You are viewing the permanent link for the record currently in effect, published 2026-07-17.
Riverton building permits
VerifiedRiverton, Wyoming — as published 2026-07-17.
Verified 2026-07-01 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family dwellings, manufactured homes on permanent foundations (IRC or HUD standard), and accessory buildings/additions/covered decks in the City of Riverton. Governed by the 2024 IRC (Riverton Municipal Code Chapter 15.04, Ordinance No. 25-003).
Verified 2026-07-01 · Source
Requirements
- Submit a completed Application for Building Permit (or Simple Permit Application for smaller scopes)
- Submit two (new residential checklist) or three (per the application's submittal checklist) complete sets of plans and specifications, or one electronic copy
- Site plan showing property lines, north arrow, easements, dimensions, and all development
- Floor plans, building elevations (N/S/E/W), foundation plan, roof/truss plan with engineered truss data
- Framing sections (wall height, eave width, roof pitch) and other construction details
- A letter from the Director of Public Works certifying availability of water and sewer service for the land (RMC § 15.04.010.A.1.a(4))
- Engineering calculations required for any design deviating from conventional IBC/IRC framing, stamped by a Wyoming-licensed architect/engineer
- Projects requiring professional design: most new commercial/industrial buildings, buildings 3+ stories, residential buildings with 5+ living units
- Automatic sprinklers NOT required for detached one- and two-family dwellings or townhouses built to the IRC (locally amended IBC § 903.2.8 exception)
- Planning Division approval of setbacks (RMC § 17.16.070) required before building permit submittal
Required documents
- RequiredApplication for Building PermitCity of Riverton Community Development Department application form; covers building, plumbing, electrical, and mechanical scope on one combined form
- RequiredResidential/Commercial Plan Submittal Checklist for Building PermitsCity's checklist of required drawings/documents for new residential and commercial construction
- RequiredSite PlanScaled site plan with property lines, building outline, adjacent streets, easements, dimensions
- RequiredConstruction DrawingsComplete floor plans, elevations, foundation plan, framing sections, and roof/truss plan
- OptionalTruss Layout and CalculationsTwo copies, signed and sealed by a Wyoming-licensed engineer, if applicable
- OptionalEngineering CalculationsTwo copies, signed/sealed by architect/engineer of record, for any non-conventional structural design
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| New Residential Construction (IRC or HUD-standard manufactured home with permanent foundation, accessory buildings, additions, covered decks, attached garages) | $0.42 per square foot of building area (includes building and all building systems) | City of Riverton Resolution No. 1355 (adopted May 16, 2017; current fee resolution per RMC § 15.04.030), Category 2.A |
| Storage units, pole barns, post frame, detached garage, deck additions, decks, carports, similar structures (residential) | $0.13 per square foot of building area, $32.00 minimum | Resolution No. 1355, Category 2.B |
| Plan Review Fee — In House | 10% of the Building Permit Fee based on valuation, $52.00 minimum | Resolution No. 1355, Category 8.B |
| Plan Review Fee — Third Party | Actual cost | Resolution No. 1355, Category 8.A |
| Foundation-Only Permit | $130.00 (additional fees for the subsequent building permit required per IBC/IRC R106.3.3) | Resolution No. 1355, Category 9 |
Residential Addition / Remodel Permit
VerifiedRequired for additions, alterations, and remodels to existing residential structures in Riverton, including equipment/material replacement and structural changes. Charged under the alterations category of the adopted fee schedule (Resolution No. 1355).
Verified 2026-07-01 · Source
Requirements
- Alterations per square footage of alteration area, or $50.00 minimum
- Equipment/material including labor charged at 1% of contract amount for the alteration category, subject to type-specific minimums (siding/soffit/facia/gutter $25 min; mechanical equipment replacement $52 min; window/door replacement without structural alteration needs a permit but no fee, with structural alteration $52 min)
- Plans must show scope, dimensions, structural details, and connection to the existing structure
- Planning Division approval of setbacks required before permit submittal for additions
Required documents
- RequiredApplication for Building PermitSame combined application form used for new construction; select Addition/Alteration construction type
- RequiredSite PlanProperty lines, existing structures, proposed addition footprint, setbacks
- RequiredConstruction DrawingsPlans showing scope of addition/alteration including framing and MEP as applicable
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Alterations (IBC/IRC/HUD Standard) — minimum | $50.00 minimum | Resolution No. 1355, Category 3 |
| Alterations per square footage | $0.42 per square foot of alteration area | Resolution No. 1355, Category 3.A |
| Siding, soffit, facia & gutter | 1% of contract amount, $25.00 minimum | Resolution No. 1355, Category 3.B.1 |
| Window/Door Replacement (no structural alteration) | Permit required, no fee | Resolution No. 1355, Category 3.E |
| Window/Door Replacement (with structural alteration) | $52.00 minimum | Resolution No. 1355, Category 3.E |
| Relocation of Structure | $0.13 per square foot | Resolution No. 1355, Category 3.D |
Electrical Permit
VerifiedRequired for electrical wiring installation, alteration, or repair in the City of Riverton. Per the Wyoming Dept. of Fire Prevention & Electrical Safety 'LOCAL AND STATE JURISDICTIONS' chart, Fremont County's ELEC columns are marked S/S (state) at the COUNTY level — but Riverton's own Municipal Code shows the CITY itself independently adopted the National Electrical Code by dynamic reference to 'the latest edition' (RMC § 15.08.110(B)(2); Chapter 15.08 'Electrical Code') — currently the 2026 NEC, effective statewide July 1, 2026 per wsfm.wyo.gov/electrical-safety (the 2023 NEC applied from July 1, 2023 until then) — and operates its own electrical permitting and inspection program under a city Electrical Inspector, distinct from the unincorporated-county default. The State of Wyoming (WSFM) continues to license individual electrical contractors/journeymen statewide, but inside Riverton city limits it is the CITY that issues the wiring permit and performs rough/final inspections.
Verified 2026-07-01 · Source
Requirements
- Permit required for installation, alteration, addition, or repair of electrical wiring, devices, or equipment (RMC § 15.08.080)
- Issued only to a licensed Wyoming electrical contractor registered with the City of Riverton, OR to a homeowner performing work with their own hands in their own owner-occupied one-family dwelling (RMC § 15.08.080.A.1–2)
- Electrical contractors must hold a current Wyoming electrical contractor's license (state-issued) AND register with the City of Riverton (RMC § 15.08.050)
- Temporary electric service (temporary meter base with approved grounding) may be installed by a licensed contractor or homeowner and requires a temporary-service inspection
- Rough electric inspection required after all wiring and boxes are installed, before insulation/sheetrock
- Certain minor work is exempt from permitting per NEC Article 80 Section 80.19 (e.g., portable cord-and-plug appliances, like-for-like fixture/overcurrent-device replacement, low-voltage Class 2/3 circuits under 25V/50W) — RMC § 15.08.080.A.5
- Riverton's own Electrical Code (RMC § 15.08.110(B)(2)) adopts 'the latest edition' of the NEC by dynamic reference — currently the 2026 NEC, effective statewide July 1, 2026 per WSFM, matching the statewide default edition (the 2023 NEC applied from July 1, 2023 until then)
Required documents
- RequiredApplication for Building PermitRiverton's combined application form includes an ELECTRICAL section (wiring modifications, service upgrade, panel modification, meter modification/relocation, electrical service size)
- RequiredContractor RegistrationWyoming-licensed electrical contractors must register with the City of Riverton before pulling permits (RMC § 15.08.050)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Service Upgrade (residential) | $52.00 minimum | City of Riverton Resolution No. 1355, Category 3.B.2 (charged under the general alterations fee category, no separate electrical-only fee table) |
| Electrical Alteration | $26.00 minimum | Resolution No. 1355, Category 3.B.3 |
| New electrical service tied to new construction | Included in the $0.42/sq ft (residential) or $0.53/sq ft (commercial) new-construction building permit fee — covers the building and ALL building systems, including electrical | Resolution No. 1355, Categories 1.A and 2.A note: fee 'includes building and all building systems' |
Plumbing Permit
VerifiedRequired for plumbing installations, alterations, and repairs in Riverton. Governed by the 2024 International Plumbing Code with local amendments (RMC Chapter 15.04), including simplified rough-in testing procedures.
Verified 2026-07-01 · Source
Requirements
- Plumbing alteration, sanitary sewer replacement, gas line testing, water heater installation/replacement
- DWV systems (underslab only) tested on completion of rough piping by water (10 ft head, 15 min hold) or air (5 psi / 10 in. Hg, 15 min hold) test — Schedule 40 PVC allowed to be tested with air (locally amended IPC §§ 312.1, 312.3 and IRC § P2503.5.1)
- Backflow prevention: required check valve and expansion tank status noted on the application form
- Water tap size 2 inches or greater requires DEQ (Wyoming Dept. of Environmental Quality) review
Required documents
- RequiredApplication for Building PermitCombined application form; PLUMBING section covers alteration, sanitary sewer replacement, gas line testing, water heater type
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plumbing Alteration | $26.00 minimum | City of Riverton Resolution No. 1355, Category 3.B.5 |
| Water Heater Replacement (residential) | $26.00 minimum | Resolution No. 1355, Category 3.B.6 |
| Gas Piping Test | $26.00 per test or trip | Resolution No. 1355, Category 3.B.7 |
| Water or Sewer Replacement | $52.00 | Resolution No. 1355, Category 3.B.8 |
Mechanical / HVAC Permit
VerifiedRequired for heating, cooling, ventilation, and equipment replacement in Riverton. Governed by the 2024 International Mechanical Code (RMC Chapter 15.04/15.12).
Verified 2026-07-01 · Source
Requirements
- Mechanical equipment replacement, new system installation, or alteration
- Gas piping installation requires gas piping test inspection
- Combined application form covers MECHANICAL scope (new system, alteration, component replacement)
Required documents
- RequiredApplication for Building PermitCombined form; MECHANICAL section covers new system, alteration, or component replacement
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Mechanical (Equipment Replacement) | $52.00 minimum | City of Riverton Resolution No. 1355, Category 3.B.4 |
Roofing Permit (Reroof)
VerifiedRequired for roof replacement (reroofing) exceeding 100 sq ft on residential structures, and for commercial reroofing, in the City of Riverton.
Verified 2026-07-01 · Source
Requirements
- Residential reroof over 100 sq ft in area requires a permit
- Commercial reroof charged as a percentage of contract amount
Required documents
- RequiredApplication for Building PermitSelect re-roof as the construction type
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Residential Reroof (area > 100 sq ft) | $52.00 | City of Riverton Resolution No. 1355, Category 4 |
| Commercial Reroof | 1% of contract amount | Resolution No. 1355, Category 4 |
Solar PV Permit
VerifiedRequired for installation of rooftop or ground-mounted solar photovoltaic systems in Riverton. Zoning treats a solar energy system as part of the building for height and lot-area purposes (RMC Chapter 17.24); construction is permitted under the standard building/electrical permit process.
Verified 2026-07-01 · Source
Requirements
- Solar panels and related installation equipment shall not exceed the height limitation for the applicable zoning district (RMC § 17.24.020.A)
- Solar energy system is considered part of the building and counts toward lot area/coverage limitations for the zoning district (RMC § 17.24.020.B)
- Electrical scope (interconnection wiring, inverter, disconnects) requires an electrical permit under RMC Chapter 15.08
- Structural evaluation of the roof/racking attachment recommended given Riverton's 30 psf ground snow load and 100 mph wind design speed (RMC § 15.04.040 local design criteria)
Required documents
- RequiredApplication for Building PermitCombined form covering building/structural and electrical scope for the solar installation
- RequiredElectrical PlanSingle-line diagram, load calculations, disconnect location — required for electrical permit review
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Solar Installation — no dedicated fee line in Resolution No. 1355 | Charged under the applicable general valuation/alteration fee category (new construction $0.42–$0.53/sq ft if part of new build, or the Electrical Alteration/Service Upgrade minimums if a standalone retrofit) | City of Riverton Resolution No. 1355 does not list a solar-PV-specific line item; per the framework's 'general valuation table' rule this is a verified fee treatment, not a gap — confirm exact classification with the Building Department at (307) 856-2999 |
Accessory Dwelling Unit (ADU) Permit
VerifiedThe City of Riverton has NO dedicated Accessory Dwelling Unit ordinance, definition, or permit category in its Zoning Code (Title 17, ecode360, chapters 17.04 through 17.88 reviewed in full). 'Accessory building/use' in Riverton's code means a subordinate NON-DWELLING structure (shed, garage, storage building) — not a secondary living unit. The closest legal pathway to a second housing unit on one lot is the R-2 Residential District, which permits 'multiple-family dwellings containing not more than two living units' (RMC § 17.32.010.A) as a true duplex — each unit independently meeting the district's own minimum floor area (425 sq ft per unit) — built and permitted as standard new residential construction, not as an accessory/ADU pathway.
Verified 2026-07-01 · Source
Requirements
- No ADU-specific zoning category exists; R-1, R-2A, and R-4 districts have no provision for a secondary dwelling unit on a single-family lot
- R-2 Residential District (RMC § 17.32.010–.040) permits a duplex (two full living units) as a permitted use: minimum lot area 5,000 sq ft, maximum 2 living units per lot, each unit minimum 425 sq ft floor area, max 40% lot coverage by main + accessory buildings, paved parking/driveway required for multi-family
- A true second unit in Riverton must be built under the standard residential building permit process for the applicable zoning district (R-2 for a duplex) — there is no owner-occupancy requirement, no size-ratio-to-primary-structure limit, and no distinct 'ADU' fee
- Property must first be confirmed as zoned R-2 (or petitioned for rezone) — R-1 does not allow a second dwelling unit
Required documents
- RequiredApplication for Building PermitSame combined application used for any new residential construction; no ADU-specific form exists
- RequiredZoning VerificationConfirm R-2 zoning designation with the Community Development Department's Planning & Zoning division before applying
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| New Residential Construction (duplex, per RMC R-2 district) — same as residential-building-permit | $0.42 per square foot of building area (includes building and all building systems) | City of Riverton Resolution No. 1355, Category 2.A — no separate ADU fee line exists because no ADU category exists |
Demolition Permit
VerifiedRequired for demolition of structures within the City of Riverton, charged per square foot under the general alterations fee category (Resolution No. 1355).
Verified 2026-07-01 · Source
Requirements
- Demolition permit required for removal of any structure subject to the building code
- Charged at $0.13 per square foot (same rate tier as storage/accessory structure fees)
- Utility disconnects should be coordinated with Public Works prior to demolition
Required documents
- RequiredApplication for Building PermitSelect 'Demolition' as the construction type on the combined application form
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Demolitions | $0.13 per square foot | City of Riverton Resolution No. 1355, Category 3.C |
Commercial Tenant Improvement Permit
VerifiedRequired for interior build-out, remodeling, or alteration of commercial spaces in Riverton. Charged under the New Commercial Construction / Alterations valuation-per-square-foot categories of Resolution No. 1355, with a more detailed submittal checklist than residential projects.
Verified 2026-07-01 · Source
Requirements
- Three complete sets of construction drawings carrying the seal of a Wyoming-licensed architect/engineer (or one electronic copy), per the New Commercial Construction Submittal Checklist
- Cover sheet indicating scope of work, applicable codes, construction type, and occupancy/code analysis
- Site plan showing utility connections to city sewer, storm drain, and water
- Floor plans with occupancy, egress, and dimension detail
- Structural, plumbing/mechanical, and electrical plans (electrical plans must include a complete one-line diagram)
- Energy code compliance forms imprinted on full-size plan sheets; accessibility compliance
- Food processing/manufacturing facilities must separately contact Consumer Health Services (307-777-7211) for review before construction
- Fire-resistive construction and required fire protection system details, plus a Geotechnical Report if applicable
- Hazardous Materials Disclosure form (OES form) required for applicable occupancies
Required documents
- RequiredApplication for Building PermitSame combined form; select Commercial + Alteration of Structure
- RequiredNew Commercial Construction Submittal ChecklistDetailed checklist of required plan sheets and supporting documents for commercial projects/remodels
- OptionalHazardous Materials Disclosure (OES form)Required for occupancies handling hazardous materials
- OptionalAccessibility For Existing Buildings Compliance formRequired if applicable to the scope of work
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| New Commercial Construction (including warehouses) | $0.53 per square foot of building area (includes building and all building systems) | City of Riverton Resolution No. 1355, Category 1.A |
| Storage units, pole barns, post frame, detached garage, deck additions, carports, similar structures (commercial) | $0.13 per square foot of building area, $30.00 minimum | Resolution No. 1355, Category 1.B |
| Alterations (commercial tenant improvement) | $0.42 per square foot of alteration area, $50.00 minimum | Resolution No. 1355, Category 3.A |
| Communication Facilities (cell buildings/towers) | $325.00 | Resolution No. 1355, Category 5 |
| Third Party Plan Review Fees | Actual cost | Resolution No. 1355, Category 8.A |
Fence Permit
VerifiedRequired for fences installed in the right-of-way or front-yard area, or exceeding 7 feet in height, in the City of Riverton. Fences not exceeding 7 feet installed entirely on the owner's property do not require a permit.
Verified 2026-07-01 · Source
Requirements
- Fences not exceeding 7 feet in height and installed on the owner's own property: no permit required
- Fences installed in the right-of-way area: permit required
- Fences exceeding 7 feet in height: permit required, engineering may be required
Required documents
- RequiredFence Permit ApplicationPart of the standard permit application process; contact Community Development for the specific form
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Fence Installed in Right-of-Way | $26.00 | City of Riverton Resolution No. 1355, Category 10.A |
| Fences Exceeding 7 Feet in Height (engineering required) | $26.00 | Resolution No. 1355, Category 10.B |
| Fences Not Exceeding 7 Feet, Installed on Owner's Property | No permit required | Resolution No. 1355, Category 10.C |
EV Charging Station Permit (Electrical Permit)
VerifiedRequired for installation of a Level 2 (or higher) electric vehicle charging station/EVSE within Riverton city limits, permitted under the City's standard Electrical Permit process (RMC Chapter 15.08). City of Riverton Resolution No. 1355 has no dedicated EV charger/EVSE fee line item — the same finding this file's solar-pv-permit entry documents for solar — so an EV charger circuit is charged under the general Electrical Alteration or Electrical Service Upgrade fee categories, whichever fits the scope of work.
Verified 2026-07-20 · Source
Requirements
- Electrical permit required for the new/upgraded circuit and EVSE connection under RMC Chapter 15.08
- Installation must comply with NEC Article 625 (Electric Vehicle Power Transfer System) as adopted by the City
- A standalone new dedicated circuit for an EVSE is expected to fall under the 'Electrical Alteration' fee category; a project also requiring a panel/service upgrade would fall under 'Electrical Service Upgrade' instead
- If installed as part of new construction, the EV charger circuit is covered by the new-construction per-square-foot fee, which 'includes building and all building systems' per Resolution No. 1355
Required documents
- RequiredApplication for Building PermitCombined form covering the electrical scope for the EV charger installation
- RequiredElectrical PlanSingle-line diagram, load calculations, and disconnect location — required for electrical permit review
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Electrical Alteration — closest published category for a new EV charger circuit | $26.00 minimum | City of Riverton Resolution No. 1355, Category 3.B.3 — no dedicated EV/EVSE line item exists; this is the general 'alteration' category (adding a circuit to existing wiring) rather than a full service upgrade. If a panel/service upgrade is also needed, 'Electrical Service Upgrade' ($52.00 minimum, Category 3.B.2) would apply instead. Confirm exact classification with the Building Department at (307) 856-2999. |
Sign Permit
VerifiedRequired for most permanent signs (wall, ground, pole, monument, LED, billboard-class, etc.) installed within the City of Riverton. Governed by Riverton Municipal Code Chapter 17.22 'Signs,' which uses the IBC as its base code and adds local height, size, location, and design rules; charged under a dedicated per-square-foot fee category in Resolution No. 1355 (Category 7).
Verified 2026-07-22 · Source
Requirements
- A building permit is required for all signs EXCEPT inflatable signs, hand-carried signs, carnival/county fair signs, banners, placard signs, and political election/campaign signs, plus any exemptions separately listed in the IBC (RMC § 17.22.110)
- Signs requiring a permit must be designed and constructed for a 90 mph wind load, with the design stamped by a structural engineer (RMC § 17.22.100.B)
- Commercial ground/pole sign height (measured from mean ground level): 40 ft max on the Federal Blvd corridor north of Webbwood/south of Monroe; 30 ft max on the Federal Blvd corridor south of Webbwood/north of Monroe and on the Main Street corridor; 20 ft max on all other commercially zoned property (RMC § 17.22.050.A)
- Residential ground/pole sign height: 4 ft max, except flagpoles (RMC § 17.22.050.B)
- Maximum sign face area: 200 sq ft per face generally; 2 sq ft for a home-occupation ID sign; 1 sq ft for a home address/occupant ID sign; 6 sq ft per face for temporary signs (realtor, garage sale, etc.) (RMC § 17.22.060)
- Billboards (freestanding signs exceeding 200 sq ft of facing) are prohibited citywide (RMC § 17.22.150)
- Signs on residential-zoned property are restricted to specific temporary (campaign/lease/sale/construction/home-improvement, ≤6 sq ft) or dwelling-identification (≤2 sq ft, attached to the dwelling) types only (RMC § 17.22.080.C)
- No sign may encroach into a right-of-way or easement except as allowed by the IBC, for hand-carried/temporary signs, or under the specific Main Street corridor luminaire-line rule (RMC § 17.22.080.A)
- A sign altered or modified on more than 25% of its face area, with the face surface fully replaced, or with its support structure repaired/replaced, is treated as a new sign and must meet all current requirements (RMC § 17.22.070)
- Sandwich board signs are allowed without exceeding 10 sq ft per side, must not impede pedestrian/vehicular traffic, and must be removed at close of business (RMC § 17.22.160) — not separately confirmed whether sandwich boards fall under the permit exemption list or require the standard sign permit
Required documents
- RequiredApplication for Building PermitCity's combined application form; select 'Other – Sign' as the improvement type
- RequiredSign Design/Structural PlansDesign stamped by a Wyoming-licensed structural engineer for the required 90 mph wind load, per RMC § 17.22.100.B
- RequiredSite/Elevation PlanShows proposed sign location, height, and face dimensions relative to property lines, rights-of-way, and (for ground/pole signs) the applicable corridor height zone
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Signs | $0.53 per square foot of sign face area, $39.00 minimum | City of Riverton Resolution No. 1355, Category 7 — verified by direct visual review of the resolution's scanned fee table (page 1 of 2), since the source PDF has no extractable text layer |
Fire Sprinkler / Fire Alarm / Fire Suppression System Permit
Installation, addition, or alteration of a fire sprinkler, fire alarm, or other fire suppression system within Riverton is NOT a City of Riverton-issued permit product — it is a state-run plan review and permit process through the Wyoming Department of Fire Prevention & Electrical Safety (State Fire Marshal's Office), required 'regardless of size or valuation.' Unlike electrical work — where Riverton's own Municipal Code (RMC Chapter 15.08) independently adopted the NEC and created a City Electrical Inspector position — no parallel Riverton ordinance establishing a local Fire Marshal or fire-plan-review authority was found in Title 15 of the Municipal Code, Riverton's own fee resolution (No. 1355) has no fire-alarm/sprinkler/suppression fee line, and the Riverton Fire Department is described in public directories as an all-volunteer department with no published plan-review division. Per Wyoming Statute § 35-9-108 and the Department's plan-review rules, fire-protection-system plan review defaults to the State Fire Marshal's Office unless a municipality has been separately granted delegated local enforcement authority by letter under W.S. § 35-9-121(b) — no delegation specific to fire-protection-system plan review was found documented for Riverton.
Reviewed 2026-07-22 · Source
Requirements
- Plan review is required for installation, addition, or alteration of any fire sprinkler, fire alarm, or fire suppression system 'regardless of size or valuation' (Dept. of Fire Prevention & Electrical Safety Rules, Chapter II, Section 1)
- Applications are submitted through the Wyoming State Fire Marshal's eLicensing, ePermit, and ePayment Portal; a separate Department-provided form/packet is required for fire sprinkler systems, fire alarm systems, and other fire suppression systems respectively (Ch. II § 1(e))
- Systems designed by a NICET Level III or greater professional must be prepared under the direct supervision of a Wyoming-registered design professional (P.E.); pre-engineered manufactured systems require submitted manufacturer verification instead (Ch. II § 1(c)(ii))
- Submittal must include four sets of plans and one set of specifications (or one electronic CAD/DWF-format set for sprinkler and alarm systems), the plan review fee, return postage, and a completed Project Information Sheet (Ch. II § 2(d))
- Fire alarm and fire sprinkler plans are submitted as successive PHASE plans after the Department approves the initial (usually building/architectural) plan set — not as a single combined submittal (Ch. II § 2(c))
- Riverton has NOT adopted a local fire-plan-review delegation ordinance comparable to its own Electrical Code (RMC Chapter 15.08); confirm current Authority Having Jurisdiction status directly with the Riverton Community Development Department at (307) 856-2999 and the WSFM Office at (307) 777-7288 before applying, since delegation status is transferred/revoked by administrative letter under W.S. § 35-9-121 and could change without a corresponding City ordinance
Required documents
- RequiredProject Information SheetDepartment-provided form that must accompany every plan review submittal (Ch. II § 2(a))
- RequiredFire Sprinkler / Fire Alarm / Suppression System Plan Review PacketSystem-specific Department packet and checklist (separate packets exist for fire alarm, sprinkler, and special-hazard/alternative suppression systems)
- RequiredEngineered or Manufacturer-Verified System PlansStamped by a Wyoming-registered P.E. for NICET III+ designed systems, or accompanied by manufacturer verification for pre-engineered systems
- OptionalApplication for Building PermitRiverton's combined City form, needed in parallel if the fire-protection system is installed as part of a broader building or tenant-improvement project
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Plan Review Fee (by total system valuation) — currently effective schedule | $36.61 minimum ($1.00–$499.99 valuation), scaling up through $8,928.74 for the first $1,000,000.00 plus $5.79 for each additional $1,000.00 (valuations $1,000,000+) | Department of Fire Prevention & Electrical Safety Rules, Chapter 2 Section 3 (Wyoming Administrative Code 041-2 §§ 2-3), amended effective October 5, 2023 — figures confirmed via the Cornell Law/Justia reproduction of the current Wyoming Administrative Code. IMPORTANT DISCREPANCY: the rules document linked directly from wsfm.wyo.gov's own Plan Review page (a Google Drive-hosted PDF) shows an older, apparently unamended fee table for this same Section 3 ($16.03 minimum, scaling to different intermediate figures) with no visible effective date — the two documents disagree, and the 10/5/2023-dated figures were treated as current since they are the more recently effective version found. Confirm the exact current fee at time of application via the ePermit portal or by calling WSFM at (307) 777-7288. |
| Inspections outside normal business hours / re-inspections / additional plan review from revisions | $103.76 per hour (current effective schedule; the older wsfm.wyo.gov-linked copy shows $49.31 per hour for the same line items) | Same Chapter 2 Section 3 fee schedule and same source discrepancy noted above |
| Outside consultants for plan checking and/or inspections | Actual cost (including administrative and overhead costs) | Department of Fire Prevention & Electrical Safety Rules, Chapter 2 Section 3 |
Change of Occupancy / Certificate of Occupancy Review
Riverton does not have a standalone 'change of use' or 'certificate of occupancy' permit product or fee category distinct from its standard Building Permit process. A change in a building or tenant space's occupancy classification is evaluated under the 2024 International Existing Building Code (IEBC) Chapter 10 'Change of Occupancy,' as adopted by the City via Enrolled Ordinance No. 25-003, together with the 2024 IBC's Certificate of Occupancy provisions — neither of which Riverton locally amended (this file's localAmendments list does not include any change to IBC § 111 or IEBC Chapter 10). Resolution No. 1355 has no dedicated 'change of use' or 'CO reissuance' fee line; the proposed change is submitted through the same combined 'Application for Building Permit' used for every other permit type in this file, and charged under the general Alterations category if the new occupancy requires physical changes to comply with applicable code.
Reviewed 2026-07-22 · Source
Requirements
- Any change in the character or use of a building or tenant space that changes its IBC occupancy classification is evaluated against IEBC Chapter 10 'Change of Occupancy' as adopted (2024 IEBC, Ordinance No. 25-003)
- If the new occupancy classification imposes more restrictive requirements (fire rating, means of egress, accessibility, structural, etc.) than the previous occupancy, compliance with the applicable new-occupancy provisions of the IEBC/IBC must be completed and verified before a new Certificate of Occupancy is issued
- No dedicated 'change of use' application form exists — use the combined 'Application for Building Permit,' describing the occupancy change and any associated alteration scope
- Food processing/manufacturing or other health-regulated uses moving into a space must separately contact Consumer Health Services at (307) 777-7211 before construction begins, the same requirement documented in this file's commercial-tenant-improvement-permit entry
- A Certificate of Occupancy is issued after final inspection confirms the space meets the code applicable to its (new) occupancy classification — consistent with the Final Inspection description already documented in this file's residential-building-permit and commercial-tenant-improvement-permit entries
Required documents
- RequiredApplication for Building PermitCombined City form; select the applicable construction type (e.g., Commercial + Alteration of Structure) and describe the occupancy change
- RequiredOccupancy/Code AnalysisNarrative comparing existing vs. proposed occupancy classification and the IEBC Chapter 10 compliance path, consistent with the 'occupancy/code analysis' cover-sheet item already required for commercial submittals in this file's commercial-tenant-improvement-permit entry
- OptionalConstruction DrawingsRequired only if physical alterations are needed to bring the space up to the new occupancy classification's code requirements
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Alterations (if the occupancy change requires construction to comply with the new use's code requirements) | $0.42 per square foot of alteration area, $50.00 minimum | City of Riverton Resolution No. 1355, Category 3.A — no distinct 'change of use' fee exists; this is the same general Alterations category used elsewhere in this file (see residential-addition-remodel and commercial-tenant-improvement-permit entries) |
| Occupancy reclassification with NO construction/alteration required | No verified fee found | Resolution No. 1355 has no line item for a pure administrative change-of-occupancy or Certificate of Occupancy reissuance review with zero construction scope. This is a genuine documentation gap, not an inferred figure — confirm directly with the Community Development Department at (307) 856-2999 whether any administrative review fee applies in this scenario. |
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Riverton building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.