Bullhead City building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Bullhead City, Arizona.

Verified 2026-08-21 · Source

How to schedule

Inspections are requested through the building department below.

Address
2355 Trane Road, Bullhead City, AZ 86442
Phone
928-763-0124
Office hours
City Hall, 2355 Trane Road, Bullhead City, AZ 86442. Building Division main line 928-763-0124 (fax 928-763-0131); Inspection Requests line 928-763-0172. Development Services Director/Building Official: Saritti "Billy" Chooniyom, CBO (schooniyom@bullheadcityaz.gov). Sr. Plan Review/Administrative Manager: Wendy Lewis (wlewis@bullheadcityaz.gov). Manufactured-home permitting contact: dking@bullheadcityaz.gov. Permit Application Packets are submitted in person or by mail to the Building Division/Planning & Zoning Division at City Hall. Source: City of Bullhead City Building and Renovating page and 2025 AZBO Directory.

Inspection sequence

Applies to: Commercial Building Permit (New Construction and Tenant Improvement)

  1. 1

    Foundation/Footing

    Before concrete pour

  2. 2

    Framing

    Structural framing, connections, and shear-transfer details per approved structural plans

  3. 3

    Rough Electrical/Plumbing/Mechanical

    Wiring, piping, and ductwork before wall closure

  4. 4

    Planning / Engineering / Fire Final Sign-Offs

    Required departmental approvals (parking/landscaping/screening compliance, drainage, fire-protection systems) feeding into the Building Division's final sign-off

  5. 5

    Final / Certificate of Occupancy

    All work complete per approved plans; ADA accessibility features, utility connections, and life-safety systems verified before occupancy

Applies to: Residential Building Permit (New Construction — Single Family Dwelling)

  1. 1

    Foundation/Footing

    Before concrete pour

  2. 2

    Framing

    Structural framing, connections, egress, per 2018 IRC and City Design Criteria

  3. 3

    Rough Electrical/Plumbing/Mechanical

    Wiring, piping, and ductwork before wall closure

  4. 4

    Final

    All work complete per approved plans; utility connections, life-safety systems, and final grading verified

Applies to: Fire Sprinkler and Fire Alarm System Permit

  1. 1

    Rough-In / Underground

    Sprinkler piping, alarm wiring/conduit, and underground fire main verified before concealment or backfill

  2. 2

    Hydrostatic Test / Flush

    Sprinkler and underground piping systems tested and flushed per the Fire District's inspection requirements

  3. 3

    Final

    System fully operational, notification/initiating devices verified, and Fire Department sign-off obtained — a prerequisite to the City's Certificate of Occupancy for the space

Applies to: Plumbing Permit

  1. 1

    Underground/Slab

    Before concrete pour — verify pipe slope, materials, cleanouts

  2. 2

    Rough-In

    After pipes installed, before walls closed

  3. 3

    Final

    Fixtures connected, water heater and gas connections verified, no leaks

Applies to: Residential Room Addition / Garage / Remodel Permit

  1. 1

    Foundation/Footing

    Required before concrete pour for additions

  2. 2

    Framing

    Structural connections to existing structure

  3. 3

    Final

    Completed work verified against approved plans

Applies to: Swimming Pool and Spa Permit

  1. 1

    Pre-Gunite/Excavation

    Steel and plumbing rough-in verified before gunite/shotcrete placement

  2. 2

    Pool Barrier

    Verifies compliance with the City's Pool Barrier Checklist Agreement and ISPSC barrier requirements before the pool holds water accessible to the public/occupants

  3. 3

    Final

    Equipment, deck, and barrier fully complete and verified

Applies to: Certificate of Occupancy / Change of Occupancy or Tenant

  1. 1

    Planning / Engineering / Fire Final Sign-Offs

    Required departmental approvals feeding into the Building Division's final sign-off before a Certificate of Occupancy is issued

  2. 2

    Building Division Final Inspection

    Final inspection confirming the completed work matches approved plans; last sign-off before Certificate of Occupancy issuance

Applies to: Electrical Permit

  1. 1

    Rough-In

    Wiring, box placement, and panel connections before walls are closed

  2. 2

    Final

    Devices installed, panel labeled, protections verified per 2017 NEC

Applies to: Fence and Retaining Wall Permit

  1. 1

    Footing

    Required for engineered/permitted retaining walls before backfill

  2. 2

    Final

    Completed fence/wall verified against approved plans

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In

    Ductwork and equipment placement before walls closed

  2. 2

    Final

    Equipment operational, clearances and combustion air verified

Applies to: Re-Roofing Permit

  1. 1

    Roof Inspection

    Verifies sheathing, flashing, underlayment, and proposed roofing material/weight before final cover

  2. 2

    Final

    Completed roof verified against approved plans

Applies to: Residential Solar Photovoltaic (PV) and Wind-Driven Systems Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before energizing

  2. 2

    Final

    Panel mounting, racking attachment, roof penetration sealing, electrical connections, and interconnection point verified

Applies to: Sign Permit (Commercial/Business Signage)

  1. 1

    Final

    Verifies installed sign height, area, materials, and placement against the approved Sign Handout submittal and site plan; no separately published sign-specific inspection checklist was found beyond this general final verification

  2. 2

    Electrical Rough-In/Final (if illuminated)

    Wiring and connections for the sign's electrical hookup, under the associated Electrical Permit

Re-inspection fees

Fire Sprinkler and Fire Alarm System Permit
Reinspection (failure to have approved plans onsite, failure to install per approved plan, failure to pretest, inspection no-show, or not otherwise specified) · Bullhead City Fire District Fee… Show full citationReinspection (failure to have approved plans onsite, failure to install per approved plan, failure to pretest, inspection no-show, or not otherwise specified) · Bullhead City Fire District Fee Schedule, rates updated 1/1/2025; fees must be paid before scheduling a 2nd or subsequent inspection
$250.00 per incident
Certificate of Occupancy / Change of Occupancy or TenantRe-inspection cost · City of Bullhead City Comprehensive Fee Schedule FY2026-2027, Section A3.40.022.09; applies if a Building/Fire compliance re-inspection of the tenant space is required
$50.00

Sources & verification

Verified against official sources. Last reviewed 2026-08-21.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bullhead City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Bullhead City building permits

Get alerts for Bullhead City

We'll email you when Bullhead City's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.