online application submitted through the City of Laramie's Civic Access web portal
- RequiredConstruction Drawings and SpecificationsOne hard copy set plus a digital PDF set: site plan, footing/foundation plan, framing plan, floor plans, exterior elevations, wall sections/details
- RequiredEnergy Compliance Documentation (REScheck)Required energy model demonstrating compliance with the 2024 IECC
- OptionalSoils/Geotechnical ReportRequired where the Building Official determines soil conditions warrant it
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — $1.00 to $500.00 valuation | $23.50 (no plan review fee below $5,000 valuation) | City of Laramie Building Permit and Plan Review Fee Schedule (Informational Bulletin #25, effective Jan. 1, 2006) |
| Building Permit Fee — $24,001 to $25,000 valuation | $391.25 building permit fee plus $254.31 plan review fee | City of Laramie Building Permit and Plan Review Fee Schedule |
| Building Permit Fee — $99,001 to $100,000 valuation | $993.75 building permit fee plus $645.94 plan review fee | City of Laramie Building Permit and Plan Review Fee Schedule |
| Building Permit Fee — $100,001 to $500,000 valuation | $993.75 for the first $100,000 plus $5.60 for each additional $1,000 or fraction thereof | City of Laramie Building Permit and Plan Review Fee Schedule |
| Plan Review Fee — $100,001 to $500,000 valuation | $645.94 for the first $100,000 plus $3.53 for each additional $1,000 or fraction thereof | City of Laramie Building Permit and Plan Review Fee Schedule |
| Building Permit Fee — $500,001 to $1,000,000 valuation | $3,233.75 for the first $500,000 plus $4.75 for each additional $1,000 or fraction thereof | — |
| Building Permit Fee — $1,000,001 and up | $5,608.75 for the first $1,000,000 plus $3.65 for each additional $1,000 or fraction thereof | — |
| State of Wyoming / University of Wyoming owned buildings | Exempt from building permit and plan review fees | City of Laramie Building Permit and Plan Review Fee Schedule — exemption for state-owned buildings |
| Reinspection / after-hours inspection / inspection with no fee specified | $47.00/hour (minimum charge one-half hour to two hours depending on category) | City of Laramie Building Permit and Plan Review Fee Schedule |
Residential Addition / Remodel Permit
VerifiedRequired for additions, structural alterations, remodels, basement finishes, and other significant alterations to existing one- and two-family dwellings in Laramie. Charged under the same general valuation-based Building Permit and Plan Review Fee Schedule as new construction (no separate flat fee table).
Verified 2026-07-01 · Source
Requirements
- Room additions, structural modifications, basement finishes, and remodels require a building permit
- Submit plans showing scope, dimensions, structural details, and connection to the existing structure
- Charged under the City's general valuation-based Building Permit and Plan Review Fee Schedule — there is no separate flat fee table for additions/remodels
- Applications submitted through the Civic Access portal
- Separate trade permits (electrical, mechanical, plumbing) required if those systems are altered
Required documents
- RequiredBuilding Permit Application (via Civic Access portal)Online application; select the addition/remodel scope
- RequiredSite PlanExisting structures, proposed addition footprint, dimensions to property lines
- RequiredConstruction DrawingsPlans showing all aspects of the addition or alteration, drawn to the City's general standards for plans and drawings (Bulletin #3)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based (same schedule as new construction) | See Building Permit and Plan Review Fee Schedule — e.g., $23.50 for $1–$500 valuation up to $5,608.75 for the first $1,000,000 plus $3.65/$1,000 above that | City of Laramie Building Permit and Plan Review Fee Schedule (Bulletin #25); additions/remodels have no separate flat fee — charged under the general valuation table, which is a fully verified fact per the framework's valuation-table rule |
Electrical Permit
VerifiedRequired for new electrical installations, alterations, and additions in Laramie. Per the Wyoming State Fire Marshal's 'Local and State Jurisdictions' enforcement chart, Laramie's electrical arrangement is split: the CITY of Laramie issues the permit and performs electrical INSPECTIONS (ELEC INSP = L), while electrical PLAN REVIEW is performed by the STATE (Wyoming State Fire Marshal's Office / Chief Electrical Inspector) (ELEC PR = S). This is corroborated by the City's own Informational Bulletin #12, which states that electrical contractors must be licensed by BOTH the City of Laramie AND the State of Wyoming.
Verified 2026-07-01 · Source
Requirements
- A permit is required for all new electrical installations and for additions or alterations to new or existing buildings/structures
- Routine maintenance (repair/replacement of switches, lighting fixtures, or receptacle outlets) is exempt from permitting
- Permits are issued only to licensed electrical contractors, or to homeowners performing work in a single-family dwelling they both own and occupy (from the distribution panel/breaker cabinet downstream to the device or fixture)
- Homeowners may NOT do their own service connection work; only a City of Laramie- and State of Wyoming-licensed electrical contractor may work on electrical service equipment
- Per the WSFM enforcement chart: the City of Laramie performs electrical inspections; the Wyoming State Fire Marshal's Office (Chief Electrical Inspector) performs electrical plan review for Laramie — contact the City to confirm current plan-review submission routing for complex/commercial electrical scopes
- Rough-in inspection required before work is covered by wall covering, paneling, or insulation; final inspection required with all devices/fixtures energized to verify proper operation; 24-hour advance notice required to schedule
Required documents
- RequiredElectrical Permit Application (via Civic Access portal)Submitted through the City of Laramie Civic Access web portal
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Permit Fee — $1.00 to $500.00 valuation | $23.50 | City of Laramie Electrical, Mechanical and Plumbing Permit Fee Schedules — Electrical Unit Fee Schedule (valuation-based table) |
| Electrical Permit Fee — $2,001.00 to $25,000.00 valuation | $69.25 for the first $2,000 plus $14.00 for each additional $1,000, or fraction thereof | City of Laramie Electrical Unit Fee Schedule |
| Electrical Permit Fee — $25,001.00 to $50,000.00 valuation | $391.25 for the first $25,000 plus $10.10 for each additional $1,000, or fraction thereof | — |
| Electrical Permit Fee — $50,001.00 to $100,000.00 valuation | $643.75 for the first $50,000 plus $7.00 for each additional $1,000, or fraction thereof | — |
| Electrical Permit Fee — $100,001.00 to $500,000.00 valuation | $993.75 for the first $100,000 plus $5.60 for each additional $1,000, or fraction thereof | — |
| Electrical Permit Fee — $500,001.00 to $1,000,000.00 valuation | $3,233.75 for the first $500,000 plus $4.75 for each additional $1,000, or fraction thereof | — |
| Electrical Permit Fee — $1,000,001.00 and up | $5,608.75 for the first $1,000,000 plus $3.65 for each additional $1,000, or fraction thereof | — |
| Wyoming State Fire Marshal wiring permit (if electrical plan review routes through the state program) | Standard wiring permit $50 (temporary/90-day $40); waived if inspection is requested and paid for | WY State Fire Marshal's Office — electrical-safety program fee schedule; applies to the STATE's plan-review/administrative side of Laramie's split arrangement — confirm current applicability with the City and WSFM regional inspector |
Plumbing Permit
VerifiedRequired for plumbing installations, alterations, and repairs in Laramie. Governed by the 2024 International Plumbing Code (IPC). Charged per the City's Plumbing Unit Fee Schedule (a base permit fee plus itemized per-fixture/system fees), separate from the valuation-based building permit table.
Verified 2026-07-01 · Source
Requirements
- Base plumbing permit fee plus itemized per-item fees for fixtures, sewer/water service, gas piping, boilers, and water heaters
- Applications submitted through the Civic Access portal
- 24-hour advance notice required to schedule inspections
- Separate permit from the general building permit — required even when submitted alongside a building permit application
Required documents
- RequiredPlumbing Permit Application (via Civic Access portal, or the City's paper Plumbing/Mechanical/Electrical Permit Application form)Lists base permit fee plus itemized fixture/system counts and fees
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Base Permit Fee | $20.00 | City of Laramie Plumbing Permit Application form / Plumbing Unit Fee Schedule |
| Supplemental Permit | $10.00 | — |
| Sewer Service Installation or Replacement | $15.00 | — |
| Water Service Installation or Replacement | $15.00 | — |
| Each Plumbing Fixture or Trap | $7.00 | — |
| Gas Piping, up to and including 5 outlets | $5.00 (each additional outlet over 5: $1.00) | — |
| Water Heater | $7.00 | — |
| Each New or Enlarged Water or Sewer Service Tap at Main | $20.00 | City of Laramie Plumbing Unit Fee Schedule (Electrical, Mechanical and Plumbing Permit Fee Schedules document) |
| Boiler System to 500,000 Btu/h | $27.15 | Plumbing Unit Fee Schedule item 9 |
| Boiler System to 1,000,000 Btu/h | $37.25 | — |
| Lawn Sprinkler System | $7.00 | — |
Mechanical / HVAC Permit
VerifiedRequired for heating, cooling, ventilation, and fuel-gas equipment installations in Laramie. Governed by the 2024 International Mechanical Code (IMC) and International Fuel Gas Code (IFGC). Charged per the City's itemized Mechanical Unit Fee Schedule.
Verified 2026-07-01 · Source
Requirements
- Base permit fee plus itemized per-item fees for furnaces, boilers/compressors, air-handling units, and gas piping
- Applications submitted through the Civic Access portal
- 24-hour advance notice required for inspections
Required documents
- RequiredMechanical Permit Application (via Civic Access portal, or the City's paper Plumbing/Mechanical/Electrical Permit Application form)Lists base permit fee plus itemized equipment fees
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Base Permit Fee | $23.50 | City of Laramie Mechanical Unit Fee Schedule |
| Supplemental Permit | $7.25 | — |
| Forced Air/Gravity Furnace to 100,000 Btu/h | $14.80 | — |
| Forced Air/Gravity Furnace over 100,000 Btu/h | $18.20 | — |
| Gas Piping, up to and including 5 outlets | $5.00 (each additional outlet over 5: $1.00) | — |
| Alter Heating, Refrigeration, Cooling or Absorption System | $13.70 | — |
| Air-Handling Unit up to and including 10,000 cfm | $10.65 | Air-handling unit OVER 10,000 cfm is $18.10 per the Mechanical Unit Fee Schedule (item 11) |
| Boiler, Compressor or Absorption System to 3 hp/100,000 Btu/h | $14.70 | — |
| Install or Relocate Boiler or Compressor, 3–15 hp | $27.15 | City of Laramie Mechanical Unit Fee Schedule item 3 |
| Install or Relocate Boiler or Compressor, 15–30 hp | $37.25 | — |
| Hood System | $10.65 | — |
Roofing Permit (Reroof)
VerifiedRequired for roof replacement (tear-off and reroof) in Laramie. Roofing has no separate flat fee or dedicated permit line; it is charged under the general valuation-based Building Permit and Plan Review Fee Schedule. Roof assemblies must comply with the 2024 IRC/IBC roofing chapters per Informational Bulletin #30.
Verified 2026-07-01 · Source
Requirements
- A building permit is required for roof replacement/reroofing
- Roof assemblies must comply with 2024 IRC Chapters 8–9 (residential) or 2024 IBC Chapter 15 (commercial)
- Ice barrier required; drip edge required at eave and rake; maximum one layer of asphalt shingles; one layer of 15 lb. felt underlayment minimum
- Design snow load 30 psf; wind speed 115 mph (3-second gust)
- Charged under the general valuation-based Building Permit and Plan Review Fee Schedule — no separate flat roofing fee
Required documents
- RequiredBuilding Permit Application (via Civic Access portal)Select reroof/roofing scope; plans may be minimal for straightforward residential tear-off/reroof
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based (no dedicated reroof fee line) | Per the general Building Permit and Plan Review Fee Schedule (e.g., $23.50 for $1–$500 valuation up to the full table) | Roofing has no separate flat fee in Laramie's fee schedules; per the framework's valuation-table rule this is a fully verified fact — the general Building Permit and Plan Review Fee Schedule (Bulletin #25) applies |
Solar PV / Private Energy Generation Permit
VerifiedRequired for installation of solar, wind, or standby generator private energy generation systems in Laramie, whether stand-alone or grid-tied. Depending on the scope, both a building permit and an electrical permit may be required (per Informational Bulletin #23, Private Energy Generation Systems).
Verified 2026-07-01 · Source
Requirements
- Permits required for all new or altered private energy generation systems (solar, wind, conventional stand-by generators), stand-alone or grid-tied
- Building and/or electrical permit application required depending on the nature of the work
- Site plan showing existing/proposed site improvements
- Structural plan showing foundations, supports, towers, or other equipment/mounting devices — generally must be prepared by a Wyoming registered professional engineer, showing compliance with gravity and wind loads
- One-line electrical drawing with load calculations, wiring sizes, disconnects, overload protection, and grounding; equipment must be listed by a nationally recognized testing agency (UL/CSA)
- Signed net metering agreement from the power utility required if grid-tied
- Electrical permits may be issued to homeowners performing work on their own private dwelling, EXCEPT the final utility interconnection, which must be performed by a licensed electrical contractor
- Final inspection required before any equipment is energized
Required documents
- RequiredBuilding and/or Electrical Permit Application (via Civic Access portal)Depending on scope of work — structural (mounting/racking) and/or electrical (interconnection) permit
- RequiredSite PlanExisting and proposed site improvements
- RequiredStructural PlanFoundations, supports, towers, mounting devices; generally requires a Wyoming registered professional engineer's stamp
- RequiredOne-Line Electrical DrawingLoad calculations, wiring sizes, disconnects, overload protection, grounding; equipment identified by manufacturer/model, UL/CSA listed
- OptionalNet Metering AgreementSigned agreement from the power utility, required for grid-tied systems
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (structural/mounting scope) — valuation-based | Per the general Building Permit and Plan Review Fee Schedule (no dedicated solar fee line) | City of Laramie Building Permit and Plan Review Fee Schedule; solar has no separate flat fee — charged under the general valuation table for the structural/building scope |
| Electrical Permit Fee (interconnection scope) — valuation-based | Per the Electrical Unit Fee Schedule (e.g., $23.50 for $1–$500 valuation, scaling per the table) | City of Laramie Electrical Unit Fee Schedule — applies to the electrical/interconnection scope of a solar installation |
Accessory Dwelling Unit (ADU) Permit
VerifiedRequired for construction of an ADU on a single-family residential lot in Laramie. ADUs were formally authorized city-wide in the R1, LR, and RR zoning districts by Enrolled Ordinance No. 1807 (effective April 19, 2022), which created LMC 15.10.030.D.5 (Accessory Dwelling Units) and amended the Chapter 15.28 definition of 'Dwelling, Accessory.' Processed as a standard residential building permit application (no separate ADU-specific permit form), subject to the ADU-specific zoning standards below.
Verified 2026-07-01 · Source
Requirements
- Permitted as an accessory use in the R1, LR, and RR (single-family) zoning districts per LMC 15.10.030.D.5
- May be attached to or detached from the principal structure on the property
- All applicable lot and principal-building-type dimensional standards for the district apply (LMC Table 15.12-2)
- Only ONE accessory dwelling unit is permitted per detached one-unit dwelling lot
- Must have a separate access from the principal structure
- Must have separate utility access from the principal structure EXCEPT that the principal use and an approved ADU may share the same utility meter (per LMC 15.10.030.C.5, as amended by Ordinance 1807) — confirm current utility metering requirements with Code Administration, as the ordinance text on shared/separate utility access appears in two places with slightly different framing
- Building footprint of the ADU may be up to 40% of the principal dwelling's building footprint OR 600 square feet, whichever is LESSER
- Maximum ADU size: 1,200 square feet; minimum ADU size: 220 square feet
- ADU height may not exceed the height of the principal structure
- Standard building permit application, plans, and fees apply (same process as residential-building-permit)
Required documents
- RequiredBuilding Permit Application (via Civic Access portal)ADUs are processed through the standard residential building permit process; no separate ADU permit form
- RequiredSite PlanProperty lines, existing structures, proposed ADU location/footprint, setbacks, separate access point
- RequiredConstruction DrawingsFull plan set demonstrating compliance with LMC 15.10.030.D.5 size/footprint/height standards and Table 15.12-2 dimensional standards
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based (same schedule as new residential construction) | Per the general Building Permit and Plan Review Fee Schedule — e.g., $23.50 for $1–$500 valuation, scaling per the table | City of Laramie Building Permit and Plan Review Fee Schedule; ADUs have no separate flat fee — charged under the general valuation table, same as new construction |
Demolition Permit
VerifiedA building permit is required before demolishing any building or structure within the City of Laramie, with limited exceptions for small accessory structures, low fences, small decks, and public right-of-way structures. Fees may include the building permit, street/sidewalk closure permit, excavation permit, and landfill fees.
Verified 2026-07-01 · Source
Requirements
- Building permit required before beginning any demolition, except: one-story detached accessory structures (tool/storage sheds) under 200 sq ft; fences not over 7 feet high; decks not exceeding 200 sq ft and not more than 30 inches above grade; public buildings/structures within a public right-of-way
- Reviewed for code compliance by multiple City divisions: building and fire codes, public works standards, development code
- Engineering report may be required to show the demolition can be completed safely with minimal impact to public right-of-way or adjoining property (can be waived for minor/isolated work)
- Street or sidewalk closure permit required from the City Engineering Division if any closure occurs
- Hazardous material/disposal/haul plan required, including WYDEQ asbestos notification copy where applicable, and an estimate of material quantities to be hauled to the City landfill
- Environmental controls required during construction (stormwater/SWPPP, noise, dust, wind-blown debris) per City noise ordinance
- Post-demolition site remediation plan required: excavations filled/graded/seeded, abandoned driveways replaced with standard curb/gutter/sidewalk, underground utilities abandoned per city standards
- Final inspection required upon completion; damaged public facilities must be repaired and site cleaned of debris
Required documents
- RequiredBuilding Permit Application (via Civic Access portal)Demolition-scope building permit application
- OptionalEngineering ReportRequired when the Building Official determines it necessary to show safe demolition methodology; may be waived for minor work
- RequiredHazardous Material/Disposal/Haul PlanIdentifies hazardous materials and disposal location; includes WYDEQ asbestos notification copy where required
- OptionalStreet or Sidewalk Closure PlanSeparate permit from the City Engineering Division if closure occurs
- RequiredPost-Demolition Site Remediation PlanSite fill/grade/seed plan, driveway/utility abandonment plan
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (demolition scope) — valuation-based | Per the general Building Permit and Plan Review Fee Schedule (no dedicated flat demolition fee) | Informational Bulletin #11 states demolition permit fees 'may include the building permit, street closure permit, excavation permit, and landfill fees' — an estimate can be provided in advance by Code Administration; no separate flat demolition fee line is published |
Deck Permit
VerifiedRequired for decks in Laramie except small decks meeting the exemption threshold (not more than 30 inches above grade, not attached to the house, not over 200 sq ft, not serving the primary egress/front door). Governed by the IRC/IBC per Informational Bulletin #14; charged under the general valuation-based Building Permit and Plan Review Fee Schedule (no separate flat deck fee).
Verified 2026-07-01 · Source
Requirements
- Exempt only if: not more than 30 inches above grade, not attached to the house, not over 200 sq ft, and does not serve the primary egress/front door. All other decks require a building permit.
- Submit application, plans, and specifications for review
- Site plan showing dimensions to each property line; setbacks apply per zoning district (contact Code Administration for setback confirmation)
- Structural plan from lowest footing point to highest point of work (handrail/roof), including framing material sizes, wood species, spans, and footing design
- Commercial decks may require a structural design by a Wyoming registered professional engineer or architect
- Detail of connection to the existing building, including fasteners and hangers
- Piers must be a minimum of 42 inches below frost depth
- Stairway/handrail dimensional standards apply per IRC (min. 36-inch stairway width, max. 7¾-inch rise, min. 10-inch tread run, etc.)
Required documents
- RequiredBuilding Permit Application (via Civic Access portal)Deck-scope building permit application with site and structural plans
- RequiredSite PlanLot dimensions, existing buildings, proposed deck/patio location, setback dimensions to property line
- RequiredStructural PlanFraming materials, wood species, spans, footing design from lowest footing to highest point
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee (deck scope) — valuation-based | Per the general Building Permit and Plan Review Fee Schedule (no dedicated flat deck fee) | Decks have no separate flat fee in Laramie — charged under the general valuation-based Building Permit and Plan Review Fee Schedule (Bulletin #25), which is a fully verified fact per the framework's valuation-table rule |
Commercial Tenant Improvement / Remodel Permit
VerifiedRequired for interior alterations, renovations, or change-of-use work in existing commercial buildings in Laramie. Uses the same general valuation-based Building Permit and Plan Review Fee Schedule as other building permits; governed by the 2024 IBC/IEBC and 2024 IECC (commercial energy compliance via COMMcheck).
Verified 2026-07-01 · Source
Requirements
- Submit one complete set of plans, specifications, site plan, and energy model (COMMcheck) as both hard copy and digital PDF
- Change of use is separately regulated (LMC 15.10.010, Change of Use) and may trigger additional zoning/use review beyond the building permit
- Plans for buildings over 4,000 sq ft, over three stories, or with five or more dwelling units must be professionally prepared
- Applications submitted through the Civic Access portal
- Additional supporting documentation required where public food preparation/handling is involved
- Standard plan review period approximately 3–4 weeks; may take longer for complex commercial projects
Required documents
- RequiredBuilding Permit Application (via Civic Access portal)Commercial tenant improvement / remodel scope
- RequiredConstruction Drawings and SpecificationsFull commercial plan set; professionally prepared (architect/engineer) for buildings over 4,000 sq ft or 3+ stories
- RequiredEnergy Compliance Documentation (COMMcheck)Required for commercial buildings under the 2024 IECC
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building Permit Fee — valuation-based (same schedule as residential) | Per the general Building Permit and Plan Review Fee Schedule (e.g., $993.75 for the first $100,000 plus $5.60/$1,000 above that) | City of Laramie Building Permit and Plan Review Fee Schedule (Bulletin #25) applies to commercial projects using the same valuation table as residential; no separate commercial-only fee schedule was found |
| Plan Review Fee | Per the same valuation-based Plan Review Fee columns as the Building Permit Fee table | City of Laramie Building Permit and Plan Review Fee Schedule |
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Laramie building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.