You are viewing the permanent link for the record currently in effect, published 2026-07-17.
Cheyenne building permits
VerifiedCheyenne, Wyoming — as published 2026-07-17.
Verified 2026-07-17 · Source
Codes adopted
Permit types & fees
Residential Building Permit (New Construction)
VerifiedRequired for new single-family dwellings, duplexes, and other one- and two-family residential construction in Cheyenne. Cheyenne's building permit is all-inclusive of structural, mechanical, electrical, and plumbing scope when submitted on one application. Governed by the 2024 IRC as adopted by Ordinance No. 4613 (Feb 24, 2025) [ordinance number corrected 2026-07-17, verified live via Municode Ch. 15.10.010].
Verified 2026-07-17 · Source
Requirements
- Building permit and plan review approval required prior to starting construction
- Application, fees, and submittal documents (4 sets of drawings, 1 set of digital specifications) submitted together to the Building Safety Division
- All foundation plans must be prepared by a Wyoming registered design professional, except residential projects conforming to the Department's Minimum Footing Requirements for Additions
- Design must account for: 105 mph ultimate wind speed VULT (Exposure C) [corrected 2026-07-17 from a previously stated 115 mph, verified live against the City's current Table R301.2(1) Design Criteria], Seismic Design Category A-B [corrected from 'B'], 32 lb/ft² ground snow load [corrected from a previously stated 30 psf], 36-inch minimum frost depth (confirmed unchanged), Climate Zone 6B (not on the current live design-criteria table — carried over from the older 2023 handout, unconfirmed this pass)
- Building permit is all-inclusive — mechanical, electrical, and plumbing scope can be included on the same application rather than filing separate trade permits
- All contractors and subcontractors must hold current City of Cheyenne contractor licenses
- Plan review typically completed within 10 business days for residential projects
Required documents
- RequiredBuilding Permit Application (via OpenGov portal — cheyennewy.portal.opengov.com)Online application, submitted with fees and full submittal package
- RequiredConstruction Drawings (4 sets + 1 digital specification set)Full plan set: foundation, framing, structural, mechanical, plumbing, electrical, drawn to scale
- RequiredSite PlanProperty lines, setbacks, existing/proposed structures, utilities — required with application per Planning and Development review
- RequiredFoundation/Structural Plans (Wyoming registered design professional, wet-sealed)Required for all foundation plans except minor residential additions meeting the Department's Minimum Footing Requirements
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building and Construction Permit Fee — $1 to $500 valuation | $23.50 | City of Cheyenne Schedule of Fees (Ordinance 4254), City Treasurer's Office, current edition |
| Building and Construction Permit Fee — $501 to $2,000 valuation | $23.50 for the first $500 plus $3.05 for each additional $100 or fraction thereof, to and including $2,000 | City of Cheyenne Schedule of Fees (Ordinance 4254) |
| Building and Construction Permit Fee — $2,001 to $25,000 valuation | $69.25 for the first $2,000 plus $14.00 for each additional $1,000 or fraction thereof, to and including $25,000 | City of Cheyenne Schedule of Fees (Ordinance 4254) |
| Building and Construction Permit Fee — $25,001 to $50,000 valuation | $391.75 for the first $25,000 plus $10.10 for each additional $1,000 or fraction thereof, to and including $50,000 | City of Cheyenne Schedule of Fees (Ordinance 4254) |
| Building and Construction Permit Fee — $50,001 to $100,000 valuation | $643.75 for the first $50,000 plus $7.00 for each additional $1,000 or fraction thereof, to and including $100,000 | City of Cheyenne Schedule of Fees (Ordinance 4254) |
| Building and Construction Permit Fee — $100,001 to $500,000 valuation | $993.75 for the first $100,000 plus $5.60 for each additional $1,000 or fraction thereof, to and including $500,000 | City of Cheyenne Schedule of Fees (Ordinance 4254) |
| Building and Construction Permit Fee — $500,001 to $1,000,000 valuation | $3,233.75 for the first $500,000 plus $4.75 for each additional $1,000 or fraction thereof, to and including $1,000,000 | City of Cheyenne Schedule of Fees (Ordinance 4254) |
| Building and Construction Permit Fee — $1,000,001 and up | $5,608.75 for the first $1,000,000 plus $3.65 for each additional $1,000 or fraction thereof | City of Cheyenne Schedule of Fees (Ordinance 4254) |
| Plan Review Fee (when submittal documents are required) | 65% of the Building Permit Fee | City of Cheyenne Schedule of Fees (Ordinance 4254) |
| Planning and Development Building Permit Review Fee | $50.00 | City of Cheyenne Schedule of Fees, Planning Fees section (Resolution 6213) — applied to building permits per Planning/Development review |
| Additional Plan Review (plan changes/revisions) | $47.00 per hour (0.5-hour minimum charge) | City of Cheyenne Schedule of Fees (Ordinance 4254) |
Residential Addition / Remodel Permit
VerifiedRequired for additions, structural alterations, remodels, basement finishes, garage conversions, and other significant alterations to existing one- and two-family dwellings in Cheyenne. Uses the same all-inclusive, valuation-based Building and Construction Permit Fee schedule as new construction.
Verified 2026-07-17 · Source
Requirements
- Room additions, structural modifications, garage conversions
- Basement finishes involving framing, electrical, plumbing, or mechanical work
- Change of use requires additional review — see Planning and Development
- Submit via OpenGov portal with plans showing scope, dimensions, structural details, and connection to existing structure
- Foundation/structural plans for additions must be prepared by a Wyoming registered design professional unless conforming to the Department's Minimum Footing Requirements for Additions
Required documents
- RequiredBuilding Permit Application (via OpenGov portal)Online application; select remodel/addition scope
- RequiredSite PlanExisting structures, proposed addition footprint, setbacks
- RequiredConstruction DrawingsPlans showing all relevant aspects of the addition/alteration including any MEP scope
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building and Construction Permit Fee — valuation-based (same table as new construction) | Varies by project valuation — see Building and Construction Permit Fee table under residential-building-permit | City of Cheyenne Schedule of Fees (Ordinance 4254); valuation includes labor + materials for the addition/remodel scope |
| Plan Review Fee | 65% of the Building Permit Fee | City of Cheyenne Schedule of Fees (Ordinance 4254) |
| Planning and Development Building Permit Review Fee | $50.00 | City of Cheyenne Schedule of Fees, Planning Fees section (Resolution 6213) |
| Change of Use Permit (minimum fee, when applicable) | $250.00 | City of Cheyenne Schedule of Fees — Misc. Building and Construction Permit Fees (Ordinance 4254) |
Electrical Permit
VerifiedCheyenne is a home-rule municipality with its own delegated building-code authority and its OWN electrical permitting/inspection program (Municipal Code Chapter 15.20 'National Electrical Code Adopted'), separate from the Wyoming State Fire Marshal's default statewide electrical program. The City's Compliance Department (Building Safety Division) issues electrical permits directly using its own 'Plumbing, Mechanical, Electrical Permit Application' form, and requires a City of Cheyenne contractor license (not just a Wyoming state license) to pull the permit.
Verified 2026-07-17 · Source
Requirements
- Electrical work (new circuits, service changes, panel upgrades, rewiring, EVSE, solar interconnection wiring) requires an electrical permit from the City of Cheyenne Compliance Department — NOT from the Wyoming State Fire Marshal's Office, for work inside Cheyenne city limits
- Governed by Cheyenne Municipal Code Chapter 15.20 (National Electrical Code Adopted); the 2023 NEC is the current edition in force
- Contractor must hold a current City of Cheyenne electrical contractor/trade license (Class per Contractor Licensing Regulations) in addition to any state licensing
- Submit the 'Plumbing, Mechanical, Electrical Permit Application' (or include electrical scope on the combined building permit application) via the OpenGov portal or in person
- List all electrical subcontractors and their Contractor Class & License # on the application — work not described/listed is not covered by the permit
- Permit becomes null and void if work is not commenced within 180 days; expires one year after date of issue in any case
- Wyoming Statute still requires the actual electrician performing licensable work to hold a WY state electrician license (per state licensing statute) even though the City, not WSFM, issues the wiring/inspection permit inside Cheyenne
Required documents
- RequiredPlumbing, Mechanical, Electrical Permit ApplicationCity of Cheyenne Compliance Department form; select 'Electrical' checkbox, list valuation of work, contractor name/class/license #, and scope of work
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building and Construction Permit Fee — valuation-based (electrical scope) | Same valuation-based table as the general Building and Construction Permit Fee (see residential-building-permit fees) — e.g., $23.50 for $1–$500 valuation, scaling up per the Ordinance 4254 table | City of Cheyenne Schedule of Fees (Ordinance 4254); the city applies ONE unified valuation-based fee structure to building, electrical, plumbing, and mechanical permits rather than separate flat-rate trade fee tables |
| Plan Review Fee | 65% of the Building Permit Fee | City of Cheyenne Schedule of Fees (Ordinance 4254) |
Plumbing Permit
VerifiedRequired for plumbing installations, alterations, and repairs in Cheyenne. Issued by the City's Compliance Department (Building Safety Division) under the 2024 International Plumbing Code (IPC) — NOTE: Cheyenne uses the IPC, not the Uniform Plumbing Code.
Verified 2026-07-17 · Source
Requirements
- New fixture installations, water heater replacement, re-piping, sewer/water line work
- Submit the 'Plumbing, Mechanical, Electrical Permit Application' (select Plumbing) or include plumbing scope on the combined building permit application
- Licensed City of Cheyenne plumbing contractor required; list contractor class and license # on the application
- Governed by the 2024 International Plumbing Code
Required documents
- RequiredPlumbing, Mechanical, Electrical Permit ApplicationCity of Cheyenne Compliance Department form; select 'Plumbing' checkbox
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building and Construction Permit Fee — valuation-based (plumbing scope) | Same valuation-based table as the general Building and Construction Permit Fee (see residential-building-permit fees) | City of Cheyenne Schedule of Fees (Ordinance 4254) — no separate flat-rate plumbing fee table; plumbing-only work is valued and charged from the same schedule |
| Plan Review Fee | 65% of the Building Permit Fee | City of Cheyenne Schedule of Fees (Ordinance 4254) |
Mechanical / HVAC Permit
VerifiedRequired for heating, cooling, ventilation, and fuel gas installations in Cheyenne. Issued by the City's Compliance Department under the 2024 International Mechanical Code (IMC) and International Fuel Gas Code (IFGC).
Verified 2026-07-01 · Source
Requirements
- Furnace, A/C, heat pump, boiler installation or replacement
- Ductwork installation or modification
- Gas piping/fuel gas systems
- Submit the 'Plumbing, Mechanical, Electrical Permit Application' (select Mechanical) or include mechanical scope on the combined building permit application
- Licensed City of Cheyenne mechanical contractor required
Required documents
- RequiredPlumbing, Mechanical, Electrical Permit ApplicationCity of Cheyenne Compliance Department form; select 'Mechanical' checkbox
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building and Construction Permit Fee — valuation-based (mechanical scope) | Same valuation-based table as the general Building and Construction Permit Fee (see residential-building-permit fees) | City of Cheyenne Schedule of Fees (Ordinance 4254) — no separate flat-rate mechanical fee table |
| Plan Review Fee | 65% of the Building Permit Fee | City of Cheyenne Schedule of Fees (Ordinance 4254) |
Roofing Permit (Reroof)
VerifiedRequired for roof replacement (tear-off and reroof) on residential and commercial buildings in Cheyenne. Processed as a standard valuation-based Building and Construction Permit.
Verified 2026-07-17 · Source
Requirements
- Complete roof replacement/tear-off and reroof requires a building permit per the City FAQ ('Renovations (garage conversions, basement furnishings, kitchen expansions, reroofing, etc.)')
- Apply via OpenGov portal
- Roof design must account for 32 lb/ft² ground snow load per the City's current Table R301.2(1) Design Criteria [corrected 2026-07-17 from a previously stated 30 psf]
Required documents
- RequiredBuilding Permit Application (via OpenGov portal)Include reroof scope and valuation (contract price for materials + labor)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building and Construction Permit Fee — valuation-based (reroof scope) | Varies by project valuation — see Building and Construction Permit Fee table under residential-building-permit | No separate reroof fee line exists in the adopted Schedule of Fees (Ordinance 4254); reroofs are charged under the general valuation-based building-permit fee schedule. |
| Plan Review Fee | 65% of the Building Permit Fee | City of Cheyenne Schedule of Fees (Ordinance 4254) |
Solar PV Permit
VerifiedRequired for installation of rooftop or ground-mounted solar photovoltaic systems in Cheyenne. Processed through the standard building/electrical permit process (structural + electrical scope); a separate Solar Access Permit System review exists for solar-access-rights questions under UDC § 39-4.
Verified 2026-07-17 · Source
Requirements
- Rooftop or ground-mounted solar PV installation requires a building permit (structural/racking) and electrical permit (interconnection, wiring) from the Compliance Department
- 2024 IFC solar-system 'pathway to ridge' fire-access requirements apply to systems installed/permitted on or after March 1, 2025 (systems existing or permitted before that date are grandfathered)
- A separate Solar Access Permit System review ($35 fee, City Code § 39-4) exists specifically to address solar-access-rights disputes between neighboring properties — this is distinct from the construction/electrical permit for the PV system itself
- Structural calculations for roof-mounted arrays must account for 32 lb/ft² snow load and 105 mph (VULT) wind design criteria [corrected 2026-07-17 from previously stated 30 psf / 115 mph, per the City's current live Table R301.2(1) Design Criteria]
Required documents
- RequiredBuilding Permit Application (via OpenGov portal) — structural/racking scopeSite plan, racking/structural details, roof-mounting connections
- RequiredPlumbing, Mechanical, Electrical Permit Application — electrical scopeElectrical interconnection, wiring, disconnect location
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building and Construction Permit Fee — valuation-based (solar system cost) | Varies by project valuation — see Building and Construction Permit Fee table under residential-building-permit | PV construction is charged under the general valuation table (Ord 4254); no separate flat-rate solar construction fee line exists in the adopted Schedule of Fees. |
| Solar Access Permit System Review Fee (solar-access-rights review, not the installation permit itself) | $35.00 | City of Cheyenne Schedule of Fees, In-House fee, City Code § 39-4 |
| Plan Review Fee | 65% of the Building Permit Fee | City of Cheyenne Schedule of Fees (Ordinance 4254) |
Accessory Dwelling Unit (ADU) Permit
VerifiedRequired for construction of a new ADU in Cheyenne. As of a Feb 2026 third-reading ordinance, the City removed its owner-occupancy requirement for ADUs and adjusted parking regulations and ADU/semi-attached-dwelling definitions in the Unified Development Code (UDC), making it easier to build and rent ADUs without the owner living on-site.
Verified 2026-07-17 · Source
Requirements
- ADU construction requires a standard valuation-based building permit plus Planning Fees review (Accessory Dwelling Unit planning fee)
- As of the Feb 2026 ordinance, owner-occupancy of the primary residence is NO LONGER required to build or rent out an ADU in Cheyenne
- Parking regulations were adjusted alongside the owner-occupancy repeal — confirm current on-site parking requirement with Planning and Development (307-637-6282)
- ADU and semi-attached dwelling (flat-over-flat duplex) definitions were clarified in the UDC to align zoning code with building department practice
- Governed by the 2024 IRC for construction standards; zoning eligibility governed by the Unified Development Code (UDC)
- Contact Planning and Development (307-637-6282) before applying to confirm zoning eligibility for the specific property
Required documents
- RequiredBuilding Permit Application (via OpenGov portal)Standard valuation-based residential permit process
- RequiredSite PlanProperty lines, existing structures, proposed ADU location, setbacks, parking
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Planning Fees — Accessory Dwelling Unit | $600.00 | City of Cheyenne Schedule of Fees, Planning Fees section (Resolution 6213) |
| Building and Construction Permit Fee — valuation-based | Varies by project valuation — see Building and Construction Permit Fee table under residential-building-permit | City of Cheyenne Schedule of Fees (Ordinance 4254) |
| Plan Review Fee | 65% of the Building Permit Fee | City of Cheyenne Schedule of Fees (Ordinance 4254) |
Demolition Permit
VerifiedRequired for demolition of structures in Cheyenne. Contractors must hold City of Cheyenne contractor and building trade licenses before performing demolition work. Processed via the standard Compliance Department permit application, with 'Demolish' as a selectable work-type checkbox.
Verified 2026-07-17 · Source
Requirements
- Contractors are prohibited from demolishing any building/structure without holding the required City of Cheyenne contractor and building trade licenses per the Contractor Licensing Regulations
- Application submitted to the Building Safety Department; 'Demolish' is one of the selectable 'Work to be completed' checkboxes on the combined permit application form
- Utility disconnects should be verified/arranged prior to demolition
- Floodplain development permit required if the structure is within a designated floodplain (demolition is explicitly listed as 'development' under FEMA's definition per the City's Engineering FAQ)
Required documents
- RequiredBuilding Permit Application (via OpenGov portal) — 'Demolish' work typeStandard Compliance Department application with the Demolish box checked
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building and Construction Permit Fee — valuation-based (demolition scope) | Varies by project valuation (contract price of demolition work) — see Building and Construction Permit Fee table under residential-building-permit | No demolition-specific fee or bond exists in the adopted Schedule of Fees (Ordinance 4254); demolition is charged under the general valuation-based Building and Construction Permit Fee table. |
| Moving Building Permit Fee (per unit — for relocating a structure, related but distinct from straight demolition) | $100.00 | City of Cheyenne Schedule of Fees, In-House fee, City Code § 10-10(a) |
Commercial Tenant Improvement Permit
VerifiedRequired for interior build-out, remodeling, or change-of-use work in commercial spaces in Cheyenne. Valuation-based, and commercial plan review runs a longer 21-business-day timeline than residential.
Verified 2026-07-17 · Source
Requirements
- Interior remodel, tenant build-out, or change-of-use in a commercial space
- Change-of-use projects require a minimum $250 Change of Use Permit fee
- Commercial Master Plan Code Review available for prototype/repeat commercial layouts ($250 initial, 25% of original fee for subsequent reviews of the same master plan)
- Commercial plan review runs up to 21 business days
- Contractors must hold current City of Cheyenne contractor licenses
- Temporary Certificate of Occupancy available for commercial structures pending completion; penalty ($750) applies for failing to convert a TCO to a full CO within the required timeframe
Required documents
- RequiredBuilding Permit Application (via OpenGov portal)Commercial tenant improvement / remodel scope
- RequiredConstruction Drawings stamped by a Wyoming registered design professionalFull plan set including structural, mechanical, electrical, plumbing, and fire protection as applicable
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building and Construction Permit Fee — valuation-based | Varies by project valuation — see Building and Construction Permit Fee table under residential-building-permit | City of Cheyenne Schedule of Fees (Ordinance 4254); same table applies to commercial and residential work |
| Change of Use Permit (minimum fee) | $250.00 | City of Cheyenne Schedule of Fees — Misc. Building and Construction Permit Fees (Ordinance 4254) |
| Commercial Master Plan Code Review | $250.00 | City of Cheyenne Schedule of Fees — Misc. Building and Construction Permit Fees (Ordinance 4254) |
| Subsequent Code Reviews of Commercial Master Plan | 25% of the original fee | City of Cheyenne Schedule of Fees (Ordinance 4254) |
| Temporary Certificate of Occupancy — Commercial Structures | $1,250.00 | City of Cheyenne Schedule of Fees — Misc. Building and Construction Permit Fees (Ordinance 4254) |
| Plan Review Fee | 65% of the Building Permit Fee | City of Cheyenne Schedule of Fees (Ordinance 4254) |
Deck Permit
VerifiedDecks in Cheyenne require a building permit regardless of attachment status, per the City's Building FAQ, which lists decks among the 'residential work' requiring a permit. Processed as a valuation-based Building and Construction Permit.
Verified 2026-07-17 · Source
Requirements
- Deck construction/replacement requires a building permit
- Structural design must account for 32 lb/ft² snow load [corrected 2026-07-17 from a previously stated 30 psf, per the City's current live Table R301.2(1) Design Criteria] and appropriate footing depth (36-inch frost line minimum, confirmed unchanged) if the deck is supported on footings
- Submit via OpenGov portal with site plan and construction drawings showing framing and connection to the primary structure
Required documents
- RequiredBuilding Permit Application (via OpenGov portal)Deck scope, dimensions, ledger/footing details
- RequiredConstruction DrawingsFraming plan, footing/post spacing, guardrail/stair details as applicable
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building and Construction Permit Fee — valuation-based (deck scope) | Varies by project valuation — see Building and Construction Permit Fee table under residential-building-permit (e.g., $1–$500 valuation = $23.50 minimum) | City of Cheyenne Schedule of Fees (Ordinance 4254) — no separate flat-rate deck fee; deck permits use the general valuation-based table |
| Plan Review Fee | 65% of the Building Permit Fee | City of Cheyenne Schedule of Fees (Ordinance 4254) |
Basement Finish Permit
VerifiedFinishing a basement (framing, electrical, plumbing, or mechanical work) in Cheyenne requires a remodel-type building permit. Processed as a valuation-based Building and Construction Permit, potentially all-inclusive of any trade scope if disclosed on the application.
Verified 2026-07-17 · Source
Requirements
- Basement finishing involving framing, electrical, plumbing, or mechanical systems requires a permit — the City FAQ specifically lists 'basement furnishings' among renovation work requiring a building permit
- Egress window requirements apply if creating a habitable/sleeping space, per the 2024 IRC
- Submit via OpenGov portal with scope of work including any MEP trades involved
Required documents
- RequiredBuilding Permit Application (via OpenGov portal)Remodel scope covering basement finish work
- RequiredConstruction DrawingsFloor plan showing new walls, egress windows (if applicable), and any electrical/plumbing/mechanical additions
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building and Construction Permit Fee — valuation-based (basement finish scope) | Varies by project valuation — see Building and Construction Permit Fee table under residential-building-permit | City of Cheyenne Schedule of Fees (Ordinance 4254); valuation includes labor + materials for the finish work |
| Plan Review Fee | 65% of the Building Permit Fee | City of Cheyenne Schedule of Fees (Ordinance 4254) |
Electric Vehicle (EV) Charger / EVSE Permit
VerifiedCheyenne has no standalone EV charger or EVSE permit type or fee line -- the City's own Compliance Department (Building Safety Division) electrical-permit process explicitly names 'EVSE' as one of the categories of electrical work requiring a permit (Cheyenne Municipal Code Chapter 15.20, National Electrical Code Adopted; 2023 NEC current edition), and it is billed under the City's single unified valuation-based Building and Construction Permit Fee table (Ordinance 4254) rather than a separate EV-specific fee schedule.
Verified 2026-07-20 · Source
Requirements
- Electrical permit required from the City of Cheyenne Compliance Department for EVSE installation -- explicitly listed alongside new circuits, service changes, panel upgrades, rewiring, and solar interconnection wiring as electrical work requiring a permit
- Governed by Cheyenne Municipal Code Chapter 15.20 (National Electrical Code Adopted); 2023 NEC is the current edition in force
- Contractor must hold a current City of Cheyenne electrical contractor/trade license in addition to any state licensing
- Submit the 'Plumbing, Mechanical, Electrical Permit Application' (or include the EVSE scope on a combined building permit application) via the OpenGov portal or in person
- Permit becomes null and void if work is not commenced within 180 days; expires one year after date of issue
Required documents
- RequiredPlumbing, Mechanical, Electrical Permit ApplicationCity of Cheyenne Compliance Department electrical permit application, submitted via the OpenGov portal or in person; EVSE circuit work falls under this application type
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building and Construction Permit Fee -- valuation-based (electrical/EVSE scope) | Same valuation-based table as the general Building and Construction Permit Fee -- e.g., $23.50 for $1-$500 valuation, scaling up per the Ordinance 4254 table | City of Cheyenne Schedule of Fees (Ordinance 4254); the city applies ONE unified valuation-based fee structure to building, electrical, plumbing, and mechanical permits -- no distinct EV charger/EVSE fee tier was located anywhere in the schedule, checked directly on 2026-07-20 |
Sign Permit
VerifiedRequired for new permanent signs and remodels/alterations of existing signs (wall, projecting, ground, low-profile, freestanding, billboard, and pedestrian-category signs) in Cheyenne, per Unified Development Code (UDC) Section 6.5. A sign permit is issued by the Building Safety Division at the same time as the building permit -- no sign may be erected without a building permit -- and certain low-impact sign types are exempt from the permit requirement entirely.
Verified 2026-07-22 · Source
Requirements
- A sign plan/permit is required for all new signs and for alterations of existing signs that replace more than 50% of the sign's surface area (UDC 6.5.2, 6.5.5.a); a sign plan is also required with the site plan review application for all new uses/buildings (except detached dwellings, duplexes, townhouses) and for any change of use involving alteration of an existing sign
- Plans are submitted to the Development Office/Planning and Development Department with the site plan review application, then submitted to the Director with any building plans; the Director determines issuance of the sign permit(s) at the same time as the building permit (UDC 6.5.5.a.1-2)
- No sign shall be erected without a building permit (UDC 6.5.5.a.3)
- Freestanding, billboard, and ground sign applications require digital structural/foundation plans stamped by a Wyoming registered design professional, and a final certification of sign placement/dimensions/setbacks stamped by a Wyoming engineer or land surveyor, submitted prior to final inspection (UDC 6.5.6.d; City Sign Permit Check List)
- Certain sign types are EXEMPT from the permit requirement if they meet the specific thresholds in UDC 6.5.5.b -- e.g., nonilluminated temporary signs within the allowances of UDC 6.5.4, nonilluminated incidental/directional signs in residential districts not exceeding 3 sq ft, nameplates/building markers not exceeding 1 sq ft per 10 linear ft of building frontage (max 10 sq ft), window signs, government/public-safety signs, and signs in place as of 6-14-93 that were properly permitted or required no permit at the time
- Signs exceeding any of the UDC 6.5.5.b exemption thresholds require a full sign permit subject to all applicable district regulations
Required documents
- RequiredBuilding Permit Application (via OpenGov portal)Sign permits are issued alongside the building permit; submitted by a licensed contractor with payment of fees
- RequiredPlot PlanShows setbacks and dimensions from property lines and other buildings on the property
- RequiredDigital Building PlansShows dimensions of the sign
- RequiredDigital Structural/Foundation Plans (Wyoming registered design professional, wet-sealed)Required for freestanding, billboard, and ground sign permits
- RequiredDigital Certification of Final Sign Placement (Wyoming engineer or land surveyor, wet-sealed)Certifies sign placement, installed dimensions, and setbacks for freestanding, billboard, and ground signs; must be submitted prior to final inspection (UDC 6.5.6.d)
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Planning Fees -- Sign Permit Review Fee | $50.00 | City of Cheyenne Schedule of Fees, Planning Fees section (Resolution 6213); verified directly against the live Schedule of Fees PDF 2026-07-22 |
| Building and Construction Permit Fee -- valuation-based (sign construction scope) | Varies by project valuation -- see Building and Construction Permit Fee table under residential-building-permit | No separate flat-rate sign construction fee line exists in the adopted Schedule of Fees (Ordinance 4254); sign construction is charged under the same general valuation-based table used for other permit types without a dedicated fee line (e.g. reroof, demolition, deck) |
| Plan Review Fee | 65% of the Building Permit Fee | City of Cheyenne Schedule of Fees (Ordinance 4254); applied generally to building-permit-scope work in this jurisdiction |
Fire Protection System Permit (Fire Sprinkler / Fire Alarm)
VerifiedCheyenne does not issue a standalone fire sprinkler or fire alarm permit or charge a distinct fee for one. Fire protection system plans (sprinkler and alarm) are submitted as part of the standard Building Permit application/plan set and are forwarded internally by the Building Safety Division to Cheyenne Fire Rescue for review, per the City's 2026 Plan Review Information handout, under the 2024 International Fire Code (IFC) as adopted by Ordinance No. 4613 (Feb 24, 2025).
Verified 2026-07-22 · Source
Requirements
- Fire protection system (sprinkler and/or alarm) plans are submitted together with the rest of the building/commercial permit plan set via the OpenGov portal -- there is no separate stand-alone fire sprinkler or fire alarm permit application
- Plans for fire protection systems may be designed by a NICET III (or greater) certified professional, must include hydraulic calculations, and must be wet-stamp sealed by a Wyoming registered design professional (City Plan Review Information, 2026)
- The Building Safety Department forwards submitted plans internally to the Fire Department (Cheyenne Fire Rescue); Cheyenne Fire Rescue's Fire Marshal reviews the fire protection plans as part of the overall plan review process
- Governed by the 2024 International Fire Code, adopted by Ordinance No. 4613 (Feb 24, 2025), codified at City Code Title 8 Chapter 8.12
- Charged under the City's single unified valuation-based Building and Construction Permit Fee (Ordinance 4254) -- no distinct fire sprinkler or fire alarm fee line exists anywhere in the adopted Schedule of Fees, confirmed directly 2026-07-22
- A Fire/Life Safety inspection, coordinated with Cheyenne Fire Rescue, is required before Certificate of Occupancy issuance for commercial projects with fire protection systems
Required documents
- RequiredBuilding Permit Application (via OpenGov portal)Fire protection system scope is included on the standard building/commercial permit application -- no separate application exists
- RequiredFire Protection System Plans (hydraulic calculations, NICET III+ design, Wyoming registered design professional wet stamp seal)Submitted with the rest of the plan set for Building Safety Department review and internal forwarding to Cheyenne Fire Rescue
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Building and Construction Permit Fee -- valuation-based (fire protection system scope) | Same valuation-based table as the general Building and Construction Permit Fee (see residential-building-permit fees) | City of Cheyenne Schedule of Fees (Ordinance 4254); no distinct fire sprinkler/fire alarm fee tier was located anywhere in the schedule, checked directly against the live PDF 2026-07-22 -- consistent with how mechanical, electrical, and plumbing scope are also billed under this single unified table |
| Plan Review Fee | 65% of the Building Permit Fee | City of Cheyenne Schedule of Fees (Ordinance 4254) |
Change of Use Permit
VerifiedRequired when a property's use changes in a way that meets the Unified Development Code's (UDC) change-of-use criteria. Combines a Building/Compliance Department 'Change of Use Permit' fee with, in most cases, a Planning and Development Department Site Plan (or reduced Site Plan Change of Use Documentation) review, and concludes with issuance of a Certificate of Occupancy for the new use.
Verified 2026-07-22 · Source
Requirements
- Per the City's Building/Planning FAQ, a change of use constitutes at least one of: the proposed use is appreciably different than the current use; there is an increase in the size of the existing building or extent of the use of the land; the new use is permitted in the zoning district but requires more parking than the previous use; the new use generates more vehicle trips than the previous use (per the Institute of Transportation Engineers' Trip Generation, latest edition); or the amount of stormwater runoff/impervious surface area increases with the new use
- A Site Plan application is required for any change of use or new building (among other triggers), except for single-family, duplex, or townhouse development
- If the change of use involves NO proposed exterior modifications, Planning and Development accepts a reduced 'Site Plan Change of Use Documentation' in place of a full Site Plan application
- A Certificate of Occupancy is issued when the Building Official finds no code violations for the change of use of an existing structure, following required inspections
- A financial surety bond (125% of cost for site/landscaping work, 150% for right-of-way work) is required for any unfinished exterior work when a Site Plan and final Planning inspection are required, prior to TCO or CO issuance
- Contractors performing any construction work associated with the change of use must hold current City of Cheyenne contractor licenses
Required documents
- OptionalBuilding Permit Application (via OpenGov portal)Required if the change of use involves construction work; select change-of-use / remodel scope
- RequiredSite Plan or Site Plan Change of Use DocumentationFull Site Plan required for most changes of use; the reduced 'Site Plan Change of Use Documentation' applies only when no exterior modifications are proposed. Not required for single-family, duplex, or townhouse development.
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Misc. Building and Construction Permit Fees -- Change of Use Permit (Minimum Fee) | $250.00 | City of Cheyenne Schedule of Fees (Ordinance 4254); charged by the Compliance/Building Department |
| Planning Fees -- Site Plan Change of Use Documentation with No Proposed Exterior Modifications | $100.00 | City of Cheyenne Schedule of Fees, Planning Fees section (Resolution 6213); a separate, distinct fee from the Building Department's $250 Change of Use Permit fee -- both can apply to the same project. Confirmed directly against the live Schedule of Fees PDF 2026-07-22 |
| Temporary Certificate of Occupancy -- One and Two Family Dwellings | $300.00 | City of Cheyenne Schedule of Fees, Misc. Building and Construction Permit Fees (Ordinance 4254); confirmed directly against the live Schedule of Fees PDF 2026-07-22 -- this residential TCO fee tier was not previously priced elsewhere in this file |
| Temporary Certificate of Occupancy -- Commercial Structures | $1,250.00 | City of Cheyenne Schedule of Fees, Misc. Building and Construction Permit Fees (Ordinance 4254) |
| Penalty to Convert Temporary Certificate of Occupancy (Commercial, or One and Two Family Dwellings) | $750.00 each | City of Cheyenne Schedule of Fees, In-House fee, City Code § 1-10 -- applies to both commercial and residential TCOs if not converted to a full CO within the required timeframe |
Sources & verification
Verified against official sources. Last reviewed 2026-07-17.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Cheyenne building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.