Douglas building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Douglas, Arizona.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
425 E. 10th Street, Douglas, AZ 85607 (City Hall, 2nd Floor)
Phone
520-417-7329
Office hours
Monday - Friday, 8 a.m. - 5 p.m. Building Permit Applications (Residential Building Permit Application, used for all single-family, multifamily, and mobile-home-related projects including electrical/plumbing/mechanical work; and the Commercial Building Permit Application) are submitted in person or by contacting Development Services at permits@douglasaz.gov; current staff contact is William D. Osborne, AICP, City Planner (William.Osborne@douglasaz.gov, 520-417-7314), with a Reception Desk at 520-417-7302 (English or Spanish) and general Permitting line 520-417-7329.

Inspection sequence

Applies to: Certificate of Occupancy / Change of Use (Business License Occupancy Classification Review)

  1. 1

    Public Works Right-of-Way / Cross-Connection Review

    Reviews right-of-way impacts and backflow/cross-connection compliance; published 2 business day completion window

  2. 2

    Fire Department Inspection (if applicable)

    Fire Department inspection of the business location; published 5 business day completion window

  3. 3

    Final Occupancy Classification Determination

    Building classification is determined for the occupancy certificate once all applicable inspections and code/standard approvals are complete

Applies to: Residential Addition / Remodel / Accessory Structure Permit

  1. 1

    Foundation/Footing

    Required before concrete pour for additions and garages

  2. 2

    Framing

    Structural connections to existing structure

  3. 3

    Final

    Completed work verified against approved plans

Applies to: Residential Building Permit (New Construction)

  1. 1

    Foundation/Footing

    Before concrete pour

  2. 2

    Framing

    Structural framing, electrical-mechanical rough-in per approved plans

  3. 3

    Final / Certificate of Occupancy

    All work complete per approved plans; work must be inspected before covering/concealment; Certificate of Occupancy $25 (residential)

Applies to: Electrical Permit

  1. 1

    Rough-In

    Wiring, box placement, and panel connections before walls are closed

  2. 2

    Final

    Devices installed, panel labeled, protections verified per 2005 NEC

Applies to: EV Charger / EVSE Permit (Electrical Permit)

  1. 1

    Rough-In

    Wiring, box placement, and panel connections before walls are closed (if applicable)

  2. 2

    Final

    Charger circuit/unit installed, panel labeled, protections verified per 2005 NEC

Applies to: Fire Sprinkler & Fire Alarm System Permit (Arizona Office of the State Fire Marshal Plan Review)

  1. 1

    Rough-In

    Sprinkler/alarm system components, piping, wiring, and device placement verified before concealment, per the approved OSFM-reviewed plans

  2. 2

    Final Acceptance Test

    Full system functional/acceptance test (flow test for sprinklers, device-by-device test for alarm systems) scheduled via OSFM's online Inspection Request form

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In

    Ductwork and equipment placement before walls closed

  2. 2

    Final

    Equipment operational, clearances and combustion air verified

Applies to: Plumbing Permit

  1. 1

    Rough-In

    After pipes installed, before walls closed

  2. 2

    Final

    Fixtures connected, water heater and gas connections verified, no leaks

Applies to: Residential Solar Photovoltaic (PV) / Wind Turbine Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before energizing

  2. 2

    Final

    Panel mounting, roof penetration sealing, electrical connections, and interconnection point verified

Re-inspection fees

Residential Addition / Remodel / Accessory Structure PermitGarage Re-Inspection (per hour) · City of Douglas Development Services FAQ (Bilingual), DocumentCenter View 5479
$50.00

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Douglas building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Douglas building permits

Get alerts for Douglas

We'll email you when Douglas's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.