Required for plumbing installation, alteration, or repair work in Willcox, governed by the 2018 International Plumbing Code (IPC) as adopted and amended by the City (Exhibit D to Ordinance NS374), including the City's inserted Water Conservation Code appendix.

Verified 2026-07-07 · Source

When you need this permit

  • Plumbing permit required for installation, alteration, or repair of plumbing systems, fixtures, water heaters, and gas piping
  • Governed by the 2018 IPC as adopted by the City, with the Water Conservation Code appendix (fixture flow-rate standards for new commercial/industrial/public construction; PRV and hot-water-on-demand recommendations for new single-family residences)
  • Like-for-like replacement/repair of existing plumbing fixtures (toilet, tub, sink, garbage disposal, water heater, faucets) is permit-exempt under the City's IRC amendment
  • All building sewers and water lines must be buried at least 12 inches below grade City-wide (IPC § 305.4.1 / IRC § P2603.5.1 as amended)
  • New single-family residences on a water-company connection require a pressure-reducing valve (PRV) capped at 60 psi static pressure (wells/well-shares exempt)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Plumbing Fee — Component of a Building Permit (Based on Valuation)City of Willcox Development Services Fee Schedule, Section E.3.b — no separate flat-rate water-heater or fixture-specific fee is published; plumbing work is billed as a percentage add-on to the base Table 1 Construction Fee.
25% of the Construction Fee, minimum $30.00
Sewer Tap Connection FeeCity of Willcox Development Services Fee Schedule, Section E.4.b; applies to new sewer taps in addition to the base Construction/Plumbing Fee.
Calculated per fixture units (Resolution 86-14 connection-fee factor)

Review timeline

Plan reviewWillcox’s published plan-review target
4–20 business days

How long did your Plumbing Permit permit actually take in Willcox?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Underground Plumbing

    Before concrete pour — pipe slope, materials, minimum 12-inch burial depth, cleanouts

  2. 2

    Pre-Drywall (Rough Plumbing)

    Rough plumbing inspected before walls are closed

  3. 3

    Final

    Fixtures connected, water heater and gas connections verified, no leaks

See the full Willcox inspection guide — scheduling & re-inspection fees →

Tips

  • Willcox does not publish a flat per-unit water-heater fee — plumbing work of any kind is billed as a 25%-of-Construction-Fee add-on (minimum $30), the same structure used for mechanical and electrical work.
  • The City's Water Conservation Code makes PRV installation and hot-water-on-demand plumbing 'requested but not required' for new single-family residences — these are strong recommendations, not enforceable code minimums, distinct from the mandatory commercial/industrial/public-construction fixture flow-rate standards in the same appendix.

Frequently asked questions

Like-for-like replacement or repair of an existing water heater (and other fixtures such as toilets, tubs, sinks, garbage disposals, and faucets) is exempt from a permit under the City's IRC amendment. A new water heater installation or a non-like-for-like replacement requires a plumbing permit, billed at 25% of the Construction Fee (minimum $30.00).

In Willcox, the published Plumbing Fee — Component of a Building Permit (Based on Valuation) is: 25% of the Construction Fee, minimum $30.00. Additional published fees: Sewer Tap Connection Fee — Calculated per fixture units (Resolution 86-14 connection-fee factor). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Willcox's published plan-review target for a plumbing permit is 4–20 business days.

You'll need: Building/Plumbing Permit Application (Online, iWorQ Portal). See the required-documents checklist on this page for details on each.

Willcox requires 3 inspection(s) for a plumbing permit, in order: Underground Plumbing, Pre-Drywall (Rough Plumbing), Final. Schedule each through City of Willcox Community Development Department — Building Safety Division / Development Services (520-384-4271).

Apply through City of Willcox Community Development Department — Building Safety Division / Development Services at 101 S. Railroad Ave, Suite B, Willcox, AZ 85643. Phone: 520-384-4271, email: permits@willcox.az.gov. Office hours: City Hall general contact: (520) 384-4271. The Building Permit Application itself (submitted via the City's online iWorQ portal, willcox.portal.iworq.net) lists the Development Services Department at 101 S. Railroad Ave, Willcox, AZ 85643, phone (520) 766-4211 — the City's Building Permits page directs the public to (520) 384-4271 for general questions and to schedule inspections, while the online application form itself lists the (520) 766-4211 Development Services line; both numbers are cited here since both appear on the City's own current materials. Applications may be submitted online via the iWorQ Building Permit Application portal (willcox.portal.iworq.net/WILLCOX/new-permit/600/5244) or in person at City Hall/Visitor Center, 101 S. Railroad Ave, Suite B.. Official information: https://willcox.az.gov/building-permits.

Willcox, Arizona has adopted: Arizona has no statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 9). The City of Willcox is a home-rule city that independently adopts and administers its own construction codes through its Community Development Department / Building Safety Division; it does not defer building permitting to Cochise County. Source: Willcox Municipal Code § 10.01.020 (Building inspector) and § 10.01.040 (Adoption by Reference of International Technical Codes), American Legal Publishing code library (current through Ord. NS374, 2026).; 2018 International Building Code (IBC), as amended in Exhibit A to Ordinance NS374, adopted by reference (Willcox Municipal Code § 10.01.040.A). Per the City's Building Permits page, the newly adopted 2018 ICC code suite and 2017 NEC become effective and required for all applicable permit applications submitted on or after April 1, 2026; permit applications submitted before that date remain on the City's prior code cycle. Source: Willcox Municipal Code § 10.01.040; City of Willcox Building Permits page (willcox.az.gov/building-permits); '2018 Building Codes Adoption with Amendments' (Exhibits A-J to Ord. NS374).; 2018 International Residential Code (IRC), as amended in Exhibit B to Ordinance NS374, adopted by reference (§ 10.01.040.B), effective for applications submitted on/after April 1, 2026.; 2018 International Mechanical Code (IMC), as amended in Exhibit C to Ordinance NS374, adopted by reference (§ 10.01.040.C).; 2018 International Plumbing Code (IPC), as amended in Exhibit D to Ordinance NS374, adopted by reference (§ 10.01.040.D), including a locally-inserted Water Conservation Code appendix (see localAmendments).; 2017 National Electrical Code (NEC), as amended in Exhibit E to Ordinance NS374, adopted by reference (§ 10.01.040.E), published by the National Fire Protection Association — one edition behind the 2018 ICC cycle, consistent with standard NFPA/ICC release-cycle offset.; 2018 International Fuel Gas Code (IFGC), as amended in Exhibit F to Ordinance NS374, adopted by reference (§ 10.01.040.F).; 2018 International Fire Code (IFC), as amended in Exhibit G to Ordinance NS374, adopted by reference (§ 10.01.040.G) as the City's uniform fire code, administered by the Building Safety Division under the Community Development Department (fire-code-official references are replaced by 'Building Official' per the City's amendment).; 2018 International Swimming Pool and Spa Code (ISPSC), as amended in Exhibit H to Ordinance NS374, adopted by reference (§ 10.01.040.H); most public/semipublic pool provisions are deleted and replaced with a reference to Arizona Administrative Code Title 18, Chapter 5, Article 2 and A.R.S. § 36-1681.; 2018 International Existing Building Code (IEBC), as amended in Exhibit I to Ordinance NS374, adopted by reference (§ 10.01.040.I).; 1997 Uniform Code for the Abatement of Dangerous Buildings (UCADB), as amended (no amendments) in Exhibit J to Ordinance NS374, adopted by reference (§ 10.01.040.J), published by the International Conference of Building Officials (ICBO).; Uniform Standard Details and Specifications for Public Works Construction, developed by the Maricopa Association of Governments (MAG) and adopted by reference as the City's own public-works construction standard, with 'City of Willcox' substituted for 'Maricopa Association of Governments'/'Maricopa County' throughout (Willcox Municipal Code § 10.01.060; Ord. NS289 § 2, 2008; made public record by Resolution No. 2008-74).; Manufactured homes, mobile homes, and factory-built buildings: construction/installation standards are regulated directly by the State of Arizona (Department of Fire, Building and Life Safety / Office of Manufactured Housing, A.R.S. § 41-4001 et seq.); the City separately charges a $400.00 Manufactured Homes fee and $90.00 Factory Built Buildings fee under its own Development Services Fee Schedule (Table, Other Fees), confirming the City issues its own local placement permit layered on the state process. Source: City of Willcox Development Services Fee Schedule (Resolution No. 2006-10 / 2008-75), Section F.; Whether a Registered Design Professional (architect/engineer per A.R.S. Title 32) is required to prepare and stamp plans is governed entirely by state law, not city ordinance — the City has published a dedicated 'Requirement for Architect or Engineer' guidance document explaining the A.R.S. § 32-144 factors (building size ≤3,000 sq ft, occupant load <21, structural spans ≤20 ft) and giving worked examples; residential (detached single-family) construction is exempt from the RDP requirement under A.R.S. § 32-144(A)(3). Source: City of Willcox 'When is a Registered (Licensed) Architect or Engineer Required for a Building Project' (Community Development Department / Building Safety Division).. Local amendments apply — see the Willcox overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Willcox building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.