Certificate of Occupancy / Change of Occupancy or Tenant — Bullhead City, Arizona · Requirements sheet
Reviewed 2026-07-23 · Source: https://www.bullheadcityaz.gov/business-development/building-and-renovating/building-permit-forms-and-information/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Certificate of Occupancy / Change of Occupancy or Tenant in Bullhead City, Arizona
Bullhead City does not publish a stand-alone 'Change of Use Permit' product or a separately itemized Certificate of Occupancy fee. A change of occupancy classification, tenant, or business use — and the Certificate of Occupancy required before a new or altered building or tenant space may be occupied — are instead handled through two existing City processes depending on whether construction work is involved: the standard Building Division commercial permit (when alteration/construction accompanies the change), or the Planning & Zoning Division's Business License 'change of location' process (when no construction is proposed).
Reviewed 2026-07-23 · Source
When you need this permit
- A Certificate of Occupancy (or equivalent Building Division final sign-off) is required before a new or renovated commercial/multifamily building or tenant space may be occupied, per the City's Commercial and Multifamily Handout
- A soil-treatment report from an Arizona-licensed pest control agency, for prevention of termite infestation, is a named prerequisite to issuance of a Certificate of Occupancy on commercial/multifamily projects
- Bullhead City's FY2025-2026 Comprehensive Fee Schedule has no separately itemized 'Change of Use Permit' or 'Certificate of Occupancy' fee line item; a change of occupancy classification or tenant that involves construction/alteration work is processed as a standard Building Division commercial permit, billed under the same graduated Valuation Fee table (Section A3.40.021.02) as other building permits, using the Building Official's determined valuation for the applicable occupancy classification and construction type (per the Fee Schedule's own catch-all: 'The Building Official, in accordance with building industry standards, may determine valuations of buildings or structures or other projects not specifically listed')
- A change of tenant, business name, or business location with no construction work is instead processed through the Planning & Zoning Division's Business License application; a 'Change of location' fee applies for businesses relocating within Bullhead City limits, plus a re-inspection cost if a Building/Fire compliance re-inspection of the space is required
- Applications are submitted in person or by mail to the Building Division / Planning & Zoning Division at City Hall, 2355 Trane Road
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Planning / Engineering / Fire Final Sign-Offs
Required departmental approvals feeding into the Building Division's final sign-off before a Certificate of Occupancy is issued
- 2
Building Division Final Inspection
Final inspection confirming the completed work matches approved plans; last sign-off before Certificate of Occupancy issuance
See the full Bullhead City inspection guide — scheduling & re-inspection fees →
Tips
- Bullhead City has no distinct 'Certificate of Occupancy' fee line item in its FY2025-2026 Comprehensive Fee Schedule, unlike some neighboring Arizona cities — CO issuance is bundled into the standard Building Division commercial permit process and its graduated Valuation Fee table rather than charged as a separate flat fee. This gap is noted rather than papered over with an invented figure.
- For a pure change of tenant, business, or location with no construction work, the applicable City process is the Planning & Zoning Business License 'Change of location' fee ($20) plus a $50 re-inspection cost if triggered — not a standalone 'change of use permit.'
- A soil-treatment (termite) report from an Arizona-licensed pest control agency is a specific, named prerequisite for Certificate of Occupancy issuance on commercial/multifamily projects, per the City's own Commercial and Multifamily Handout.
- This entry synthesizes the City's Commercial and Multifamily Handout, Comprehensive Fee Schedule, and Business License fee sections — no single dedicated 'Certificate of Occupancy' or 'Change of Use' handout is published by the City, so confidence is marked partial pending direct confirmation from the Building Division of any change-of-occupancy-specific review steps beyond what these documents describe.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bullhead City building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Bullhead City
Certificate of Occupancy / Change of Occupancy or Tenant in other cities
Compare certificate of occupancy / change of occupancy or tenant fees across Arizona →
Look up this fee in a different city →
Now live
Build your Bullhead City project checklist
Describe your project once and get every permit, document, and fee it triggers in Bullhead City — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →