Gillette building permits

Verified

Gillette, Wyoming — as published 2026-07-17.

Verified 2026-07-01 · Source

Codes adopted

International Building Code (IBC), 2021 Edition — including Appendix C, adopted by City of Gillette Code Chapter 5, Article I § 5-I-2 (Revised 6-16-2026). CHANGED 2026-07-16 audit: the live § 5-I-2.A text now reads "2021 Edition, including Appendix C" and no longer cites Ord. 4052 (12-17-2024), which had adopted the 2024 IBC edition with Appendices C and H per the source PDF as of the prior 2026-07-01 verification; the 2024-edition adoption no longer appears in the current ordinance text.International Residential Code (IRC), 2021 Edition — including Appendices AA, AB, AC, AE, AN, AQ, and AW (AW 3D Printed Construction), adopted § 5-I-3 (Revised 6-16-2026). CHANGED 2026-07-16 audit: the live § 5-I-3.A text now reads "2021 Edition" with this different appendix set (previously 2024 Edition, Appendices CA, CB, BA, CE, BB, BM per Ord. 4052, 12-17-2024, which no longer appears in the current ordinance text).International Plumbing Code (IPC), 2021 Edition — including Appendices B, D, E, adopted § 5-I-4 (Revised 6-16-2026) — NOTE: Gillette uses the IPC, not the Uniform Plumbing Code. CHANGED 2026-07-16 audit: edition now reads 2021 (previously 2024 per Ord. 4052, 12-17-2024, no longer cited); appendices B, D, E unchanged.International Mechanical Code (IMC), 2021 Edition — adopted § 5-I-5 (Revised 6-16-2026). CHANGED 2026-07-16 audit: edition now reads 2021 (previously 2024 per Ord. 4052, 12-17-2024, no longer cited).National Electrical Code — City Code § 5-I-6 (Revised 6-16-2026) (including Article 80/Annex H). CHANGED 2026-07-16 audit: the live § 5-I-6.A paragraph now contains two different edition references in the same sentence — "...adopted by reference the National Electrical Code, 2023 Edition..." and later "...of the National Electrical Code, 2026 Edition, including Article 80, are hereby referred to, adopted..." — with the amendment history newly listing Ord. 4081 (6-16-2026) as the latest ordinance for this section. The ordinance's own text does not reconcile the two edition years; previously cited cleanly as 2023 Edition only.International Fuel Gas Code (IFGC), 2021 Edition — including Appendices A, B, C, D, adopted § 5-I-7 (Revised 6-16-2026). CHANGED 2026-07-16 audit: edition now reads 2021 (previously 2024 per Ord. 4052, 12-17-2024, no longer cited); appendices A, B, C, D unchanged.International Fire Code (IFC), 2021 Edition — including Appendices B, C, D, E, F, and G, adopted § 5-I-8 (Revised 6-16-2026). CHANGED 2026-07-16 audit: edition now reads 2021 and Appendices H and I are absent (previously 2024 Edition with Appendices B–I per Ord. 4052, 12-17-2024, no longer cited).International Existing Building Code (IEBC), 2021 Edition — adopted § 5-I-9 (Revised 6-16-2026). CHANGED 2026-07-16 audit: § 5-I-9.A reads "2021 Edition" (previously cited as 2024 Edition; the current text carries no ordinance citation for the edition line).Uniform Code for the Abatement of Dangerous Buildings, 1997 Edition — adopted § 5-I-10 (Revised 6-16-2026); edition unchanged, only the chapter revision date-stamp updated at the 2026-07-16 audit.

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new single-family dwellings and other one- and two-family residential construction in Gillette. Governed by the IRC per City Code § 5-I-3 — live text as of 2026-07-16 reads 2021 Edition (previously 2024 Edition; see codesAdopted). Fee is based on total building square footage per the adopted schedule in City Code § 5-IV-1(b), reverified unchanged 2026-07-16.

Verified 2026-07-16 · Source

Requirements

  • Building permit required for all new one- and two-family residential construction
  • Plans required for all dwellings (no plan review fee is charged for one- and two-family dwellings)
  • Applications and plan sets submitted digitally via EnerGov Self Service portal
  • Foundation plan must be stamped by a Wyoming-licensed engineer, with written verification of footing/foundation type from the soils engineer, submitted before the footing inspection
  • A Foundation Location Certificate prepared and signed by a licensed Wyoming surveyor must be submitted before any inspections beyond sill plate are completed
  • Wyoming 811 (One Call) must be contacted prior to excavation
  • Contractor must hold a current City of Gillette contractor license (Class A/B/R as applicable)

Required documents

  • RequiredBuilding Permit Application (via EnerGov Self Service)Online application/plan submittal through the City of Gillette's EnerGov Self Service portal
  • RequiredFoundation Plan (stamped)Stamped by a Wyoming-licensed engineer; required file for the Building Inspection Division application per the Residential Building Permit Process flow chart
  • RequiredSoils ReportWritten verification from the soils engineer of the required footing/foundation type
  • RequiredArchitectural, Structural, Mechanical, Plumbing, and Electrical PlansFull construction drawing set per the Guideline to 2024 IRC Residential Construction booklet
  • RequiredPlot PlanProperty lines, easements, setbacks, existing/proposed structures, drainage — required by the Planning Division for zoning review

Fee schedule

Fee typeAmountNotes
Building Permit Fee — 0–500 sq ft$30.00City of Gillette Code § 5-IV-1(b), Building Square Feet fee schedule (Revised 6-16-2026)
Building Permit Fee — 500–1,000 sq ft$60.00
Building Permit Fee — 1,000–2,000 sq ft$100.00
Building Permit Fee — 2,000–5,000 sq ft$150.00
Building Permit Fee — over 5,000 sq ft$150.00 + $0.04 per additional square foot
Plan Review Fee (one- and two-family dwellings)No chargeCity Code § 5-IV-1(a): plans required for one- and two-family dwellings carry no plan review fee
Residential Plumbing (new single-family construction, interior)$30.00City Code § 5-IV-3(a)

Residential Addition / Remodel Permit

Verified

Required for additions, structural alterations, remodels, and miscellaneous residential repairs to existing one- and two-family dwellings in Gillette. Governed by the IRC (City Code § 5-I-3) — live text as of 2026-07-16 reads 2021 Edition (previously 2024 Edition; see codesAdopted); fee for additions follows the same building-square-footage table as new construction (reverified unchanged 2026-07-16), while miscellaneous remodels/repairs use a flat $20 fee.

Verified 2026-07-16 · Source

Requirements

  • Additions are permitted under the same building-square-footage fee table as new construction
  • Miscellaneous residential work (remodels, damage repair, residing) is a flat-fee permit
  • Structural additions require stamped plans/calculations as applicable
  • Applications submitted via EnerGov Self Service portal
  • Plot plan required for zoning review of additions that change the building footprint

Required documents

  • RequiredBuilding Permit Application (via EnerGov Self Service)Online application for addition/remodel scope
  • RequiredPlot PlanRequired for additions that change the building footprint; example provided in the Residential Addition Guide
  • RequiredConstruction DrawingsScope, dimensions, structural details, connection to existing structure per the Residential Addition Guide

Fee schedule

Fee typeAmountNotes
Building Permit Fee — additions (by resulting building square footage)$30–$150+$0.04/sq ft — same tiered table as new constructionCity Code § 5-IV-1(b), Building Square Feet fee schedule
Miscellaneous Residential (remodels, damage, repair, or residing)$20.00City Code § 5-IV-1(b)
Basement finish — building permit feeWaived (no charge)City Code § 5-IV-1(b): a building permit is still required to finish a basement, but the building permit fee itself is waived since the square footage was already charged under the original permit; plumbing/mechanical permits to finish the basement are also fee-free unless special circumstances apply (new water heater/furnace, opened floor for drain lines). A standard electrical permit at the standard fee IS required for new circuits/wiring/outlets.

Electrical Permit

Verified

Required for electrical installations, alterations, service changes, and repairs in Gillette. Per the Wyoming State Fire Marshal 'LOCAL AND STATE JURISDICTIONS' chart (ELEC INSP/PR = L/L for Gillette; chart PDF not re-accessible for direct re-verification 2026-07-16, so this delegation claim is carried forward unconfirmed this cycle), the CITY — not the Wyoming State Fire Marshal's electrical program — issues and inspects electrical permits inside city limits, under the NEC adopted by City Code § 5-I-6 — the live text as of 2026-07-16 (Revised 6-16-2026) cites both "2023 Edition" and "2026 Edition" in the same paragraph (see codesAdopted); previously cited cleanly as 2023 Edition. Fee is amperage-based per City Code § 5-IV-2 (reverified unchanged 2026-07-16), plus a Capital Contribution Fee for new/upgraded electrical service (reverified unchanged 2026-07-16).

Verified 2026-07-16 · Source

Requirements

  • Electrical permit required for services, service changes, new circuits, sub-feeders, basement finish wiring, additions, alterations, and repairs
  • Minimum electrical permit fee is $10.00, computed by amperage capacity
  • Maximum fee for single-family residences (including EMHs, townhouses, patio houses) on a privately-owned lot is capped at $40 (0–100 amp) or $50 (101–200 amp)
  • Capital Contribution Fee applies in addition to the permit fee for new or upgraded electrical services
  • Contractor must hold a City of Gillette Class D Electrical contractor license (or Master/Journeyman Electrician license) per City Code Chapter 5, Article III

Required documents

  • RequiredElectrical Permit Application (via EnerGov Self Service)Apply online through the City of Gillette EnerGov Self Service portal

Fee schedule

Fee typeAmountNotes
Electrical Permit — 0 to 60-amp capacity$10.00City Code § 5-IV-2(2)(a) (Revised 6-16-2026)
Electrical Permit — 61 to 100-amp capacity$12.00
Electrical Permit — 101 to 200-amp capacity$13.00
Electrical Permit — each additional 100-amp capacity or fraction$4.00
Electrical Permit — each sub-panel$5.00
Residential Electrical (single-family, privately-owned lot, incl. EMHs/townhouses/patio houses) — 0 to 100-amp capacity (maximum fee)$40.00City Code § 5-IV-2(3)(a)(1)
Residential Electrical (single-family) — 101 to 200-amp capacity (maximum fee)$50.00City Code § 5-IV-2(3)(a)(2)
Capital Contribution Fee — 100 Amp (or upgrade 100 to 200 amp)$175.00City of Gillette Guideline to 2024 IRC Residential Construction — Capital Contribution Fee for new/upgraded service, in addition to the electrical permit fee
Capital Contribution Fee — 200 Amp$350.00
Capital Contribution Fee — 400 Amp$700.00
Capital Contribution Fee — 600 Amp$1,050.00
Demolition of Building — disconnect power service line$10.00City Code § 5-IV-2(5)

Plumbing Permit

Verified

Required for plumbing installations, alterations, and repairs in Gillette. Governed by the International Plumbing Code (IPC) per City Code § 5-I-4 — live text as of 2026-07-16 reads 2021 Edition (previously 2024 Edition; see codesAdopted) — NOTE: Gillette uses the IPC, not the Uniform Plumbing Code used by some other Wyoming/Nevada cities. Fee schedule is per-fixture/per-item under City Code § 5-IV-3(a), reverified unchanged 2026-07-16.

Verified 2026-07-16 · Source

Requirements

  • Minimum plumbing permit fee applies to any plumbing work
  • Per-fixture fee for each fixture, trap, or set of fixtures on one trap (including water, drainage piping, and backflow protection)
  • New single-family construction interior plumbing is billed at a flat rate
  • Contractor must hold a City of Gillette Class D Plumbing contractor license (or Master/Journeyman/Apprentice Plumber license)

Required documents

  • RequiredPlumbing Permit Application (via EnerGov Self Service)Apply online through the City of Gillette EnerGov Self Service portal

Fee schedule

Fee typeAmountNotes
Minimum permit fee$10.00City Code § 5-IV-3(a) (Revised 6-16-2026)
Each plumbing fixture or trap (or set of fixtures on one trap, incl. water, drainage piping, backflow protection)$2.00
Each water heater$10.00
Each industrial waste pre-treatment grease or sand-oil interceptor (incl. trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps)$10.00
Installation, alteration, or repair of water line$10.00
Each lawn sprinkler system and associated backflow protection devices$5.00
Water softeners or treatment systems$10.00
Plumbing repair (any type)$10.00
Sewer line installation and/or repair$10.00
Residential Plumbing — new single-family construction, interior$30.00
Demolition of Building — cap off plumbing at street$10.00

Mechanical / HVAC Permit

Verified

Required for heating, cooling, ventilation, and gas piping installations in Gillette. Governed by the International Mechanical Code (IMC, City Code § 5-I-5) and International Fuel Gas Code (IFGC, § 5-I-7) — live text as of 2026-07-16 reads 2021 Edition for both (previously 2024 Edition; see codesAdopted). Residential new HVAC is a flat unit fee; gas piping is billed by outlet count (reverified unchanged 2026-07-16).

Verified 2026-07-16 · Source

Requirements

  • Residential new HVAC covers up to 2 heating units, A/C unit, vents, ducts, bath fans, dryer vents under one flat fee; additional units are billed per-unit
  • Residential replacement HVAC (furnace, woodstove, heating unit, A/C, boiler) is billed per unit
  • Commercial new/replacement HVAC has its own per-unit and flat-fee structure
  • Gas piping systems are billed by outlet count
  • Contractor must hold a City of Gillette Class D HVAC/Mechanical or Gas Pipefitters contractor license

Required documents

  • RequiredMechanical Permit Application (via EnerGov Self Service)Apply online through the City of Gillette EnerGov Self Service portal

Fee schedule

Fee typeAmountNotes
Residential — New HVAC (up to 2 heating units, A/C unit, vents, ducts, bath fans, dryer vents, fireplaces)$30.00City Code § 5-IV-3(b)(1) (Revised 6-16-2026); $15 per each additional unit
Residential — Replacement: furnace, woodstove, or heating unit (per unit)$15.00
Residential — Replacement: air conditioning or cooling unit (per unit)$15.00
Residential — Replacement: boiler unit (per unit)$15.00
Residential — Miscellaneous (per unit)$15.00
Commercial — New/Replacement: furnace, wood stove, heating unit, A/C window/cooling unit, or boiler unit (per unit)$20.00 each
Commercial — Installation of grease hood or exhaust hood (per unit)$20.00
Commercial — New construction/alteration of Commercial Building HVAC (flat fee: heating unit, venting, ducts, A/C unit, grease hood, bathroom fan, dryer vent)$75.00 flat fee$20 per additional unit
Gas piping system of 1 to 4 outlets$10.00City Code § 5-IV-3(c)
Gas piping system of 5 or more outlets (per outlet)$15.00

Roofing Permit (Reroof)

Verified

Required for roof replacement (reroof) on residential and commercial buildings in Gillette. Governed by IRC Chapter 9 reroofing provisions per City Code § 5-I-3 — live text as of 2026-07-16 reads 2021 Edition (previously 2024 Edition; see codesAdopted); residential reroof is a low flat fee, commercial is a per-square-foot fee (reverified unchanged 2026-07-16).

Verified 2026-07-16 · Source

Requirements

  • Reroofing over 100 sq ft requires a permit
  • Complies with IRC Chapter 9 reroofing/re-covering requirements (structural loads, roof recover limitations, flashing reconstruction) — live-adopted edition as of 2026-07-16 is 2021 (previously 2024)
  • Materials/methods for re-covering or replacing an existing roof covering must comply with Chapter 9 of the adopted residential code

Required documents

  • RequiredRoofing Permit Application (via EnerGov Self Service)Apply online through the City of Gillette EnerGov Self Service portal

Fee schedule

Fee typeAmountNotes
Residential Reroof (shingles and shakes, over 100 sq ft)$10.00City Code § 5-IV-1(b) (Revised 6-16-2026)
Commercial Reroof$0.0050 per square foot

Solar PV Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems in Gillette. There is no separate 'solar' line item in the adopted fee schedule; solar PV installation is processed as a standard building permit (structural/racking, charged under the Building Square Feet table or Miscellaneous Residential fee) plus a standard electrical permit (amperage-based) for the interconnection.

Verified 2026-07-16 · Source

Requirements

  • Rooftop or ground-mounted solar PV installation requires a building permit (structural/racking scope) and an electrical permit (interconnection/wiring scope)
  • Structural design must account for Gillette's local design criteria: 30 psf minimum roof live load (≥15 psf snow load table applies to low-slope roofs at 35 psf), 115 mph ultimate design wind speed, Seismic Design Category B minimum
  • Electrical permit and inspection is handled by the City of Gillette Building Division (Gillette holds delegated electrical authority — ELEC INSP/PR = L/L per the WSFM jurisdictions chart), not the Wyoming State Fire Marshal's electrical program
  • Contractor must hold applicable City of Gillette contractor licenses (Class B/R Building and Class D Electrical)

Required documents

  • RequiredBuilding Permit Application (via EnerGov Self Service) — structural/racking scopeSite plan and racking/structural details for the array
  • RequiredElectrical Permit Application (via EnerGov Self Service) — interconnection scopeElectrical wiring, disconnect, and interconnection details

Fee schedule

Fee typeAmountNotes
Building Permit Fee — solar structural/racking scopeCharged under the Building Square Feet fee table ($30–$150+$0.04/sq ft) or the $20 Miscellaneous Residential fee, as applicableNo separate flat solar-construction fee line exists in the adopted City Code § 5-IV-1(b) fee schedule; a rooftop PV retrofit on an existing home is charged as a 'Miscellaneous Residential' ($20) or amperage-scaled electrical addition, per Building Division practice for scope not creating new conditioned floor area.
Electrical Permit — interconnection (amperage-based)$10–$50+ depending on service amperage — see electrical-permit fee tableCity Code § 5-IV-2

Accessory Dwelling Unit (ADU) Permit

Verified

Gillette's Adopted Zoning Ordinance (Ord. No. 4056, 12/17/2024) has NO dedicated 'Accessory Dwelling Unit' zoning category, definition, or standalone permit type. A full-text search of the current ordinance (SECTION 11. Definitions and all District Standards sections, via online.encodeplus.com/regs/gillette-wy-rewrite) returns only 'Accessory Structure' and 'Accessory Use' as defined terms — there is no ADU-specific use classification, size cap, or parking standard. A secondary living space on a single-family lot is built and permitted under the generic Accessory Structure/Accessory Use standards and the standard residential building permit process for the applicable zoning district (e.g., R-1 Single-Family Residential, R-2 Two-Family Residential).

Verified 2026-07-16 · Source

Requirements

  • No dedicated ADU zoning category exists in Gillette's Adopted Zoning Ordinance (confirmed via full-text search of the current code, Ord. No. 4056, 12/17/2024)
  • A detached or attached secondary structure/living space is evaluated as an 'Accessory Structure' ("a structure located on the same zone lot as the structure containing the primary, permitted use... detached or attached to the primary structure but must be subordinate and customarily incidental to the use of the primary structure") under the applicable residential district's dimensional standards (setbacks, height, lot coverage)
  • Construction is permitted under the standard residential building permit process (IRC — live-adopted edition as of 2026-07-16 is 2021, previously 2024) plus separate electrical/plumbing/mechanical permits as applicable
  • Contact the City Planning Division ((307) 686-5281 — phone reverified 2026-07-16; the City Planning Division page does not publish a direct department email, only a "Send an E-mail" contact form and the general gillette@gillettewy.gov line, so the previously-cited cityplan@gillettewy.gov is unconfirmed and removed as of this audit) BEFORE applying to confirm which zoning district applies to the property and whether a proposed secondary dwelling/living space is allowed as an accessory use there
  • Contact the Building Division ((307) 686-5260) to confirm which building permit types (new construction vs. addition/remodel) apply to the specific project

Required documents

  • RequiredBuilding Permit Application (via EnerGov Self Service)Standard residential building permit process applies; no separate ADU-specific application form exists
  • RequiredSite PlanProperty lines, existing structures, proposed accessory structure location, setbacks — for Planning Division zoning review

Fee schedule

Fee typeAmountNotes
Building Permit Fee (accessory structure/detached living space, by resulting square footage)$30–$150+$0.04/sq ft — same Building Square Feet table as new constructionCity Code § 5-IV-1(b); no separate ADU fee line exists because no dedicated ADU permit type exists
Electrical / Plumbing / Mechanical permits (as applicable)See electrical-permit, plumbing-permit, and mechanical-hvac-permit fee tablesCharged under the same per-type fee schedules as any other residential construction

Demolition Permit

Verified

Required for demolition of buildings or structures in Gillette. Fee is a low flat rate per City Code § 5-IV-1(b); a separate flat fee applies to disconnect the electrical service and to cap off plumbing at the street.

Verified 2026-07-16 · Source

Requirements

  • Building demolition permit required to demolish, move, or substantially alter a structure
  • Electrical service line must be disconnected as part of demolition (separate permit/fee)
  • Plumbing must be capped off at the street as part of demolition (separate permit/fee)
  • Contractor must hold applicable City of Gillette contractor license

Required documents

  • RequiredDemolition Permit Application (via EnerGov Self Service)Apply online through the City of Gillette EnerGov Self Service portal

Fee schedule

Fee typeAmountNotes
Building Demolition Permit$60.00City Code § 5-IV-1(b) (Revised 6-16-2026)
Demolition of Building — disconnect power service line$10.00City Code § 5-IV-2(5)
Demolition of Building — cap off plumbing at street$10.00City Code § 5-IV-3(a)

Commercial Tenant Improvement / Commercial Building Permit

Verified

Required for commercial building construction, tenant improvements, remodels, and alterations in Gillette. Governed by the IBC (City Code § 5-I-2) — live text as of 2026-07-16 reads 2021 Edition (previously 2024 Edition; see codesAdopted); routed through Planning Division site plan review, Building Inspection Division plan review/permit issuance, and (for utility work) Engineering Division review before Certificate of Occupancy.

Verified 2026-07-16 · Source

Requirements

  • Commercial Site Plan Requirements Checklist must be satisfied through the Planning Division before applying for the building permit
  • Plans for buildings with occupant load over 10 must be signed and sealed by a Wyoming-registered professional engineer or architect
  • Complete plan set required: general documents, architectural, structural, electrical (incl. low voltage), civil, plumbing, mechanical, gas line, and fire plans (fire plans routed to Campbell County Fire Department)
  • Plans must show IBC code data analysis on the title sheet: use group classification, construction type, fire-resistive construction, design approach method, height/area calculations, fire protection systems, interior finish, occupant loads, means of egress, and accessibility features
  • Comcheck energy compliance report (2012 IECC or ASHRAE 90.1-2013) required with commercial plans (certain low-hazard occupancy groups exempted)
  • Right-of-way (ROW) permit required from Engineering Division if new water/sewer service connections are needed
  • Miscellaneous commercial remodels up to 500 sq ft use a flat fee; larger commercial projects use the Building Square Feet table
  • Contractor must hold a City of Gillette Class A (General) or Class B (Building) contractor license

Required documents

  • RequiredCommercial Site Plan Requirements ChecklistPlanning Division checklist that must be satisfied before/alongside the building permit application
  • RequiredCommercial Buildings and Structures — Minimum Plan Submittal RequirementsBuilding Inspection Division's checklist of the complete plan set (architectural, structural, electrical, civil, plumbing, mechanical, gas, fire, general sheets)
  • RequiredBuilding Permit Application (via EnerGov Self Service)Digital plan submittal through the City of Gillette EnerGov Self Service portal
  • RequiredFire PlansRouted to Campbell County Fire Department for review

Fee schedule

Fee typeAmountNotes
First Commercial Plan Review (incl. Commercial Master Plans)$100.00City Code § 5-IV-1(a) (Revised 6-16-2026)
Second Commercial Plan Review$200.00
Third Commercial Plan Review$1,125.00
Fourth and any additional Commercial Plan Review$1,500.00 each
Building Permit Fee (by resulting building square footage)$30–$150+$0.04/sq ft — same Building Square Feet table as residentialCity Code § 5-IV-1(b)
Miscellaneous Commercial (remodels up to 500 sq ft)$30.00Larger commercial remodel projects are charged per the Building Square Feet table
Cell and other Towers$100.00
Antenna Co-Locates$100.00
Temporary Job Trailers$30.00
Commercial Reroof$0.0050 per square foot

EV Charger / EVSE Permit

Verified

Required for installation of a residential or commercial electric vehicle charging station (EVSE) in Gillette. As with all electrical work in this jurisdiction, the City of Gillette — not the Wyoming State Fire Marshal's electrical program — issues and inspects the permit inside city limits (WSFM 'LOCAL AND STATE JURISDICTIONS' chart lists Gillette's ELEC INSP/PR as L/L), under the NEC adopted by City Code § 5-I-6. City Code § 5-IV-2 has no distinct EV-charger/EVSE fee line item — a standalone EVSE circuit is billed under the same amperage-based Electrical Permit fee table used for other electrical work, plus the Capital Contribution Fee if the installation involves a new or upgraded electrical service.

Verified 2026-07-20 · Source

Requirements

  • Electrical permit required for the new circuit, sub-panel, or service work needed to install EVSE equipment
  • Minimum electrical permit fee is $10.00, computed by amperage capacity, per City Code § 5-IV-2
  • Maximum fee for single-family residences (including EMHs, townhouses, patio houses) on a privately-owned lot is capped at $40 (0-100 amp) or $50 (101-200 amp)
  • Capital Contribution Fee applies in addition to the permit fee if the EVSE installation requires a new or upgraded electrical service
  • Contractor must hold a City of Gillette Class D Electrical contractor license (or Master/Journeyman Electrician license) per City Code Chapter 5, Article III

Required documents

  • RequiredElectrical Permit Application (via EnerGov Self Service)Apply online through the City of Gillette EnerGov Self Service portal. No separate EV-specific application form was found published.

Fee schedule

Fee typeAmountNotes
Electrical Permit — 0 to 60-amp capacity$10.00City Code § 5-IV-2(2)(a) (Revised 6-16-2026). No EV-charger-specific line item is published; a standalone EVSE circuit is billed under this general amperage-based schedule, the same treatment documented on this jurisdiction's electrical-permit entry.
Electrical Permit — 61 to 100-amp capacity$12.00
Electrical Permit — 101 to 200-amp capacity$13.00
Electrical Permit — each sub-panel$5.00
Residential Electrical (single-family, privately-owned lot) — 0 to 100-amp capacity (maximum fee)$40.00City Code § 5-IV-2(3)(a)(1)
Capital Contribution Fee — 100 Amp (or upgrade 100 to 200 amp)$175.00City of Gillette Guideline to 2024 IRC Residential Construction — applies in addition to the electrical permit fee only if the EVSE installation requires a new or upgraded electrical service.
Capital Contribution Fee — 200 Amp$350.00

Deck Permit

Verified

Required for most residential decks in Gillette under the IRC (live text as of 2026-07-16 reads 2021 Edition; previously 2024 Edition; see codesAdopted). A flat $20 permit fee applies (reverified unchanged 2026-07-16); small, low, detached decks not serving the main exit door are exempt from a building permit (though a zoning permit is generally still required).

Verified 2026-07-16 · Source

Requirements

  • Decks exceeding 200 sq ft, attached to the dwelling, more than 30 inches above grade (within 36 inches of the deck), or serving the main exit door require a building/zoning permit
  • Decks NOT exceeding 200 sq ft, NOT attached to the dwelling, NOT more than 30 inches above grade within 36 inches, and NOT serving the main exit door do not need a building permit (a zoning permit is still required in most instances)
  • Footings: minimum 42 inches deep from finish grade to bottom of footing, 8 inches thick, extending 2 inches beyond post sides on all sides
  • Posts: 4x4 minimum up to 8 ft height; 5x6 required over 8 ft; must rest on footings, secured with a galvanized steel post base or equivalent
  • Decks 18 inches or less above finished grade must use pressure-treated or decay-resistant lumber (measured from the bottom of the floor joists)
  • Ledger boards require proper flashing (stainless steel, UV-resistant plastic, or G-185 galvanized steel) at the connection to the house

Required documents

  • RequiredBuilding/Zoning Permit Application (via EnerGov Self Service)Apply online; plot plan required for zoning review
  • RequiredPlot PlanRequired for zoning; examples available from the Building Inspection Division

Fee schedule

Fee typeAmountNotes
Deck$20.00City Code § 5-IV-1(b) (Revised 6-16-2026)

Basement Finish Permit

Verified

Required to finish a basement in Gillette, but the building permit fee itself is waived because the building square footage was already charged under the original construction permit. Plumbing and mechanical permits are also fee-free unless special circumstances apply; a standard-fee electrical permit is required for new wiring.

Verified 2026-07-16 · Source

Requirements

  • A building permit is required to finish a basement, but City Code § 5-IV-1(b) waives the building permit fee itself
  • Plumbing and mechanical permits to finish the basement are fee-free UNLESS special circumstances apply (e.g., the basement floor must be opened to install new plumbing drain lines, or a new hot water heater or furnace is installed)
  • A standard electrical permit, at the standard amperage-based fee, IS required for the addition of new electrical circuits, wiring, and outlets to finish a basement
  • Standard inspections from the Building Division are still conducted and all work must comply with the codes enforced by the City of Gillette

Required documents

  • RequiredBuilding Permit Application (via EnerGov Self Service)Standard application; fee waived per City Code § 5-IV-1(b)

Fee schedule

Fee typeAmountNotes
Building Permit Fee — basement finishWaived (no charge)City Code § 5-IV-1(b) (Revised 6-16-2026): waived because building square footage was already charged under the original construction permit
Plumbing/Mechanical Permit Fee — basement finish (standard scope)Waived (no charge)Unless special circumstances apply (opened floor for drain lines, new water heater or furnace installed), in which case standard plumbing-permit/mechanical-permit fees apply
Electrical Permit — basement finish (new circuits/wiring/outlets)Standard amperage-based fee applies — see electrical-permit fee tableCity Code § 5-IV-1(b): "A standard electrical permit is required with the standard fee for the addition of new electrical circuits as well as for electrical wiring and new outlets to finish a basement."

Sign Permit

Verified

Required for most signs erected, altered, or maintained within Gillette city limits. Governed by the current Adopted Zoning Ordinance (Ord. No. 4056, 12/17/2024), Section 8 (Signs) — Zoning Administrator approval is required and the application is filed through the Building Division's EnerGov Self Service portal; the City Code Chapter 5, Article IV fee schedule (Revised 6-16-2026) sets a flat $30 permit fee for signs (including LED, but not video signs).

Verified 2026-07-22 · Source

Requirements

  • All signs within the corporate limits must be approved by the Zoning Administrator (Section 8.a.2) before erection, alteration, or continued maintenance
  • Application must include a scaled drawing showing height, width, total square footage, and location of the sign on the property; sign permits are filed via EnerGov Self Service
  • Exempt from a permit (Section 8.a.3): signs required by federal/state/local law; one wall-mounted nameplate sign ≤2 sq ft; cornerstones, driveway crossbars, personalized stone plaques, decorative residential ID signs, or historical markers; window displays of actual merchandise; informational/directional signs; danger/warning signs; traffic signs; business-door lettering; window signs in commercial/industrial districts; and temporary signs meeting the size/duration limits below
  • Temporary signs: not allowed in public right-of-way/publicly-owned property/parks/drainageways/utility poles or where they obstruct a sight triangle; must sit on private property; residential-district temporary signs ≤6 sq ft and not illuminated; commercial/industrial-district temporary signs ≤10 ft height and ≤64 sq ft; all temporary signs must be removed within 10 days of the advertised event
  • Prohibited: revolving beacon/fountain/flashing signs that could distract motorists (Zoning Administrator's discretion); signs interfering with traffic-control devices; overhanging/free-standing signs extending over public right-of-way (except approved public traffic/directional devices); signs/banners placed in the public right-of-way; signs or advertising devices attached to a vehicle/trailer parked to advertise a product or business
  • Permitted sign types (Billboard, Building Sign, Free-Standing, Center Identification, Sandwich Board, Projecting, Residential Development, Bulletin, Off-Premises, Inflatable, Illuminated, Flashing) vary by zoning district per Table a.A of Section 8 — most are prohibited in residential districts
  • Billboards have additional standards (Section 8.b): size/height/face/spacing tables by type (static double-face, static V-face, electronic, tri-face), must be designed and certified by a Wyoming-licensed Professional Engineer, require a City Building Division building permit for the billboard structure in addition to the Zoning Administrator's sign approval, and the owner must post a nameplate with a 24-hour emergency contact number
  • A lighted/electrified sign that requires new circuits or wiring also needs a standard electrical permit (see electrical-permit entry), which carries its own $10 minimum fee plus a $10 'each lighted sign' special-installation charge under City Code § 5-IV-2(4)(c)

Required documents

  • RequiredSign Permit Application (via EnerGov Self Service)Scaled drawing of the proposed sign showing height, width, total square footage, and location on the property, per Zoning Ordinance Section 8.a.2
  • OptionalEngineering Specifications / PE-stamped Structural Plans (billboards and free-standing pole signs)Billboard structures must be designed and certified by a Wyoming-licensed Professional Engineer; a City Building Division building permit is required for the billboard structure itself (Section 8.b.1.e)

Fee schedule

Fee typeAmountNotes
Sign Permit (includes LED, not video)$30.00City Code § 5-IV-1(b) (Revised 6-16-2026), Article IV fee table
Electrical Permit — lighted sign special installation surcharge (if new wiring/circuit is added for the sign)$10.00City Code § 5-IV-2(4)(c), in addition to the $10.00 base electrical permit charge — see electrical-permit entry for the full electrical fee table

Fire Sprinkler System Permit

Verified

Required for installation of a fire sprinkler system in Gillette. The City of Gillette collects a flat $30 permit fee, but — unlike every other permit type in this jurisdiction — the City Code fee table itself states that the Campbell County Fire Department (CCFD), not the City Building Division, performs the plan check and inspections. CCFD's plan-review submittal uses the Wyoming State Fire Marshal's Office (WSFO) Fire Sprinkler System checklist.

Verified 2026-07-22 · Source

Requirements

  • City Code § 5-IV-1(b) fee table lists the line item verbatim: "Fire Sprinkler Systems Campbell County Fire Department performs the plan check and inspections. $30" — the City collects the fee, CCFD performs the technical review and inspections
  • Plan submittals must follow the Wyoming State Fire Marshal's Office (WSFO) Fire Sprinkler System plan-review checklist; CCFD states that if a submittal is missing required information, the review cannot be completed and a resubmittal is required
  • CCFD inspection scheduling requires at least 48 hours advance notice (call (307) 682-5319); published CCFD construction-inspection types for sprinkler work include "sprinkler rough in" and "sprinkler hydro"
  • Fire plans for new commercial construction are also routed to CCFD as part of the standard Commercial Tenant Improvement/Commercial Building Permit submittal (see that entry) — a standalone fire-sprinkler-only project follows the same CCFD review path
  • A contractor installing a RESIDENTIAL fire suppression/sprinkler system must hold a City of Gillette Residential Fire Suppression System license (City Code § 5-III-24, § 5-III-25) — $50 new, $50 renewal annually, per § 5-III-27's fee schedule
  • Commercial/industrial fire sprinkler installers are licensed under the City's Class F Fire Suppression contractor classification (City Code Chapter 5, Article III); the Board of Examiners' reciprocity provisions (§ 5-III-1(d)(2)) accept proof of NICET, American Fire Sprinkler Association, or National Fire Sprinkler Association certification in lieu of City testing for fire-systems work

Required documents

  • RequiredFire Sprinkler System Plan Review Submittal (per WSFO checklist, routed to CCFD)Submitted per the Wyoming State Fire Marshal's Office Fire Sprinkler System checklist; reviewed by Campbell County Fire Department, not the City Building Division
  • RequiredBuilding Permit / Fire Plans (via EnerGov Self Service)For new construction, fire sprinkler plans are submitted alongside the commercial building permit application and routed to CCFD

Fee schedule

Fee typeAmountNotes
Fire Sprinkler System Permit$30.00City Code § 5-IV-1(b) (Revised 6-16-2026) — fee collected by the City; plan check and inspections performed by Campbell County Fire Department. No separate CCFD-published review fee was found on the City or CCFD sites as of this 2026-07-22 chase; confirm directly with CCFD at (307) 682-5319 if a distinct CCFD charge applies to a specific project.
Residential Fire Suppression System Contractor License — New$50.00City Code § 5-III-27 fee schedule; annual license, separate from the per-project permit fee
Residential Fire Suppression System Contractor License — Renewal$50.00City Code § 5-III-27 fee schedule

Fire Alarm System Permit

Required for installation of a commercial/industrial fire alarm system in Gillette. Campbell County Fire Department (CCFD) lists "Fire Alarm System" as its own distinct plan-review category (separate from Fire Sprinkler System) and "fire alarm acceptance" as its own distinct construction-inspection type — but unlike fire sprinkler systems, Gillette's City Code Chapter 5, Article IV fee schedule has NO dedicated fire-alarm fee line item. This is a genuine, confirmed gap after a full read of the adopted fee schedule, not an omission in this entry.

Reviewed 2026-07-22 · Source

Requirements

  • Campbell County Fire Department's published Plan Review list separately names "Fire Alarm System" alongside "Fire Sprinkler System" as its own plan-review category, using Wyoming State Fire Marshal's Office (WSFO) checklist forms for the submittal
  • CCFD states that if a submittal is missing required information, the review cannot be completed and a resubmittal is required
  • "Fire alarm acceptance" is listed as its own CCFD construction-inspection type, distinct from the sprinkler rough-in/hydro inspections
  • CCFD inspection scheduling requires at least 48 hours advance notice (call (307) 682-5319)
  • Fire alarm plans for new commercial construction are also routed to CCFD as part of the standard Commercial Tenant Improvement/Commercial Building Permit submittal (see that entry)
  • City Code Chapter 5, Article III's contractor-license structure (Article III sections A-H) has no dedicated fire-alarm contractor license category — alarm/low-voltage work is typically performed under state-level licensure rather than a City of Gillette trade license; confirm current requirements with the Building Division at (307) 686-5260

Required documents

  • RequiredFire Alarm System Plan Review Submittal (per WSFO checklist, routed to CCFD)Submitted per the Wyoming State Fire Marshal's Office Fire Alarm System checklist; reviewed by Campbell County Fire Department
  • RequiredBuilding Permit / Fire Plans (via EnerGov Self Service)For new construction, fire alarm plans are submitted alongside the commercial building permit application and routed to CCFD

Fee schedule

Fee typeAmountNotes
Fire Alarm System Permit feeNot publishedA full read of City Code Chapter 5, Article IV (§ 5-IV-1 through § 5-IV-3, the complete adopted fee schedule as of the 6-16-2026 revision) turned up a dedicated $30 line item for "Fire Sprinkler Systems" but NO corresponding line item for fire alarm systems. This is reported as a confirmed gap, not a fabricated or assumed fee — do not assume the $30 sprinkler fee also covers fire alarm systems. Confirm current fee treatment directly with the Building Division ((307) 686-5260) or CCFD ((307) 682-5319) before budgeting.

Certificate of Occupancy / Change of Use

Verified

Gillette has NO stand-alone 'Change of Use Permit' or separate 'Certificate of Occupancy' application/fee in City Code Chapter 5. A change to a building's occupancy classification is governed by the adopted International Existing Building Code (IEBC, 2021 Edition, City Code § 5-I-9), which by its own scope regulates the repair, alteration, change of occupancy, addition, and relocation of existing buildings. A Certificate of Occupancy (CO) or Temporary Certificate of Occupancy (TCO) is issued by Building Inspection as the FINAL STEP of the standard building-permit process — shown as the terminal 'TCO/CO — CERTIFICATE OF OCCUPANCY — BUILDING INSPECTION' box on the City's own Commercial Building Permit Process flow chart — not as an independently-applied-for product with its own line item in the § 5-IV fee schedule.

Verified 2026-07-22 · Source

Requirements

  • No dedicated 'Change of Use' or 'Certificate of Occupancy' permit type or fee line exists anywhere in City Code Chapter 5, Article IV (confirmed by a full read of the adopted fee schedule, Revised 6-16-2026)
  • A proposed change in use/occupancy classification for an existing building is evaluated by the Building Division under the adopted IEBC (2021 Edition, § 5-I-9); whether the change triggers permitted construction work depends on the specific occupancy-classification change and any life-safety/structural upgrades the IEBC requires for it
  • If the change involves only minor commercial remodel work (≤500 sq ft, no new floor area), it is typically processed under the flat $30 'Miscellaneous Commercial' fee (City Code § 5-IV-1(b)) rather than a full commercial plan review
  • If the change triggers a fuller scope of work, it follows the standard Commercial Tenant Improvement/Commercial Building Permit process (Planning Division site plan review → Building Inspection Division plan review/permit → Engineering Division ROW review if needed) — see the commercial-tenant-improvement-permit entry for that process and fee table in full
  • Fire plans for the new occupancy are routed to Campbell County Fire Department as part of the Building Inspection Division submittal, same as any other commercial building permit
  • The Commercial Building Permit Process flow chart's terminal step is 'TCO/CO Certificate of Occupancy — Building Inspection', issued after Council acceptance of utilities (if applicable) and Final Location Certificate (FLC) submittal to Planning/GIS — there is no separate CO application box on the flow chart
  • Contact the Building Division ((307) 686-5260) before opening a new tenant space or business in an existing building to confirm whether the proposed new use/occupancy classification requires permitted work and, if so, which permit type(s) apply

Required documents

  • RequiredWhichever permit application matches the triggered scope of work (via EnerGov Self Service)No separate change-of-use/CO application form was found published; use the Building Permit Application (Miscellaneous Commercial or full commercial submittal, as applicable)

Fee schedule

Fee typeAmountNotes
Change of Use / Certificate of Occupancy — dedicated feeNone publishedNo dedicated fee line exists in City Code § 5-IV. Depending on the scope of any triggered work, fees fall under the Miscellaneous Commercial fee ($30, City Code § 5-IV-1(b)) or the standard Building Square Feet / Commercial Plan Review fee tables — see the commercial-tenant-improvement-permit entry for those tables in full.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Gillette building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-01)View current record →All versions →

Permalink: /wyoming/campbell-county/gillette/as-of/2026-07-17/

Snapshot date: 2026-07-17

Commit: 0fd24e8

Reproducible from PermitBase’s version-controlled dataset, commit 0fd24e8.