Willcox building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Willcox, Arizona.

Verified 2026-07-07 · Source

How to schedule

Inspections are requested through the building department below.

Address
101 S. Railroad Ave, Suite B, Willcox, AZ 85643
Phone
520-384-4271
Office hours
City Hall general contact: (520) 384-4271. The Building Permit Application itself (submitted via the City's online iWorQ portal, willcox.portal.iworq.net) lists the Development Services Department at 101 S. Railroad Ave, Willcox, AZ 85643, phone (520) 766-4211 — the City's Building Permits page directs the public to (520) 384-4271 for general questions and to schedule inspections, while the online application form itself lists the (520) 766-4211 Development Services line; both numbers are cited here since both appear on the City's own current materials. Applications may be submitted online via the iWorQ Building Permit Application portal (willcox.portal.iworq.net/WILLCOX/new-permit/600/5244) or in person at City Hall/Visitor Center, 101 S. Railroad Ave, Suite B.

Inspection sequence

Applies to: Residential Building Permit (New Construction)

  1. 1

    Set Back Inspection

    When the building pad is complete and concrete forms are set, before any plumbing is installed

  2. 2

    Footings / Stem Wall / Underground Plumbing & Electric

    Before concrete is poured: underground plumbing and electrical, rebar for foundations, required hold-downs, footing depth/width, and UFER electrical grounding placement

  3. 3

    Sheathing & Framing

    Framing member spacing and size, ties and clips, headers and lintels, shear wall location and size

  4. 4

    Pre-Drywall

    Rough plumbing, mechanical, and electrical systems; window safety glazing; exterior weatherproof covering in place before stucco; tile roofs must be loaded and truss calculations on site

  5. 5

    Lath

    After lathing is in place but before plaster, stucco, gypsum board finishing, or covering materials are applied

  6. 6

    Drywall Nailing Inspection

    After drywall is up, before any tape is applied

  7. 7

    Driveway Approach/Apron

    Conducted by Public Works, where applicable

  8. 8

    Final

    All work complete: counters, cabinets, plumbing fixtures, electrical outlets/lights, heating registers/return air grills, smoke detectors, doors/windows, gas vents/combustion air grills, HVAC, carpet; flood-hazard-area projects require an Arizona Registered Surveyor/Engineer elevation certificate submitted prior to this inspection

Applies to: Residential Addition / Remodel Permit

  1. 1

    Footings / Stem Wall / Underground Plumbing & Electric

    Required before concrete pour for additions

  2. 2

    Sheathing & Framing

    Structural connections to the existing structure, including upgraded garage separation where applicable

  3. 3

    Pre-Drywall

    Rough plumbing, mechanical, electrical for the addition/remodel scope

  4. 4

    Final

    Completed work verified against approved plans

Applies to: Electrical Permit

  1. 1

    Underground Electric

    Underground electrical and UFER grounding placement before concrete pour, where applicable

  2. 2

    Pre-Drywall (Rough Electrical)

    Rough electrical systems inspected before drywall/covering

  3. 3

    Final

    Electrical outlets, lights, and devices installed and verified per 2017 NEC as amended by the City

Applies to: Plumbing Permit

  1. 1

    Underground Plumbing

    Before concrete pour — pipe slope, materials, minimum 12-inch burial depth, cleanouts

  2. 2

    Pre-Drywall (Rough Plumbing)

    Rough plumbing inspected before walls are closed

  3. 3

    Final

    Fixtures connected, water heater and gas connections verified, no leaks

Applies to: EV Charger Installation Permit

  1. 1

    Rough Electrical

    Charger circuit wiring and disconnect placement verified before covering, where applicable

  2. 2

    Final

    Charger installed and connections verified per 2017 NEC as amended by the City

Applies to: Manufactured Home / Factory-Built Building Installation Permit

  1. 1

    Set Back Inspection

    Verifies placement against approved site plan and zoning setbacks

  2. 2

    Final

    Completed installation verified against approved plans and State installation standards

Applies to: Mechanical / HVAC Permit

  1. 1

    Pre-Drywall (Rough Mechanical)

    Ductwork and equipment placement inspected before drywall/covering

  2. 2

    Final

    Equipment operational, clearances and combustion air verified per 2018 IMC as amended

Applies to: Residential Rooftop Solar Photovoltaic (PV) Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before energizing

  2. 2

    Final

    Panel mounting, racking attachment, roof penetration sealing, electrical connections, and interconnection point verified

Final inspection only: Demolition Permit, Re-Roofing Permit

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Willcox building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Willcox building permits

Get alerts for Willcox

We'll email you when Willcox's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.