This is PermitBase’s published record for Unincorporated Sweetwater County as of 2026-07-01. It has since been superseded — see the current record. A historical record reflects what PermitBase had verified at that time; it may not capture a real-world change the jurisdiction had made but PermitBase had not yet verified, and it includes any errors we later corrected. Snapshots are never edited retroactively.

Unincorporated Sweetwater County building permits

Verified

Unincorporated Sweetwater County, Wyoming — as published 2026-07-01.

Verified 2026-07-01 · Source

Codes adopted

No countywide building code and no county building permit for private construction. Sweetwater County has not taken delegated building-code enforcement authority under Wyoming Statute 35-9-121; the Wyoming Dept. of Fire Prevention & Electrical Safety's "Local and State Jurisdictions" chart lists Sweetwater County BLDG INSP/PR as state (S/S), meaning the State Fire Marshal, not the county, holds building-code jurisdiction (https://wsfm.wyo.gov/electrical-safety, chart updated 5/11/2026).Confirmed independently on the county's own site: the Land Use Department's page states construction in unincorporated Sweetwater County requires an approved ZONING permit (not an IBC/IRC building-code permit) — 'All residential, commercial, industrial and mineral construction and use in the unincorporated areas of Sweetwater County requires an approved zoning permit' (https://www.sweetwatercountywy.gov/departments/land_use/index.php).The county's own Development Codes page lists only land-use/zoning instruments — the 2015 Zoning Resolution, Growth Management Plan, Subdivision Regulations, Comprehensive Plan, and Federal Lands and Resources Plan — with no adopted IBC/IRC/NEC building-code edition (https://www.sweetwatercountywy.gov/departments/land_use/development_codes.php).

Permit types & fees

Zoning/Construction Permit (Land Use) — not a building-code permit

Verified

Sweetwater County does not issue a code-enforcement building permit for private construction. Instead, the county's Land Use Department requires an approved ZONING permit before any residential, commercial, industrial, or mineral construction/use begins in the unincorporated county — most projects use the 'Construction' application (which also covers oil & gas well permitting). This is a land-use/zoning approval, not an IBC/IRC building-code plan review or inspection program.

Verified 2026-07-01 · Source

Requirements

  • Confirm zoning district and any Growth Management Plan overlay requirements (Rock Springs/Green River growth-area) before applying
  • Submit the 'Construction' application form (covers residential and non-residential construction, including oil & gas wells) available from the Land Use Office
  • Submit an Address application if establishing a new address is also needed
  • Apply BEFORE construction begins — the county assesses a Late Application Fee for construction started without an approved permit application
  • Contact the Land Use Office (307-872-3914 or 922-5430) if unsure which application applies to your project

Required documents

  • RequiredConstruction & Address Permit ApplicationPrimary zoning/land-use application form for residential, commercial, industrial, and mineral construction (including oil & gas wells) in unincorporated Sweetwater County
  • RequiredSite planPer the county's published 'Example - Site Plan Requirements' guidance sheet available from the Land Use Office application forms page

Fee schedule

Fee typeAmountNotes

Septic / Small Wastewater System Permit

Verified

New or replacement septic (onsite wastewater) systems in unincorporated Sweetwater County are permitted through the Sweetwater County District Board of Health's Environmental Health division, not the Land Use building/zoning office. Approval of septic applications is by appointment only.

Verified 2026-07-01 · Source

Requirements

  • Obtain and complete the Conventional Septic System Application Package from Environmental Health
  • Schedule an appointment — the county approves all septic applications by appointment only
  • Larger or non-conventional systems may fall under Wyoming DEQ small-wastewater-system permitting rather than the county's conventional-system program

Required documents

  • RequiredConventional Septic System Application PackageCounty Environmental Health's septic application PDF packet

Fee schedule

Fee typeAmountNotes

County Access / Driveway Permit (Public Works — Engineering)

Verified

New road access onto a county road, or any work/activity within a county road right-of-way not covered by a utility license, requires a County Access Permit from the Public Works Department's Engineering division. Utility lines crossing or paralleling a county road use a separate County Utility License (Type A for buried lines, Type B for overhead/short-parallel lines).

Verified 2026-07-01 · Source

Requirements

  • Submit the County Access/Driveway Permit Application Form for any new road access onto a county road
  • Use County License Type A for buried utility lines crossing or paralleling a county road 1,000+ feet
  • Use County License Type B for overhead utility crossings or parallel runs under 1,000 feet
  • Note: the County Address Permit itself is now issued through the Land Use (Planning & Zoning) application, not through Public Works

Required documents

  • RequiredCounty Access/Driveway Permit ApplicationPublic Works Engineering's access-permit application form
  • OptionalCounty License Type A or Type B ApplicationRequired only for utility-line road crossings/parallel runs, not for driveway access itself

Fee schedule

Fee typeAmountNotes

Electrical Wiring Permit (State Program)

Verified

Sweetwater County has not taken delegated electrical-enforcement authority, so electrical wiring permits in unincorporated Sweetwater County (including Green River, per the WSFM chart) are issued by the Wyoming State Fire Marshal's Office — Dept. of Fire Prevention & Electrical Safety (Chief Electrical Inspector) under the 2023 NEC, not by the county.

Verified 2026-07-01 · Source

Requirements

  • Apply through the state's online portal (wyelectrician.imagetrendlicense.com) or the regional inspector office (nearest listed regional offices include Green River)
  • Standard wiring permit fee is $50 ($40 for temporary/90-day); the permit fee is waived if you pay for an inspection instead
  • Residential inspection fees (include the $50 permit): 100A $70, 125A $82.50, 150A $95, 200A $120, 300A $170, 400A $220

Required documents

    Fee schedule

    Fee typeAmountNotes
    Standard wiring permit$50$40 for temporary/90-day permit; waived if an inspection is requested and paid for
    Residential inspection, 100A$70Includes the $50 permit fee
    Residential inspection, 200A$120Includes the $50 permit fee

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-01.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Sweetwater County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    Later version (2026-07-17) →View current record →All versions →