Skip to main content
PermitBase

Demolition Permit in Bullhead City, Arizona

Required for demolition of any residential or commercial structure in Bullhead City. Requires prior asbestos NESHAP clearance from the Arizona Department of Environmental Quality and compliance with 2018 IBC Section 3303 demolition provisions.

Verified 2026-07-06 · Source

When you need this permit

  • Building permit required before demolishing a residential or commercial structure within Bullhead City limits
  • Commercial demolition must follow Arizona Asbestos NESHAP Regulations for Demolition and Renovations — contact ADEQ Air Quality Compliance Section, Asbestos NESHAP Program (1110 W. Washington St., Phoenix, AZ 85007, 602-771-2333)
  • Must comply with 2018 IBC Section 3303 (Demolition): pedestrian protection per Section 3306 where work is adjacent to a public way; vacant lots filled and maintained to existing grade; provisions to prevent water accumulation/foundation damage; utility connections discontinued and capped per code; fire safety per IFC Chapter 33
  • Permit Application Packet submitted in person or by mail to the Building Division at City Hall

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Valuation Fee (demolition valuation)City of Bullhead City Comprehensive Fee Schedule FY2025-2026, Sections A3.40.021.01/.02; no separately itemized flat demolition fee line was found — demolition is billed by valuation like other Building Division permits under this schedule
Per the graduated Valuation Fee table (Section A3.40.021.02), applied to the Building Official's determined demolition project valuation
Abatement Fee (if City abatement action is separately triggered)City of Bullhead City Comprehensive Fee Schedule FY2025-2026, Section A3.40.021.11 (distinct from a standard voluntary demolition permit; applies to City-initiated abatement actions)
$103.00

Review timeline

Plan reviewBullhead City’s published plan-review target
45–60 business days

How long did your Demolition Permit permit actually take in Bullhead City?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Verifies utility termination, site grading to existing grade, and compliance with 2018 IBC Section 3303 before the demolition is considered complete

See the full Bullhead City inspection guide — scheduling & re-inspection fees →

Tips

  • Asbestos/NESHAP clearance from ADEQ's Air Quality Compliance Section (602-771-2333) is a prerequisite the applicant must independently satisfy — it is not processed by the City's Building Division.
  • Vacant lots must be filled and maintained to existing grade after demolition per 2018 IBC Section 3303 — this is an explicit, separately-listed City requirement beyond the base ICC provision.
  • The FY2025-2026 Comprehensive Fee Schedule does not publish a separate flat demolition fee (unlike some AZ cities) — demolition permits are billed under the same valuation-based Building Permit Fee table as other construction work.

Frequently asked questions

For commercial demolition, you must follow Arizona Asbestos NESHAP regulations by contacting ADEQ's Air Quality Compliance Section (602-771-2333) before proceeding, and comply with 2018 IBC Section 3303 requirements covering pedestrian protection, vacant-lot grading, water-accumulation prevention, utility disconnection/capping, and fire safety per IFC Chapter 33.

In Bullhead City, the published Building Permit Valuation Fee (demolition valuation) is: Per the graduated Valuation Fee table (Section A3.40.021.02), applied to the Building Official's determined demolition project valuation. Additional published fees: Abatement Fee (if City abatement action is separately triggered) — $103.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Bullhead City's published plan-review target for a demolition permit is 45–60 business days.

You'll need: Permit Application (rev. 09/2022); Commercial Demolition Handout. See the required-documents checklist on this page for details on each.

Bullhead City requires 1 inspection(s) for a demolition permit, in order: Final. Schedule each through City of Bullhead City Development Services Department — Building Division (928-763-0124).

Apply through City of Bullhead City Development Services Department — Building Division at 2355 Trane Road, Bullhead City, AZ 86442. Phone: 928-763-0124, email: schooniyom@bullheadcityaz.gov. Office hours: City Hall, 2355 Trane Road, Bullhead City, AZ 86442. Building Division main line 928-763-0124 (fax 928-763-0131); Inspection Requests line 928-763-0172. Development Services Director/Building Official: Saritti "Billy" Chooniyom, CBO (schooniyom@bullheadcityaz.gov). Sr. Plan Review/Administrative Manager: Wendy Lewis (wlewis@bullheadcityaz.gov). Manufactured-home permitting contact: dking@bullheadcityaz.gov. Permit Application Packets are submitted in person or by mail to the Building Division/Planning & Zoning Division at City Hall. Source: City of Bullhead City Building and Renovating page and 2025 AZBO Directory.. Official information: https://www.bullheadcityaz.gov/business-development/building-and-renovating/.

Bullhead City, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 9, §§ 9-831 through 9-840). The City of Bullhead City runs its own Development Services Department / Building Division and independently adopts and administers its own construction codes; it does not defer permitting to Mohave County. Source: City of Bullhead City 'Adopted Building Codes' notice (effective 07/01/2026) and 'Work Exempt From Permits' handout (effective 07/01/2024).; 2018 International Building Code (IBC), as published by the International Code Council, adopted with local amendments (Bullhead City Municipal Code (BHCMC) Chapter 15.12). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; 2018 International Residential Code (IRC), for one- and two-family dwellings and associated accessory structures, adopted with local amendments (BHCMC Chapter 15.14). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026; City of Bullhead City 2018 IRC Design Criteria sheet, effective 07/01/2024.; 2017 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted with local amendments (BHCMC Chapter 15.20) — one edition behind the 2018 ICC code set. Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026. The City Council approved adoption of the 2018-cycle ICC codes and 2017 NEC on 04/16/2024, effective for applications beginning 07/01/2024. Source: Mohave Daily News, 'Bullhead City moves toward updating building codes.'; 2018 International Mechanical Code (IMC), adopted with local amendments (BHCMC Chapter 15.28). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; 2018 International Plumbing Code (IPC), adopted with local amendments (BHCMC Chapter 15.32). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; 2018 International Fuel Gas Code (IFGC), adopted with local amendments (BHCMC Chapter 15.34). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; 2018 International Energy Conservation Code (IECC), adopted with local amendments (BHCMC Chapter 15.22). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; 2018 International Existing Building Code (IEBC), adopted with local amendments (BHCMC Chapter 15.26). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; 2018 International Swimming Pool and Spa Code (ISPSC), adopted with local amendments (BHCMC Chapter 15.30). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; 2018 International Fire Code (IFC) is referenced by the City for demolition/fire-safety provisions, but fire code administration in Bullhead City is handled by the Arizona Department of Fire, Building and Life Safety, which has separately adopted the 2024 International Fire Code; contact the Bullhead City Fire Department at (928) 758-3971 / planreview@bullheadfire.org for fire plan review. Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; 2010 ADA Standards for Accessible Design (ADAAG Manual, US Access Board) adopted, no local BHCMC chapter assignment (NA). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.; Manufactured homes, factory-built buildings, and park model trailers are separately regulated through the City's intergovernmental agreement with the Arizona Department of Housing (ADOH) for installation, reinspection, additional inspections and extensions (fees per the ADOH Fee Schedule, A.R.S. Title 41, Chapter 37, Article 3); the City separately issues Zoning Clearance permits for placement/siting. Source: City of Bullhead City Comprehensive Fee Schedule FY2025-2026, Section A3.40.022.07.. Local amendments apply — see the Bullhead City overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bullhead City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.