Codes adopted
Permit types & fees
Land Use Certificate (Zoning / Use Approval)
VerifiedUinta County has NO general building permit or building code for private construction in the unincorporated county. Instead, new construction or alteration of a structure on unincorporated land requires a Land Use Certificate — a zoning/land-use compliance approval issued by the Planning Department under the Uinta County Land Use Plan Resolution 23-02 (adopted per W.S. Title 18, Ch. 5, § 18-5-201). This is NOT an IBC/IRC construction permit — there is no county plan review against a building code and no county construction-progress inspections (footing, framing, MEP rough-in, final) for ordinary private construction.
Verified 2026-07-17 · Source
Requirements
- Required for new construction of, or alteration to, a structure on private land in unincorporated Uinta County
- Application submitted on the county's Land Use Certificate form to the Planning Department
- If an address must be assigned for a dwelling in conjunction with the certificate: $50.00 application fee
- If the structure is a barn, shop, or other structure not requiring an address: $25.00 application fee
- Uses NOT requiring a Use Certificate: grazing livestock; raising/harvesting forage or grain crops; timber harvesting (raw, not processing); public/private utilities not involving a structure or land-use change by coverage/enclosure
- Any utility work that involves erecting a structure or changing land use by coverage/enclosure DOES require a Use Certificate
- Also required (as a Use Certificate Permit) before construction/development begins within any FEMA Special Flood Hazard Area — see floodplain notes in tipsAndGotchas
- Violations are subject to a fine of up to $750.00 per separate violation
Required documents
- RequiredUinta County Land Use Certificate Application (fillable PDF)County application form for the Land Use Certificate
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Land Use Certificate — dwelling (address assignment required) | $50.00 | Uinta County Land Use / Building Permits page |
| Land Use Certificate — barn/shop/no address required | $25.00 | Uinta County Land Use / Building Permits page |
Floodplain Development (Use Certificate in Special Flood Hazard Area)
VerifiedA Use Certificate (the same Land Use Certificate mechanism, applied to flood-hazard areas) must be obtained BEFORE any construction or development begins within an area of special flood hazard shown on the FEMA Flood Insurance Rate Maps for unincorporated Uinta County. Administered by the Planning Department under Chapter 4 (Flood Hazard Area Overlay District) of the Uinta County Land Use Resolution.
Verified 2026-07-01 · Source
Requirements
- Applies to all areas of special flood hazard within unincorporated Uinta County per the Flood Insurance Study for Uinta County, Wyoming (unincorporated areas), dated February 2010
- Use Certificate application must include plans showing nature, location, dimensions, and elevation of the site; existing/proposed structures, fill, storage of materials, and drainage facilities
- Must show elevation (relative to mean sea level) of the lowest habitable floor of all structures, or flood-proofing elevation if flood-proofed
- Nonresidential flood-proofing must be certified by a registered professional engineer or architect
- New construction and substantial improvements must be anchored to prevent flotation/collapse/lateral movement; manufactured homes have specific tie-down standards
- Planning Department reviews all development permits for compliance and coordinates with any other required federal/state/local permits
- Appeals go to the Planning Commission, then the Board of County Commissioners, then the Third Judicial District Court
Required documents
- RequiredLand Use Certificate Application (used for flood hazard area development)Same countywide Land Use Certificate application, submitted with additional flood-hazard-area plan detail
- OptionalElevation Certificate (FEMA NFIP form)Documents lowest-floor elevation relative to base flood elevation
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Use Certificate application fee | $50.00 (dwelling/address required) or $25.00 (no address required) | Same fee structure as the standard Land Use Certificate; no separate flood-specific fee found — charged under the general Use Certificate fee |
Road / Driveway Access Permit
VerifiedRequired to construct any new access (driveway) onto a county road right-of-way in unincorporated Uinta County. Issued by Uinta County Planning & Zoning, subject to the Uinta County Road Access Encroachment Resolution; the Road & Bridge Foreman may add stipulations and performs the final inspection.
Verified 2026-07-17 · Source
Requirements
- Required before constructing a new access onto a county road or county right-of-way
- Application submitted to Uinta County Planning Office, 225 9th Street, Evanston, WY 82930
- Maximum access width: 24 feet for agricultural/residential access; 40 feet for commercial, industrial, or subdivision roadway access
- Access surface, drainage structure (if required), and location must be shown on a plot plan on the reverse of the application
- Permit becomes void if construction has not started within 30 days of approval
- County Road Foreman must be notified 24 hours before construction begins; work must be completed within 90 days
- Applicant must call the County Road Foreman for final inspection and approval before the access is considered complete
- Applicant assumes responsibility for safe construction/maintenance and holds the county harmless for damages arising from the access
Required documents
- RequiredUinta County Road Access Permit Application (PDF)Application form including plot-plan section on the reverse side
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Application Fee | $25.00 | Printed directly on the Uinta County Road Access Permit Application form |
Small Wastewater (Septic) Permit
VerifiedA Small Wastewater Permit is required for construction, installation, or modification of a small wastewater (septic) system in unincorporated Uinta County. Administered directly by Uinta County Planning & Zoning under the Uinta County Small Wastewater Regulations (amended December 2016), consistent with Wyoming's Environmental Quality Act framework for small wastewater systems.
Verified 2026-07-17 · Source
Requirements
- Required for construction, installation, or modification of any small wastewater (septic) system
- Systems must be installed by a licensed installer, OR the property owner may install their own system under guidance of the county's Small Wastewater Resolution and the Wastewater Engineer
- Process: (1) obtain the Small Wastewater Permit Application from Planning & Zoning; (2) conduct groundwater observation cut and percolation tests; (3) submit the septic permit application with design layout to Planning & Zoning; (4) obtain the county-issued Small Wastewater Permit to Construct; (5) install per approved design; (6) Planning & Zoning inspects the system BEFORE backfilling; (7) obtain the Small Wastewater Facility Permit with permission to backfill
- The county can require excavation/removal/rebuild of a non-compliant system found during inspection
- Issuance of a permit to construct does not relieve the permittee of responsibility for proper design, construction, operation, and maintenance
Required documents
- RequiredSmall Wastewater (SWW) Design Application Package (PDF)County application package for septic system design/construction/modification permits
- OptionalSite Preparation for Percolation Testing & Observation Pit Pamphlet (PDF)Guidance for preparing the site for required percolation and groundwater observation testing
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Small Wastewater Permit application fee | $150.00 | Uinta County Wastewater/Septic System page — 'The application fee for a Small Wastewater Permit is $150.00' |
Electrical Permit (State Program)
VerifiedUinta County does NOT run its own electrical inspection program at the county level. Per the WSFM 'LOCAL AND STATE JURISDICTIONS' chart, Uinta County unincorporated = ELEC INSP/PR: S/S, so electrical wiring permits for private construction in unincorporated Uinta County are issued by the Wyoming State Fire Marshal's Office — Dept. of Fire Prevention & Electrical Safety (Chief Electrical Inspector) under the statewide default program (W.S. § 35-9-119), enforcing the 2026 National Electrical Code (the 2026 NEC became effective statewide July 1, 2026, superseding the prior 2023 edition; confirmed on the WSFM electrical-safety page 2026-07-17).
Verified 2026-07-17 · Source
Requirements
- Apply through the state electrical program's online portal (wyelectrician.imagetrendlicense.com)
- Standard wiring permit fee: $50.00 (temporary/90-day permit: $40.00); permit fee is waived if you request and pay for an inspection
- Residential inspection fees (which include the $50 permit): 100A $70.00; 125A $82.50; 150A $95.00; 200A $120.00; 300A $170.00; 400A $220.00
- As of 2026-07-17, the WSFM Wiring Permits page lists Dan Tobin as covering Uinta County (along with Fremont, Sublette, Lincoln and Teton counties), 307-690-8017, daniel.tobin@wyo.gov — the page's own formatting leaves it ambiguous whether a '(Licensing Only)' qualifier applies to his whole county list or just Teton, so confirm current inspector/inspection-vs-licensing assignment for Uinta County with the WSFM electrical program before relying on this name alone
Required documents
- RequiredState Electrical Wiring Permit Application (online portal)Submitted via the Wyoming electrician licensing/permitting portal
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Standard Wiring Permit | $50.00 (waived if inspection fee is paid) | WY State Fire Marshal electrical program fee schedule |
| Temporary (90-day) Wiring Permit | $40.00 | — |
| Residential Inspection — 100A service | $70.00 (includes the $50 permit) | — |
| Residential Inspection — 200A service | $120.00 (includes the $50 permit) | — |
Solar / Alternative Energy PV Permit (State Plan Review) + Land Use Certificate
VerifiedUnincorporated Uinta County has no county-run solar permit or building code (see land-use-certificate). A rooftop or ground-mount solar PV installation requires: (1) a Wyoming State Fire Marshal's Office (Dept. of Fire Prevention & Electrical Safety) Plan Review, using the state's dedicated 'Electrical PV Plan Checklist' — because Uinta County has not taken delegated electrical authority (WSFM chart: ELEC INSP/PR = S/S), this state-level review applies here just as it does to standard electrical wiring; and (2) a county Land Use Certificate as the alteration-to-a-structure zoning approval, using the same $50 (dwelling/address required) or $25 (no address required) fee as any other construction/alteration — there is no distinct county solar fee or application. Uinta County's own Land Use Resolution 23-02 was checked in full and contains no solar-specific provisions (no accessory-use size threshold, no setback rule) — solar is not separately addressed in county zoning here, unlike some neighboring Wyoming counties (e.g., Sweetwater, Laramie) that do have dedicated solar accessory-use standards.
Verified 2026-07-20 · Source
Requirements
- State Plan Review required for 'Alternative Energy installation or alteration (solar, residential wind, generator, etc.)' per the Wyoming State Fire Marshal's Dept. of Fire Prevention & Electrical Safety — applies statewide wherever the WSFM (not a delegated county) holds electrical jurisdiction, which includes unincorporated Uinta County
- Submit plans via the WSFM eLicensing/ePermit/ePayment Portal using the dedicated 'Electrical PV Plan Checklist'
- Plans are accepted or rejected for review within 5 business days of receipt; a complete submittal is reviewed within 21 business days of acceptance (or 10 business days after any additional requested information is received, whichever is greater)
- Review fees are calculated per the ICC Building Valuation Data table and the Department of Fire Prevention and Electrical Safety Rules, Chapter 2, Section 3 — the applicant is notified of the fee due once plans are accepted; fees must be paid before a Permit to Construct is issued
- No work may begin before the Permit to Construct is issued
- A county Land Use Certificate is also required for the structural alteration itself, at the standard $50 (address/dwelling) or $25 (no address) fee, per the Uinta County Land Use Certificate process (see land-use-certificate entry) — Uinta County's Land Use Resolution 23-02 contains no solar-specific accessory-use standard, so ordinary new-construction/alteration rules apply
- Uinta County is served by WSFM electrical inspector Dan Tobin (covers Fremont, Sublette, Uinta, Lincoln, and Teton counties; the WSFM page's own formatting leaves ambiguous whether a '(Licensing Only)' qualifier applies county-wide or just to Teton — confirm current inspection-vs-licensing-only status for Uinta directly with WSFM)
Required documents
- RequiredElectrical PV Plan Checklist (WSFM)State Fire Marshal's dedicated plan-review checklist for solar photovoltaic installations, submitted through the WSFM ePermit portal
- RequiredUinta County Land Use Certificate ApplicationCounty zoning/alteration approval for the physical installation, same form used for general construction/alteration
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Land Use Certificate — dwelling (address assignment required) | $50.00 | Uinta County Land Use / Building Permits page — same fee as general new construction/alteration; no distinct solar fee found |
| Land Use Certificate — barn/shop/no address required | $25.00 | Uinta County Land Use / Building Permits page |
| WSFM Alternative Energy (Solar PV) Plan Review Fee | Valuation-based, per the ICC Building Valuation Data table and Dept. of Fire Prevention & Electrical Safety Rules Chapter 2, Section 3 — applicant notified of the exact fee once plans are accepted | Wyoming State Fire Marshal, Wiring Permits page (wsfm.wyo.gov/electrical-safety/wiring-permits-1); no flat statewide dollar figure is published for this line item — it is calculated per-project |
| Standard Wiring Permit (if a separate wiring permit is also needed) | $50.00 ($40.00 temporary/90-day; waived if an inspection is requested and paid for) | WSFM statewide electrical program fee schedule |
Electric Vehicle (EV) Charging Station / EVSE Permit (State Wiring Permit Program)
VerifiedUnincorporated Uinta County has no county-run electrical program and no dedicated EV charger/EVSE permit or fee. Per the WSFM 'LOCAL AND STATE JURISDICTIONS' chart, Uinta County unincorporated = ELEC INSP/PR: S/S, so an EV charging station installation is permitted through the same statewide Wyoming State Fire Marshal's Office (Dept. of Fire Prevention & Electrical Safety) wiring-permit program used for the county's electrical-permit entry, not a county process. The WSFM's 'Wiring Permits' page -- which lists the specific project categories requiring the more involved Plan Review process (government/school/large public-access buildings, fire protection systems, Alternative Energy installations such as solar/wind/generators, flammable-liquid storage/dispensing, commercial kitchen hoods, spray finishing, and RV/mobile-home park site plans) -- does not list EV charging stations among those Plan-Review-triggering categories, confirming that a standard EVSE circuit addition is processed as an ordinary Standard Wiring Permit rather than requiring the more extensive Alternative Energy plan review used for solar.
Verified 2026-07-20 · Source
Requirements
- No standalone EV charger/EVSE permit application exists; EVSE circuit and charger installation is permitted through the WSFM's standard state electrical Wiring Permit process, applied for via the state's online portal (wyelectrician.imagetrendlicense.com)
- EV charging stations are NOT listed among the WSFM's Plan-Review-required project categories (which cover Alternative Energy/solar/wind/generator installations, fire protection systems, and certain large/public buildings) -- a standard wiring permit, not the more involved Alternative Energy plan review, applies
- Enforced under the 2026 National Electrical Code (effective statewide July 1, 2026), which includes NEC Article 625 (Electric Vehicle Power Transfer System) provisions for EVSE branch circuits and disconnects
- As of 2026-07-17 the WSFM Wiring Permits page lists Dan Tobin as covering Uinta County electrical inspections (along with Fremont, Sublette, Lincoln, and Teton counties), 307-690-8017, daniel.tobin@wyo.gov
Required documents
- RequiredState Electrical Wiring Permit Application (online portal)Same standard state wiring-permit application used for general electrical work in unincorporated Uinta County; no EV-specific application exists
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Standard Wiring Permit (EV charger/EVSE circuit) | $50.00 (waived if an inspection fee is paid) | WSFM statewide electrical program fee schedule -- same fee line used for general electrical work; no distinct EV charger fee exists |
| Residential Inspection fee (service-size-based, includes the $50 permit) | 100A $70.00; 125A $82.50; 150A $95.00; 200A $120.00; 300A $170.00; 400A $220.00 | WSFM statewide electrical program fee schedule; a dedicated EVSE circuit sub-panel/disconnect would be billed under this same residential inspection fee structure based on the amperage of the circuit/service involved |
Sign Regulations (Outdoor Advertising Signs) — No Standalone Permit
VerifiedUnincorporated Uinta County has no standalone sign-permit application or fee. Signage — defined broadly in the Uinta County Land Use Resolution 23-02 (Chapter 2, Definitions) as an 'Outdoor advertising sign': 'any outdoor sign, display, light, device, figure, painting, drawing, message, plaque, poster, billboard, or any other thing which is designed, intended, or used to advertise or inform and which is visible from any place on the main traveled way of the Wyoming State Highway Department interstate or primary systems or any official county road' — is regulated purely as a zoning/dimensional standard under Chapter 5, Section 2(o) of the Resolution, not as a separate permit product. Outdoor advertising signs are allowed only in the Commercial and Industrial Zoning Districts. A sign beyond 150 feet from the nearest residence or Residential Zoning District boundary is allowed by right within stated dimensional limits; a sign within 150 feet of a residence/Residential District boundary, or exceeding those dimensional limits, instead requires the county's standard Conditional Use Permit ($200.00, Chapter 7 procedure). Chapter 5, Section 6(g) separately restricts on-site advertising signs specifically within the Industrial Zoning District (no flashing/blinking/moving parts; max 100 sq ft; max 15 ft height).
Verified 2026-07-22 · Source
Requirements
- Outdoor advertising signs (the Resolution's broad defined term, covering essentially any sign, display, or message visible from a state highway, interstate, primary route, or official county road — not just billboards) are allowed only in the Commercial and Industrial Zoning Districts, per Land Use Resolution 23-02, Chapter 5, Section 2(o)
- A sign located within 150 feet of the nearest residence or nearest Residential Zoning District boundary is allowed only through the Conditional Use Permit process
- A sign located beyond 150 feet of the nearest residence/Residential District boundary is allowed by right, but limited to: sign face height 14 feet; sign face width 48 feet; overall sign height 100 feet above the existing grade at the sign location, or 50 feet above the grade of the nearest interstate/state highway/county road, whichever is greater
- Signs larger in sign-face dimensions or total height than the above may be allowed only by Conditional Use Permit
- Requests for zone-district map amendments made for the sole purpose of installing outdoor advertising will not be approved
- Outdoor advertising signs are not allowed within the rights-of-way of Federal and Wyoming State Highways
- On-site advertising signs specifically within the Industrial Zoning District may not have flashing, blinking, or moving parts, may not exceed 100 square feet, and may not exceed 15 feet in height (Land Use Resolution 23-02, Chapter 5, Section 6(g))
- No dedicated sign-permit application, fee, or inspection process exists in unincorporated Uinta County apart from the standard Conditional Use Permit (only if the 150-foot/dimensional thresholds above are triggered)
Required documents
- OptionalUinta County Conditional Use Permit ApplicationOnly required if the sign is within 150 feet of a residence/Residential Zoning District boundary, or exceeds the by-right dimensional standards; includes a map of the land and a description of the proposed sign
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Conditional Use Permit (only if the sign is within 150 ft of a residence/Residential District boundary, or exceeds the standard dimensional limits) | $200.00 | Uinta County Land Use Resolution 23-02 fee schedule (Resolution amending fees, adopted January 3, 2023) |
| Compliant by-right sign (beyond 150 ft, within dimensional standards) | $0.00 — no application or fee found | No standalone sign-permit fee or application exists for signs that already meet the Chapter 5, Section 2(o) dimensional/location standards |
Fire Sprinkler / Fire Alarm / Fire Suppression System Permit (State Plan Review + County Fire Authority)
Unincorporated Uinta County has no standalone county-issued sprinkler/alarm permit application or published local fee schedule. Installation, addition, or alteration of ANY fire protection system (fire alarm, fire sprinkler, or fire suppression) requires a mandatory Wyoming State Fire Marshal's Office (Dept. of Fire Prevention & Electrical Safety) Plan Review 'regardless of size or valuation,' submitted through the WSFM eLicensing/ePermit/ePayment Portal — no work may begin before the state's Permit to Construct is issued. Locally, fire-code enforcement authority for Uinta County (including the unincorporated county) is held by the Uinta County Fire Protection & EMS Joint Powers Board — the countywide fire authority with a fire chief in Evanston and one in Bridger Valley — which Uinta County Resolution 24-44 (Nov 2024) empowers by adopting the 2024 ICC fire code text under the county's DELEGATED fire-prevention authority (W.S. § 35-9-121, 'Council for Fire Prevention,' the county acting as delegated authority of the State Fire Marshal/Director; see codesAdopted). No published local Joint Powers Board permit fee schedule, application form, or distinct local inspection process specific to fire sprinkler/alarm work was found on the county's official site despite an active search — this is a genuine documentation gap, not confirmation that no local review occurs. Confirm current local Fire District review/inspection requirements directly with the Fire District (Evanston 307-789-3013; Bridger Valley 307-783-1000) in addition to completing the mandatory state WSFM plan review.
Reviewed 2026-07-22 · Source
Requirements
- A Wyoming State Fire Marshal's Office Plan Review is mandatory for 'installation, addition, or alteration of fire protection systems (i.e. fire alarm, fire sprinkler, fire suppression) regardless of size or valuation' — this applies statewide, including unincorporated Uinta County
- Register on and submit through the WSFM eLicensing, ePermit, and ePayment Portal, using the applicable Plan Review Checklist for the system type
- Plans are accepted or rejected for review within 5 business days of receipt; a complete submittal is reviewed within 21 business days of acceptance (or 10 business days after receipt of any additional requested information, whichever is greater)
- No work may begin before the state's Permit to Construct is issued
- Review fees are calculated per the Department of Fire Prevention and Electrical Safety Rules, Chapter 2, Section 3 — no flat statewide dollar figure is published; the applicant is notified of the exact fee once plans are accepted
- Uinta County's own fire-code enforcement authority is delegated to and performed by the Uinta County Fire Protection & EMS Joint Powers Board under Resolution 24-44 (adopting the 2024 ICC fire code text under W.S. § 35-9-121 delegated fire-prevention authority) — confirm with the Fire District whether a separate local sign-off, inspection, or fee applies to a specific sprinkler/alarm project in addition to the mandatory state plan review, since no local fee schedule is published online
- This state plan-review requirement applies even though Uinta County has NOT taken general building-permit delegation (there is no county building permit for the surrounding construction — see land-use-certificate) — fire protection systems are reviewed under a separate, independent statutory trigger regardless of that fact
Required documents
- RequiredWSFM Plan Review Checklist (Fire Alarm / Fire Sprinkler / Fire Suppression, as applicable)State Fire Marshal's dedicated plan-review checklist for the specific fire protection system type, submitted through the WSFM ePermit portal
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| WSFM Fire Protection System Plan Review Fee | Valuation-based, per the Department of Fire Prevention & Electrical Safety Rules, Chapter 2, Section 3 — no flat statewide figure is published; applicant notified of the exact fee once plans are accepted | Wyoming State Fire Marshal, Fire Prevention Plan Review page (wsfm.wyo.gov/fire-prevention/plan-review); same valuation-based structure documented for this jurisdiction's solar-pv-permit entry |
| Local Uinta County Fire Protection & EMS Joint Powers Board fee (if applicable) | Not published — genuine gap | An active search of the county's official web presence found no published local sprinkler/alarm permit fee schedule or application; confirm directly with the Fire District |
Change of Use (via Land Use Certificate) — No Separate Change-of-Use Product
VerifiedUnincorporated Uinta County does not have a distinct 'change of use' permit or a certificate of occupancy separate from the county's existing Land Use Certificate. Chapter 11 (Administration and Enforcement), Section 1 of the Uinta County Land Use Resolution 23-02 provides: 'No land shall be subdivided, nor shall the use of any land or structure be changed, nor shall any land be developed without first obtaining a Subdivision Permit, Map Amendment, Variance, Conditional Use Permit or Use Certificate as required by this resolution.' Section 2 further provides: 'It is unlawful to locate, erect, construct, reconstruct, enlarge, or change any building or land use within any area included in this Land Use Resolution without first obtaining a Use Certificate from the Board of County Commissioners or their agent.' A change of use of an existing building or parcel in unincorporated Uinta County is therefore processed through the SAME Land Use Certificate mechanism already documented in this jurisdiction's land-use-certificate permit type ($25.00-$50.00 administrative approval), not a separate application or fee. There is also no county-issued Certificate of Occupancy — consistent with the fact that Uinta County has no countywide building code, construction plan review, or building-inspection sign-off sequence for private construction (see codesAdopted and the land-use-certificate entry).
Verified 2026-07-22 · Source
Requirements
- A Use Certificate (the same Land Use Certificate product documented in this jurisdiction's land-use-certificate entry) is required before any change in the use of an existing building or land parcel in unincorporated Uinta County, per Land Use Resolution 23-02, Chapter 11, Sections 1-2
- The Planning Department shall issue the Use Certificate upon finding the new use is: (1) compatible with, and a use-by-right (residential, commercial, agricultural, industrial, etc.) in the zoning district where the property is located; and (2) conforms with all applicable Chapter 5 development/performance standards
- If the proposed new use is NOT a use-by-right in that zoning district, a Conditional Use Permit ($200.00, Chapter 7 procedure) is required instead of the standard administrative Use Certificate
- No fee distinct from the standard Land Use Certificate fee exists for a pure change of use: $50.00 if an address assignment is required, $25.00 if not (same fee schedule used for new construction/alteration)
- There is no county-issued Certificate of Occupancy in unincorporated Uinta County — the county performs no construction-progress or final building inspections for private construction; the Use Certificate is the compliance record for a use, not a post-construction occupancy sign-off
- If the change of use also involves erecting a structure or altering land coverage/enclosure, this independently triggers the Use Certificate requirement per Chapter 11, Section 3(e), regardless of any other exemption that might otherwise apply to the use itself
Required documents
- RequiredUinta County Land Use Certificate Application (fillable PDF)Same countywide Use Certificate application used for new construction/alteration; there is no separate change-of-use form
- OptionalUinta County Conditional Use Permit ApplicationOnly required if the new use is not a use-by-right in the applicable zoning district
Fee schedule
| Fee type | Amount | Notes |
|---|---|---|
| Use Certificate — dwelling (address assignment required) | $50.00 | Same fee as this jurisdiction's land-use-certificate entry; no distinct change-of-use fee exists |
| Use Certificate — no address required | $25.00 | Same fee as this jurisdiction's land-use-certificate entry |
| Conditional Use Permit (only if the new use is not a use-by-right in the zoning district) | $200.00 | Uinta County Land Use Resolution 23-02 fee schedule (Resolution amending fees, adopted January 3, 2023) |
Sources & verification
Verified against official sources. Last reviewed 2026-07-01.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Uinta County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.