Plumbing Permit in Bullhead City, Arizona

Required for plumbing installation, alteration, or repair work in Bullhead City, governed by the 2018 International Plumbing Code (IPC) as adopted by the City. Billed on a flat permit-issuance fee plus an itemized unit-fee schedule.

Verified 2026-07-06 · Source

When you need this permit

  • Plumbing permit required for installation, alteration, or repair of plumbing fixtures, water heaters, and gas piping systems
  • Governed by the 2018 IPC as adopted by the City (BHCMC Chapter 15.32)
  • Stopping leaks that do not require replacing concealed pipe, and clearing stoppages/leaks not requiring valve/pipe/fixture replacement (including water closet removal/reinstallation), are exempt from a permit
  • Apply via Permit Application submitted in person or by mail to the Building Division at City Hall

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Plumbing Permit Issuance, each permitCity of Bullhead City Comprehensive Fee Schedule FY2025-2026, Section A3.40.021.07
$26.48
Plumbing Permit Issuance, each supplemental permitCity of Bullhead City Comprehensive Fee Schedule FY2025-2026, Section A3.40.021.07
$8.18
Plumbing fixture/trap/set of fixtures on one trapCity of Bullhead City Comprehensive Fee Schedule FY2025-2026, Section A3.40.021.07, Unit Fee Schedule
$11.05 each
Water heater / ventCity of Bullhead City Comprehensive Fee Schedule FY2025-2026, Section A3.40.021.07
$13.86 each
Building sewer / trailer park sewerCity of Bullhead City Comprehensive Fee Schedule FY2025-2026, Section A3.40.021.07
$27.79 each
Gas piping system, one to four outlets / five or more outletsCity of Bullhead City Comprehensive Fee Schedule FY2025-2026, Section A3.40.021.07
$6.94 each (1-4 outlets); $1.24 per outlet (5+)
Sewer Tap FeeCity of Bullhead City Comprehensive Fee Schedule FY2025-2026, Section A3.40.051.02
$150.00 per tap-in

Review timeline

Plan reviewBullhead City’s published plan-review target
45–60 business days

How long did your Plumbing Permit permit actually take in Bullhead City?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Underground/Slab

    Before concrete pour — verify pipe slope, materials, cleanouts

  2. 2

    Rough-In

    After pipes installed, before walls closed

  3. 3

    Final

    Fixtures connected, water heater and gas connections verified, no leaks

See the full Bullhead City inspection guide — scheduling & re-inspection fees →

Tips

  • Bullhead City's plumbing fee model is unit-based (per fixture/trap/water heater/gas outlet from the Unit Fee Schedule) plus a flat $26.48 issuance fee, not a percentage-of-valuation model.
  • A separate one-time Sewer Tap Fee ($150) and Residential Sewer Capacity Charge ($4,304 per dwelling unit) apply through the Utilities Department in addition to the Building Division's plumbing permit fee.
  • Simple leak-stoppage and stoppage-clearing work that doesn't require replacing pipe/valves/fixtures is exempt from a permit.

Frequently asked questions

Bullhead City requires a plumbing permit for: Plumbing permit required for installation, alteration, or repair of plumbing fixtures, water heaters, and gas piping systems; Governed by the 2018 IPC as adopted by the City (BHCMC Chapter 15.32); Stopping leaks that do not require replacing concealed pipe, and clearing stoppages/leaks not requiring valve/pipe/fixture replacement (including water closet removal/reinstallation), are exempt from a permit; Apply via Permit Application submitted in person or by mail to the Building Division at City Hall. If your project isn't listed, confirm with City of Bullhead City Development Services Department — Building Division at 928-763-0124 before starting work.

$13.86 per unit (Unit Fee Schedule) plus the $26.48 flat plumbing permit issuance fee. Source: City of Bullhead City Comprehensive Fee Schedule FY2025-2026, Section A3.40.021.07.

Bullhead City's published plan-review target for a plumbing permit is 45–60 business days.

You'll need: Permit Application (rev. 09/2022). Depending on your project, Bullhead City may also ask for: Drainage Fixture Unit (REU) Calculation Manual. See the required-documents checklist on this page for details on each.

Bullhead City requires 3 inspection(s) for a plumbing permit, in order: Underground/Slab, Rough-In, Final. Schedule each through City of Bullhead City Development Services Department — Building Division (928-763-0124).

Apply through City of Bullhead City Development Services Department — Building Division at 2355 Trane Road, Bullhead City, AZ 86442. Phone: 928-763-0124, email: schooniyom@bullheadcityaz.gov. Office hours: City Hall, 2355 Trane Road, Bullhead City, AZ 86442. Building Division main line 928-763-0124 (fax 928-763-0131); Inspection Requests line 928-763-0172. Development Services Director/Building Official: Saritti "Billy" Chooniyom, CBO (schooniyom@bullheadcityaz.gov). Sr. Plan Review/Administrative Manager: Wendy Lewis (wlewis@bullheadcityaz.gov). Manufactured-home permitting contact: dking@bullheadcityaz.gov. Permit Application Packets are submitted in person or by mail to the Building Division/Planning & Zoning Division at City Hall. Source: City of Bullhead City Building and Renovating page and 2025 AZBO Directory.. Official information: https://www.bullheadcityaz.gov/business-development/building-and-renovating/.

Bullhead City, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 9, §§ 9-831 through 9-840). The City of Bullhead City runs its own Development Services Department / Building Division and independently adopts and administers its own construction codes; it does not defer permitting to Mohave County. Source: City of Bullhead City 'Adopted Building Codes' notice (effective 07/01/2026) and 'Work Exempt From Permits' handout (effective 07/01/2024).; 2018 International Building Code (IBC), as published by the International Code Council, adopted with local amendments (Bullhead City Municipal Code (BHCMC) Chapter 15.12). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; 2018 International Residential Code (IRC), for one- and two-family dwellings and associated accessory structures, adopted with local amendments (BHCMC Chapter 15.14). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026; City of Bullhead City 2018 IRC Design Criteria sheet, effective 07/01/2024.; 2017 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted with local amendments (BHCMC Chapter 15.20) — one edition behind the 2018 ICC code set. Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026. The City Council approved adoption of the 2018-cycle ICC codes and 2017 NEC on 04/16/2024, effective for applications beginning 07/01/2024. Source: Mohave Daily News, 'Bullhead City moves toward updating building codes.'; 2018 International Mechanical Code (IMC), adopted with local amendments (BHCMC Chapter 15.28). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; 2018 International Plumbing Code (IPC), adopted with local amendments (BHCMC Chapter 15.32). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; 2018 International Fuel Gas Code (IFGC), adopted with local amendments (BHCMC Chapter 15.34). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; 2018 International Energy Conservation Code (IECC), adopted with local amendments (BHCMC Chapter 15.22). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; 2018 International Existing Building Code (IEBC), adopted with local amendments (BHCMC Chapter 15.26). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; 2018 International Swimming Pool and Spa Code (ISPSC), adopted with local amendments (BHCMC Chapter 15.30). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; 2018 International Fire Code (IFC) is referenced by the City for demolition/fire-safety provisions, but fire code administration in Bullhead City is handled by the Arizona Department of Fire, Building and Life Safety, which has separately adopted the 2024 International Fire Code; contact the Bullhead City Fire Department at (928) 758-3971 / planreview@bullheadfire.org for fire plan review. Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; 2010 ADA Standards for Accessible Design (ADAAG Manual, US Access Board) adopted, no local BHCMC chapter assignment (NA). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; Manufactured homes, factory-built buildings, and park model trailers are separately regulated through the City's intergovernmental agreement with the Arizona Department of Housing (ADOH) for installation, reinspection, additional inspections and extensions (fees per the ADOH Fee Schedule, A.R.S. Title 41, Chapter 37, Article 3); the City separately issues Zoning Clearance permits for placement/siting. Source: City of Bullhead City Comprehensive Fee Schedule FY2025-2026, Section A3.40.022.07.. Local amendments apply — see the Bullhead City overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bullhead City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.