Skip to main content
PermitBase

Bullhead City building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Bullhead City, Arizona.

Last verified 2026-07-06 · Source · Embed this page’s badge · Version history

Building department

Address
2355 Trane Road, Bullhead City, AZ 86442
Phone
928-763-0124
Office hours
City Hall, 2355 Trane Road, Bullhead City, AZ 86442. Building Division main line 928-763-0124 (fax 928-763-0131); Inspection Requests line 928-763-0172. Development Services Director/Building Official: Saritti "Billy" Chooniyom, CBO (schooniyom@bullheadcityaz.gov). Sr. Plan Review/Administrative Manager: Wendy Lewis (wlewis@bullheadcityaz.gov). Manufactured-home permitting contact: dking@bullheadcityaz.gov. Permit Application Packets are submitted in person or by mail to the Building Division/Planning & Zoning Division at City Hall. Source: City of Bullhead City Building and Renovating page and 2025 AZBO Directory.

Inspection guide

See how inspections work in Bullhead City — sequence, scheduling & re-inspection fees.

Codes adopted

Arizona has no statewide building code for non-state buildings; codes are adopted locally. According to the International Code Council, codes are adopted locally in Arizona and are predominantly the I-codes, with different cities and counties choosing their own editions and local amendments. The Arizona State Fire Code (adopting the 2018 IFC) applies only to state and county buildings, public and private schools, and non-residential occupancies in areas without a locally adopted fire code — it does not establish a statewide residential or commercial building code floor. Each city and county adopts its own code editions independently, resulting in different I-Code years and amendment sets across jurisdictions. There is no state-mandated minimum edition; enforcement is entirely local. Always confirm the adopted edition and any local amendments with the specific jurisdiction before submitting plans.

  • Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (A.R.S. Title 9, §§ 9-831 through 9-840). The City of Bullhead City runs its own Development Services Department / Building Division and independently adopts and administers its own construction codes; it does not defer permitting to Mohave County. Source: City of Bullhead City 'Adopted Building Codes' notice (effective 07/01/2026) and 'Work Exempt From Permits' handout (effective 07/01/2024).
  • 2018 International Building Code (IBC), as published by the International Code Council, adopted with local amendments (Bullhead City Municipal Code (BHCMC) Chapter 15.12). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.
  • 2018 International Residential Code (IRC), for one- and two-family dwellings and associated accessory structures, adopted with local amendments (BHCMC Chapter 15.14). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026; City of Bullhead City 2018 IRC Design Criteria sheet, effective 07/01/2024.
  • 2017 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted with local amendments (BHCMC Chapter 15.20) — one edition behind the 2018 ICC code set. Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026. The City Council approved adoption of the 2018-cycle ICC codes and 2017 NEC on 04/16/2024, effective for applications beginning 07/01/2024. Source: Mohave Daily News, 'Bullhead City moves toward updating building codes.'
  • 2018 International Mechanical Code (IMC), adopted with local amendments (BHCMC Chapter 15.28). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.
  • 2018 International Plumbing Code (IPC), adopted with local amendments (BHCMC Chapter 15.32). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.
  • 2018 International Fuel Gas Code (IFGC), adopted with local amendments (BHCMC Chapter 15.34). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.
  • 2018 International Energy Conservation Code (IECC), adopted with local amendments (BHCMC Chapter 15.22). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.
  • 2018 International Existing Building Code (IEBC), adopted with local amendments (BHCMC Chapter 15.26). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.
  • 2018 International Swimming Pool and Spa Code (ISPSC), adopted with local amendments (BHCMC Chapter 15.30). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.
  • 2018 International Fire Code (IFC) is referenced by the City for demolition/fire-safety provisions, but fire code administration in Bullhead City is handled by the Arizona Department of Fire, Building and Life Safety, which has separately adopted the 2024 International Fire Code; contact the Bullhead City Fire Department at (928) 758-3971 / planreview@bullheadfire.org for fire plan review. Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.
  • 2010 ADA Standards for Accessible Design (ADAAG Manual, US Access Board) adopted, no local BHCMC chapter assignment (NA). Source: City of Bullhead City Adopted Building Codes notice, effective 07/01/2026.
  • Manufactured homes, factory-built buildings, and park model trailers are separately regulated through the City's intergovernmental agreement with the Arizona Department of Housing (ADOH) for installation, reinspection, additional inspections and extensions (fees per the ADOH Fee Schedule, A.R.S. Title 41, Chapter 37, Article 3); the City separately issues Zoning Clearance permits for placement/siting. Source: City of Bullhead City Comprehensive Fee Schedule FY2025-2026, Section A3.40.022.07.

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
31units

27 buildings · $5.6M valuation

Trailing 12 months
330units

12 of 12 months reported · #30 in Arizona coverage by units

Year to date (2026 YTD through 2026-05)
159units

155 buildings · $32.3M valuation

5 month(s) reported to Census

Full year 2025
273units

268 buildings · $57M valuation

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Arizona building activity

Tips & gotchas

  • Arizona has no statewide mandatory building code — Bullhead City independently adopts and amends its own construction codes and runs its own Development Services/Building Division program; it does not defer to Mohave County for permitting within city limits.
  • Bullhead City runs a full 2018-cycle ICC code suite (IBC, IRC, IMC, IPC, IFGC, IEBC, IECC, ISPSC) — one cycle behind the 2024 codes some other Arizona cities have adopted — plus the 2017 NEC (also one cycle behind), all effective for applications beginning 07/01/2024 per City Council approval on 04/16/2024.
  • Fee model is fundamentally different from valuation-percentage cities like Buckeye: electrical/plumbing/mechanical permits use a flat issuance fee ($26.48, $8.18 supplemental) plus itemized per-unit/device/fixture charges from a published Unit/System Fee Schedule, while building/roofing/demolition/pool permits use the City's own graduated Valuation Fee table (Section A3.40.021.02) fed by Building Valuation Rates (per sq ft by occupancy/construction type) and Miscellaneous Valuation Rates (e.g., $40.73/sq ft residential additions, $32.72/sq ft pools, $17.46/sq ft retaining walls).
  • The City's A.R.S. § 9-835 mandated review timeframe (revised March 2026) is 60 working days combined: 15 working days Administrative Completeness Review + 45 working days Substantive Review, with the clock suspended during any correction-response period. This is notably longer than some AZ cities' review windows.
  • Per A.R.S. § 9-470.01(A)(1)&(2), if the City can't complete review/response within 15 business days, an applicant may (under specific conditions) engage a City-approved third-party plan reviewer at their own cost — this statutory relief valve is explicitly documented in the City's own timeline guide.
  • Climatic/geographic design criteria (2018 IRC): 115 mph ultimate/90 mph basic design wind speed (Exposure C), Seismic Design Category B, 39°F winter design temperature, moderate-to-heavy termite potential, 0 ground snow load, IECC Climate Zone 3B Hot-Dry.
  • Narrow no-permit exemptions exist for: detached accessory structures ≤120 sq ft (6 ft clearance, no utilities); fences ≤6 ft outside setbacks; retaining walls ≤4 ft outside setbacks with no surcharge; prefab pools <18 in deep and <8 ft wide; decks ≤30 in above grade with no roof; and various minor repair/portable-appliance categories across electrical/gas/mechanical/plumbing trades.
  • No dedicated flat fee for re-roofing, general demolition, or residential solar PV was found in the FY2025-2026 Comprehensive Fee Schedule — these are billed through the same general valuation-based Building Permit Fee table (roofing/demolition) or the standard Electrical Permit unit-fee schedule (PV), respectively, rather than a jurisdiction-specific flat dollar figure.
  • Bullhead City is the first Mohave County jurisdiction added to PermitBase.
  • The 2025 AZBO Directory-listed adopted codes (2018 I-Codes, 2017 NEC) were independently verified as still current via the City's own 'Adopted Building Codes' notice (effective 07/01/2026) and 'Work Exempt From Permits' handout (effective 07/01/2024) — the directory entry was accurate and did not need correction.
  • Manufactured homes/factory-built buildings/park trailers are handled through a City Zoning Clearance ($100-$245 depending on accessory structures) plus a separate ADOH intergovernmental-agreement installation fee set annually by the Arizona Department of Housing (A.R.S. Title 41, Chapter 37, Article 3) rather than by the City's own fee schedule.

Comparable nearby cities

Colorado City
Both in Mohave County11 shared permit types
Compare fees →
Lake Havasu City
Both in Mohave County10 shared permit types~46 mi away
Compare fees →
Unincorporated Mohave County
Both in Mohave County7 shared permit types
Compare fees →