Version history — Eagar, Arizona
This is PermitBase’s own verified record for Eagar, reconstructed from this dataset’s version-controlled history. Each version below reflects what our record stated as of that date — it is not a warranty of what Eagar’s actual law was at that time.
Permanent link to today’s record
Look up a specific date
Pick a date and we’ll show you the record as it stood then.
All versions
- 2026-08-21Current record
- 2026-07-23Superseded
- Eagar, Arizona — Sign Permit record added
- Eagar, Arizona — Fire Sprinkler / Fire Alarm Permit (via Commercial or Residential Building Permit) record added
- Eagar, Arizona — Change of Use (via Commercial Building Permit) -- No Distinct Certificate of Occupancy Product record added
- 2026-07-20Superseded
- Eagar, Arizona — Solar PV Permit (via Building + Electrical Permits) record added
- Eagar, Arizona — EV Charger / EVSE Permit (via Residential Electrical Permit) record added
- 2026-07-06Initial record — coverage of Eagar began