This is PermitBase’s published record for Rock Springs as of 2026-07-20. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Rock Springs building permits

Verified

Rock Springs, Wyoming — as published 2026-07-20.

Verified 2026-07-01 · Source

Codes adopted

2024 International Building Code (IBC) — with local amendments; adopted per Rock Springs Municipal Code § 150.04, including Appendix E, Appendix I and Appendix J, excluding Chapter 272024 International Residential Code (IRC) — with local amendments per § 150.04(D); including Appendix BF, Appendix B, Appendix C and Appendix CA; excluding R-309, P2904, and several Section R-403.3 subsections/tables/figures2024 International Existing Building Code (IEBC) — adopted per § 150.042024 International Mechanical Code (IMC) — with local amendment per § 150.04(C)2024 International Plumbing Code (IPC) — with local amendment per § 150.04(C); including Appendix D (Degree Day/Design Temperatures), Appendix E (Sizing of Water Pipe Systems) and Appendix C (Structural Safety)2024 International Fuel Gas Code (IFGC) — including Appendix A, Appendix B and Appendix C2024 International Fire Code (IFC) — per City of Rock Springs Building Ordinances pageNational Electrical Code, 2023 edition (NFPA) — adopted per § 150.04; enforced locally by the City Electrical Inspector under Rock Springs Municipal Code §§ 150.30–150.36 (city electrical code), NOT the Wyoming State Fire Marshal default program

Permit types & fees

Residential Building Permit (New Construction)

Verified

Required for new single-family dwellings and other one- and two-family residential construction within Rock Springs city limits. Governed by the 2024 IRC as adopted (with local amendments) by Rock Springs Municipal Code § 150.04. Single-family new construction is charged a flat permit fee rather than the valuation table.

Verified 2026-07-01 · Source

Requirements

  • Any person, firm or corporation desiring to construct, enlarge, alter, repair, move, convert, or demolish any building or structure must obtain a building permit from the Building Official before work begins (§ 150.02(A)(1))
  • Contractor/subcontractor/builder must have the permit issued and exhibited before commencing work (§ 150.02(A)(2))
  • Design must account for adopted design criteria: 30 psf ground snow load, 115 mph ultimate wind speed (Exposure C), 42-inch minimum frost depth
  • Mine Subsidence classification must be checked with City Engineering (307-352-1540); classified-area foundations must be designed to mitigate subsidence effects with a design engineer's statement on the plans
  • A dimensioned site plan showing utilities, setbacks, streets, alleys, and parking is required
  • Sewer connection fee is due at permit issuance if the property has not previously been assessed for the sanitary sewer system and a prior connection fee has not been paid (§ 150.02(A)(3))
  • General contractor must be a City of Rock Springs registered contractor ($125 registration fee + insurance certificate on file)
  • Permit becomes null and void if work is not commenced within 180 days, or is suspended/abandoned for 180 days after commencement

Required documents

  • RequiredBuilding Permit ApplicationCity of Rock Springs Building Permit Application form — job address, legal description, owner, architect/engineer, class of work, description of work, general contractor, valuation, floodplain data, and special approvals routing (zoning, fire, engineering, soil report, health dept.)
  • RequiredConstruction DrawingsFull plan set showing structural, mechanical, plumbing, and electrical scope
  • RequiredSite PlanDimensioned site plan showing property lines, utilities, setbacks, streets, alleys, and parking
  • OptionalDetail Sheet — Concrete (Foundations/Footings/Slabs)City of Rock Springs standard detail sheet for foundation/footing/slab construction, available in the Building Inspections & Permits Document Center

Fee schedule

Fee typeAmountNotes
Single-family home (flat fee)$1,100.00 flat — no plan review fee chargedRock Springs Municipal Code § 150.08(B)(2): 'Single-family homes: building permit fee, $1,100, no plan review fee.'
Building Permit Fee — general valuation table (used for non-single-family new residential construction, e.g. duplexes)$1 to $500: $32.45; $501–$2,000: $32.45 for the first $500 plus $4.20 per additional $100 or fraction; $2,001–$25,000: $95.31 for the first $2,000 plus $19.25 per additional $1,000; $25,001–$50,000: $538.72 for the first $25,000 plus $13.88 per additional $1,000; $50,001–$100,000: $885.22 for the first $50,000 plus $9.62 per additional $1,000; $100,001–$500,000: $1,366.47 for the first $100,000 plus $7.70 per additional $1,000; $500,001–$1,000,000: $4,446.47 for the first $500,000 plus $6.60 per additional $1,000; $1,000,001 and up: $7,712.10 for the first $1,000,000 plus $5.01 per additional $1,000Rock Springs Municipal Code § 150.08(B); this valuation table applies to all adopted codes (mechanical, plumbing, electrical included) unless a specific override applies
Plan Review Fee65% of the building permit fee§ 150.08(B)(1); waived for single-family homes and residential alterations/additions per the specific overrides
Reinspection Fee$100 per hour (or total hourly cost to the city, whichever is greater)§ 150.08(B), Other Inspections and Fees table, assessed under IBC Section 305.8
Inspections outside normal business hours$59 per hour—

Residential Addition / Remodel Permit

Verified

Required for additions, remodels, alterations, repairs, and detached garages on existing one- and two-family dwellings in Rock Springs. Charged at 50% of the general valuation-based fee table with no separate plan review fee.

Verified 2026-07-01 · Source

Requirements

  • Any enlargement, alteration, or repair of an existing building or structure requires a permit from the Building Official (§ 150.02(A)(1))
  • Applies to residential alterations and additions, including detached garages
  • Design must meet adopted design criteria: 30 psf ground snow load, 115 mph wind speed (Exposure C), 42-inch minimum frost depth for any new foundation work
  • Detached accessory buildings/garages over 1,500 sq ft combined require a conditional use permit before a building permit can be issued (§ 157.129(D)–(E))
  • Contractor must be registered with the City ($125 fee + insurance) if not the homeowner performing their own work

Required documents

  • RequiredBuilding Permit ApplicationCity of Rock Springs Building Permit Application form
  • RequiredSite PlanDimensioned site plan showing existing structures, proposed addition footprint, setbacks
  • OptionalDetail Sheet — Retaining WallCity standard detail sheet, available in the Building Inspections Document Center, if retaining walls are part of the project

Fee schedule

Fee typeAmountNotes
Residential alterations and additions, including detached garages50% of the general valuation-based fee table in § 150.08(B); no plan review fee chargedRock Springs Municipal Code § 150.08(B)(3)

Electrical Permit

Verified

Required for electrical wiring, alterations, and new installations within Rock Springs city limits. ISSUED BY THE CITY — Rock Springs holds delegated local electrical-enforcement authority under W.S. § 35-9-121 and runs its own City Electrical Inspector office (Rock Springs Municipal Code §§ 150.30–150.36), distinct from the Wyoming State Fire Marshal's default statewide electrical program. Per the WSFM 'LOCAL AND STATE JURISDICTIONS' chart (updated 5/11/2026), Rock Springs is listed ELEC INSP/PR = L/L.

Verified 2026-07-01 · Source

Requirements

  • No alterations or additions to existing wiring, and no new wiring of a building for lights, motors, heating devices, or any apparatus requiring electrical current, without first notifying the City Electrical Inspector and securing a permit (§ 150.32) — EXCEPT minor repair work such as repairing flush/snap switches, replacing fuses, changing lamp sockets/receptacles, taping bare joints, and repairing drop cords, which are exempt from permit
  • Upon completion of wiring, the installer must notify the Electrical Inspector, who inspects within 24 hours of notice; a certificate of inspection is required before the electrical service may be connected/energized (§ 150.33)
  • All wires to be concealed must be inspected before concealment — installer must give the Electrical Inspector 24 hours' notice before covering wires (§ 150.33)
  • Electrical work must conform to the adopted 2023 National Electrical Code (NFPA) and this subchapter before a certificate of inspection will issue (§ 150.34)
  • All electric wiring within any structure — except one- and two-family dwellings and multi-family structures under 6,000 sq ft — must be in approved conduits (§ 150.34)

Required documents

  • RequiredBuilding Permit ApplicationElectrical permits are processed through the same City of Rock Springs Building Permit Application / Building Inspection Office intake

Fee schedule

Fee typeAmountNotes
Electrical permit feeCharged under the general § 150.08(B) valuation-based building-permit fee schedule — no separate dedicated electrical fee line is published in the Municipal Code
§ 150.08(A) states the fee schedule applies to 'all adopted codes' (which includes the 2023 NEC per § 150.04) unless specifically overridden elsewhere in § 150.08(B); Show full citation

§ 150.08(A) states the fee schedule applies to 'all adopted codes' (which includes the 2023 NEC per § 150.04) unless specifically overridden elsewhere in § 150.08(B); no electrical-specific override exists, so electrical-only permits are charged under the same valuation table as building permits. This is a verified fact per the wy-framework.md clarification that 'charged under the general valuation table' is verified, not partial.

Penalty for violation of the electrical subchapter (§§ 150.30–150.36)Up to $100 fine plus court costs at the court's discretion, upon convictionRock Springs Municipal Code § 150.99(B)

Plumbing Permit

Verified

Required for plumbing installations, alterations, and repairs in Rock Springs. Governed by the 2024 International Plumbing Code (IPC) as adopted (with local amendments) by Rock Springs Municipal Code § 150.04. Charged under the general valuation-based building-permit fee schedule.

Verified 2026-07-01 · Source

Requirements

  • A permit from the Building Official is required for plumbing work associated with construction, alteration, or repair of a building or structure (§ 150.02(A)(1))
  • Restaurants and any food service facility must submit plans to the Sweetwater County Health Department in addition to city building permit review
  • Any code-mandated element requiring a Wyoming DEQ permit must be obtained and submitted prior to building permit issuance
  • Projects requiring grease traps, sand and grease interceptors, or special sewage treatment must be approved by the City of Rock Springs Pretreatment and Collections Supervisor (307-352-1466)

Required documents

  • RequiredBuilding Permit ApplicationPlumbing permits are processed through the City of Rock Springs Building Permit Application / Building Inspection Office

Fee schedule

Fee typeAmountNotes
Plumbing permit feeCharged under the general § 150.08(B) valuation-based building-permit fee schedule — no separate flat plumbing fee line is published§ 150.08(A): the IBC fee schedule applies to all adopted codes (including the 2024 IPC per § 150.04) unless a specific override is listed; no plumbing-specific override exists in § 150.08(B)
Sewer hookup feeCollected at building permit issuance if the property has not previously been assessed in a special sewer district and a prior connection fee has not been paidRock Springs Municipal Code § 150.02(A)(3); amount varies by connection — noted as a line item ('SEWER HOOK UP(S) FEE') on the Building Permit Application form

Mechanical / HVAC Permit

Verified

Required for heating, cooling, ventilation, and fuel gas installations in Rock Springs. Governed by the 2024 International Mechanical Code (IMC) and 2024 International Fuel Gas Code (IFGC) as adopted by Rock Springs Municipal Code § 150.04. Charged under the general valuation-based building-permit fee schedule.

Verified 2026-07-01 · Source

Requirements

  • A permit from the Building Official is required for mechanical/HVAC work associated with construction, alteration, or repair of a building (§ 150.02(A)(1))
  • Design loads and equipment must comply with the adopted 2024 IMC and 2024 IFGC (with appendices A, B, and C for fuel gas)

Required documents

  • RequiredBuilding Permit ApplicationMechanical/HVAC permits are processed through the City of Rock Springs Building Permit Application / Building Inspection Office

Fee schedule

Fee typeAmountNotes
Mechanical/HVAC permit feeCharged under the general § 150.08(B) valuation-based building-permit fee schedule — no separate flat mechanical fee line is published§ 150.08(A): the IBC fee schedule applies to all adopted codes (including the 2024 IMC and IFGC per § 150.04) unless a specific override is listed; no mechanical-specific override exists in § 150.08(B)

Roofing Permit (Reroof)

Verified

Required for roof replacement (tear-off and reroof) on residential and commercial buildings in Rock Springs. Governed by the 2024 IBC/IRC as adopted by § 150.04. Residential reroofs are charged at 50% of the valuation table as a residential alteration; a Detail Sheet — Roof is available from the Building Inspection Office's Document Center.

Verified 2026-07-01 · Source

Requirements

  • Complete roof replacement (tear-off and reroof) requires a permit from the Building Official (§ 150.02(A)(1))
  • Roof design must meet the adopted 30 psf ground snow load requirement
  • Residential reroofing is treated as a residential alteration for fee purposes

Required documents

  • RequiredBuilding Permit ApplicationRoofing permits are processed through the City of Rock Springs Building Permit Application / Building Inspection Office
  • OptionalDetail Sheet — RoofCity of Rock Springs standard roof detail sheet, available in the Building Inspections & Permits Document Center

Fee schedule

Fee typeAmountNotes
Residential reroof (treated as residential alteration)50% of the general valuation-based fee table in § 150.08(B); no plan review feeRock Springs Municipal Code § 150.08(B)(3) covers 'residential alterations and additions' at 50% of the table; reroofing is a residential alteration for fee purposes since no dedicated reroof fee line exists

Solar PV Permit

Verified

Required for installation of rooftop or ground-mounted solar photovoltaic systems in Rock Springs. Processed as a standard building permit under the 2024 IBC/IRC and 2023 NEC, subject to the general valuation-based fee schedule, with electrical inspection performed by the City Electrical Inspector.

Verified 2026-07-01 · Source

Requirements

  • A building permit is required for solar PV installation, covering structural (racking/attachment) and electrical (2023 NEC Article 690) scope
  • Structural design must account for the adopted 30 psf ground snow load and 115 mph wind speed (Exposure C)
  • Electrical scope requires City Electrical Inspector review/certificate of inspection before the system may be energized (§ 150.33)
  • Roof-mounted systems on structures in a Mine Subsidence classified area may require additional foundation/structural review — confirm with City Engineering (307-352-1540)

Required documents

  • RequiredBuilding Permit ApplicationSolar PV permits are processed through the City of Rock Springs Building Permit Application / Building Inspection Office
  • RequiredElectrical Plan / Single-Line DiagramRequired for City Electrical Inspector review of the PV system's electrical connections

Fee schedule

Fee typeAmountNotes
Solar PV permit (valuation-based)Charged under the general § 150.08(B) valuation-based building-permit fee schedule based on installation cost — no dedicated solar PV fee line is published§ 150.08(A) states the fee schedule applies to all adopted codes unless a specific override exists; no solar-specific override is listed in § 150.08(B), so solar PV is charged as ordinary valuation-based new construction/alteration work
Plan Review Fee65% of the building permit fee§ 150.08(B)(1), standard plan review fee applies unless the project qualifies as a residential alteration override

Accessory Dwelling Unit (ADU) Permit

Verified

Rock Springs' Zoning Ordinance (Rock Springs Municipal Code Chapter 157) explicitly permits ACCESSORY DWELLINGS as a use in the R-2 Low Density Residential Zone (§ 157.086(A)(2)), with detailed development standards at § 157.086(B)(13). An accessory dwelling requires BOTH a zoning determination (that the property is properly zoned R-2, or another zone where the use is separately listed in the Table of Uses) and a standard residential building permit for construction.

Verified 2026-07-01 · Source

Requirements

  • Zone eligibility: the R-2 Low Density Residential Zone is purpose-built to allow 'single-family detached dwellings, accessory dwelling units and directly related complementary uses' (§ 157.086(A)(2)); verify zoning of the specific parcel via the Table of Uses in § 157.086(B) or by contacting the Planning Office (307-352-1540)
  • Definition: an ACCESSORY DWELLING is 'a detached structure which is accessory to a single-family dwelling, located on the same lot as a single-family dwelling and placed on a permanent foundation, with no more than one bedroom and provides basic requirements for living, sleeping and sanitation' (§ 157.008)
  • General accessory-building rules apply (§ 157.129): not located in a front yard; not in a utility easement; combined accessory floor area over 1,500 sq ft requires a conditional use permit
  • Size: newly constructed or newly converted accessory dwelling square footage shall be no more than 75% of the principal building's square footage OR 800 sq ft, whichever is less; in no case less than 300 sq ft (§ 157.086(B)(13)(b))
  • Design: any newly constructed accessory dwelling must have roof pitch, siding, and exterior finish matching the principal building in style and material (existing pre-ordinance structures are exempt) (§ 157.086(B)(13)(c))
  • Parking: at least one off-street parking space dedicated solely to the accessory dwelling occupants, in addition to the principal building's required parking; this space may be inside the accessory dwelling structure if the remaining non-parking area is at least 300 sq ft (§ 157.086(B)(13)(d))
  • Owner occupancy: either the principal building or the accessory dwelling must be owner-occupied (§ 157.086(B)(13)(e))
  • Number: a maximum of ONE accessory dwelling is allowed per parcel or lot (§ 157.086(B)(13)(f))
  • Prohibited: mobile homes, recreational vehicles, motor vehicles, boats, and similar are NOT considered accessory dwellings (§ 157.086(B)(13)(g))
  • Once zoning eligibility and standards are confirmed, construction requires the standard Building Permit Application and is subject to the 2024 IRC/IBC and the general valuation-based fee schedule (or residential-alteration 50% rate if converting existing space)

Required documents

  • RequiredBuilding Permit ApplicationStandard City of Rock Springs Building Permit Application, required for ADU construction after zoning confirmation
  • RequiredSite PlanShowing the principal dwelling, proposed accessory dwelling location, required off-street parking space, and setbacks

Fee schedule

Fee typeAmountNotes
Building permit fee for a newly constructed accessory dwellingCharged under the general § 150.08(B) valuation-based fee schedule (new detached structure) or the 50% residential-alteration rate if converting existing accessory space — no ADU-specific fee line is published§ 150.08(A)/(B)(3); the fee mechanism depends on whether the ADU is new construction or a conversion, per the general building-fee rules

Demolition Permit

Verified

Required for demolition of buildings or structures in Rock Springs. Charged a flat fee, and a dedicated 'Permit - Demolition' document is available from the Building Inspection Office's Document Center.

Verified 2026-07-01 · Source

Requirements

  • A permit from the Building Official is required to demolish any building or structure (§ 150.02(A)(1))
  • Utility disconnects should be arranged/verified prior to demolition

Required documents

  • RequiredPermit - DemolitionCity of Rock Springs' dedicated demolition permit document, available in the Building Inspections & Permits Document Center

Fee schedule

Fee typeAmountNotes
Demolition permit (flat fee)$35.00Rock Springs Municipal Code § 150.08(B): 'Demolition permits $35'

Commercial Tenant Improvement Permit

Verified

Required for interior remodels, additions, and tenant improvements in commercial buildings in Rock Springs. Governed by the 2024 IBC as adopted by § 150.04. Charged under the general valuation-based fee schedule; new projects/additions of 5,000 sq ft or larger trigger the full nonresidential checklist (Wyoming-licensed design professionals for architectural, structural, mechanical/plumbing, and electrical plans).

Verified 2026-07-01 · Source

Requirements

  • A building permit is required for commercial remodels, additions, or tenant improvements (§ 150.02(A)(1))
  • Two sets of construction drawings required; for new structures/additions ≥5,000 sq ft: architectural plans stamped by a Wyoming registered architect, structural plans sealed by a Wyoming-licensed structural/civil engineer, mechanical/plumbing plans sealed by a Wyoming-licensed mechanical engineer, and electrical plans sealed by a Wyoming-licensed electrical engineer
  • Two sets of project specifications, if available
  • Site-specific soils investigation complying with 2024 IBC Section 1802; foundation design must be based on the soils report
  • Design loads shown on plans: 30 psf ground snow load, 115 mph wind speed (Exposure C), 42-inch minimum frost depth
  • Occupancy Group/Division and Type of Construction (per 2024 IBC) must be listed on the plans
  • Mine Subsidence classification must be listed per the adopted Mine Subsidence Risk Map — contact City Engineering (307-352-1540)
  • Dimensioned site plan showing utilities, setbacks, streets, alleys, and parking; contact the City Planner for zoning/floodplain requirements (307-352-1540)
  • Restaurants/food service facilities must submit plans to the Sweetwater County Health Department
  • Grease traps, sand/grease interceptors, or special sewage treatment require approval from the City's Pretreatment and Collections Supervisor (307-352-1466)
  • Any code-mandated DEQ permits must be obtained/submitted before the building permit is approved and issued
  • Two full sets and one electronic set of plans amended per plan review comments must be submitted prior to permit issuance

Required documents

  • RequiredBuilding Permit ApplicationCity of Rock Springs Building Permit Application, with special approvals routing for Zoning, Fire, Engineering, Soil Report, and Health Dept.
  • RequiredNonresidential Building Permit Application ChecklistCity of Rock Springs' checklist for any new project that is not a single-family home (per the Building Ordinances page)

Fee schedule

Fee typeAmountNotes
Commercial building/tenant improvement permit fee (valuation-based)Charged under the § 150.08(B) general valuation-based fee schedule — same table used for residential new construction, scaled by project valuation
§ 150.08(A): the fee schedule applies to all adopted codes for commercial/nonresidential work; Show full citation

§ 150.08(A): the fee schedule applies to all adopted codes for commercial/nonresidential work; no commercial-specific override exists in § 150.08(B), so the general table applies in full (not the 50% residential-alteration rate, which is limited to residential alterations/additions)

Plan Review Fee65% of the building permit fee§ 150.08(B)(1)
Additional plan review (changes/revisions to plans)$59 per hour (minimum charge: one-half hour)§ 150.08(B), Other Inspections and Fees table
Outside consultants for plan checking/inspectionsActual costs (including administrative and overhead costs)§ 150.08(B), Other Inspections and Fees table, note 2

EV Charging Station Permit (Electrical Permit)

Verified

Required for installation of a Level 2 (or higher) electric vehicle charging station/EVSE in Rock Springs, processed as a standard electrical permit under the 2023 NEC (including Article 625, Electric Vehicle Power Transfer System) as adopted by the City. Rock Springs Municipal Code § 150.08(B) has no dedicated electrical-only fee line, let alone an EV-specific one — the same finding this file's electrical-permit and solar-pv-permit entries document — so an EV charger install is charged under the general valuation-based building-permit fee schedule, with electrical inspection performed by the City's own Electrical Inspector program (not the state).

Verified 2026-07-20 · Source

Requirements

  • A permit is required for the EV charger's electrical scope, covering the new/upgraded circuit and EVSE connection under the 2023 NEC (§ 150.04, Codes Adopted)
  • Electrical scope requires City Electrical Inspector review/certificate of inspection before the system may be energized (§ 150.33)
  • Fee is charged under the general § 150.08(B) valuation-based fee schedule based on installation cost, since no electrical-specific or EV-specific override exists in the Municipal Code
  • 24 hours' notice must be given to the City Electrical Inspector before concealment of new wiring (§ 150.33)

Required documents

  • RequiredBuilding Permit Application (electrical scope)EV charger permits are processed through the City of Rock Springs Building Permit Application / Building Inspection Office; no dedicated EV/EVSE application exists
  • RequiredElectrical Plan / Single-Line DiagramRequired for City Electrical Inspector review of the EVSE circuit's electrical connections

Fee schedule

Fee typeAmountNotes
EV charger/EVSE electrical permit (valuation-based)Charged under the general § 150.08(B) valuation-based building-permit fee schedule based on installation cost — no dedicated electrical-only or EV-specific fee line is published
§ 150.08(A) states the fee schedule applies to 'all adopted codes' (which includes the 2023 NEC per § 150.04) unless specifically overridden elsewhere in § 150.08(B); Show full citation

§ 150.08(A) states the fee schedule applies to 'all adopted codes' (which includes the 2023 NEC per § 150.04) unless specifically overridden elsewhere in § 150.08(B); no electrical-specific or EV-specific override exists, so EV charger permits are charged under the same valuation table as building permits generally, the same treatment already documented in this file's electrical-permit entry.

Plan Review Fee65% of the building permit fee§ 150.08(B)(1), standard plan review fee applies unless the project qualifies as a residential alteration override

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Rock Springs building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

← Earlier version (2026-07-01)Later version (2026-07-22) →View current record →All versions →