Unincorporated Mohave County building permits
VerifiedDepartment contacts, adopted codes, permit types, fees, and gotchas for Unincorporated Mohave County, Arizona.
Last verified 2026-07-23 · Source · Embed this page’s badge · Version history
Building department
- Address
- 3250 E. Kino Avenue, Kingman, AZ 86409 (mailing: PO Box 7000, Kingman, AZ 86402-7000)
- Phone
- 928-757-0903
- Office hours
- Mon–Fri 7:00 AM – 6:00 PM, closed County-designated holidays. Development Services Director: Scott Holtry. Chief Building Official: Trevor Bies. Contact form at https://forms.mohave.gov/Departments/Contact-Development-Services. Note: the Development Services/Building Division office is physically located at 3250 E. Kino Avenue — distinct from the Mohave County Administration Building at 700 W. Beale Street, which houses the Board of Supervisors and other county offices; both addresses appear in county materials and were independently cross-checked to confirm the Building Division's own location.
- Website
- Official site
Inspection guide
See how inspections work in Unincorporated Mohave County — sequence, scheduling & re-inspection fees.
Codes adopted
Arizona has no statewide building code for non-state buildings; codes are adopted locally. According to the International Code Council, codes are adopted locally in Arizona and are predominantly the I-codes, with different cities and counties choosing their own editions and local amendments. The Arizona State Fire Code (adopting the 2018 IFC) applies only to state and county buildings, public and private schools, and non-residential occupancies in areas without a locally adopted fire code — it does not establish a statewide residential or commercial building code floor. Each city and county adopts its own code editions independently, resulting in different I-Code years and amendment sets across jurisdictions. There is no state-mandated minimum edition; enforcement is entirely local. Always confirm the adopted edition and any local amendments with the specific jurisdiction before submitting plans.
- 2018 International Building Code (IBC) — adopted by Mohave County Ordinance No. 2021-03 (June 7, 2021), amended through July 15, 2024, for the unincorporated areas of the county per Resolution 2007-249 (adopted May 7, 2007)
- 2018 International Residential Code (IRC) — adopted by Ordinance 2021-03, with Appendices C, E, G, H, J, M, O, P, and Q (Tiny Houses)
- 2018 International Fire Code (IFC) — adopted by Ordinance 2021-03
- 2018 International Mechanical Code (IMC) — adopted by Ordinance 2021-03
- 2018 International Plumbing Code (IPC) — adopted by Ordinance 2021-03
- 2017 National Electrical Code (NEC), N.F.P.A. 70 — adopted by Ordinance 2021-03
- 2018 International Fuel Gas Code (IFGC) — adopted by Ordinance 2021-03
- 2018 International Existing Building Code (IEBC) — adopted by Ordinance 2021-03, with Appendix A (Seismic Retrofit Guidelines)
- 2018 International Property Maintenance Code (IPMC) — adopted by Ordinance 2021-03, with Appendix A (Boarding Standard)
- 2018 International Swimming Pool and Spa Code (ISPSC) — adopted by Ordinance 2021-03, with Arizona-specific barrier amendments citing A.R.S. § 36-1681
- 2018 International Energy Conservation Code (IECC) — adopted by Ordinance 2021-03; residential energy provisions are NOT taken from IECC but instead from IRC Chapter 11 (RE) Energy Efficiency, 2018 Edition
Permit types & fees
Residential Building Permit (New Construction, Addition, Accessory Structure)
Required for new single-family dwellings, additions, remodels, and most accessory structures in the unincorporated areas of Mohave County. The Mohave County Development Services Building Division enforces the 2018 IRC/IBC (Ordinance 2021-03) for all unincorporated county land outside the incorporated cities of Kingman, Bullhead City, Lake Havasu City, and Colorado City. An approved septic system is required before any permit involving plumbing is issued.
Commercial / Non-Residential Building Permit
Required for new commercial, industrial, and multi-family construction, tenant improvements, remodels, and change-of-use projects in the unincorporated areas of Mohave County. Enforced under the 2018 IBC (Ordinance 2021-03). Commercial applicants must show licensed-contractor information and bond-exemption status where applicable.
Electrical Permit
Required for electrical service installations, upgrades, and repairs in unincorporated Mohave County. Governed by the 2017 NEC as adopted by Ordinance 2021-03. Repairs/upgrades to residential services up to 200 amps are processed over the counter; each parcel is limited to one electric meter.
Plumbing / Mechanical Permit
Required for plumbing and mechanical (HVAC, gas appliance) installations in unincorporated Mohave County under the 2018 IPC/IMC/IFGC as adopted by Ordinance 2021-03. Gas piping systems and plumbing/electrical systems in accessory structures are only permitted where the structure has a permanent foundation. A dedicated gas-line inspection line is available.
Solar PV Permit (Residential and Non-Residential)
Required for photovoltaic (solar) system installations in unincorporated Mohave County. Fees are itemized under a dedicated solar fee ordinance (adopted October 2010) with area-based inspection charges reflecting travel distance across the county's very large service area. Solar construction must also comply with A.R.S. § 11-323.
Pool / Spa Permit (In-Ground and Above-Ground)
Required for swimming pools and spas in unincorporated Mohave County. A pool/spa is defined per A.R.S. § 36-1681.A (as adopted in ISPSC §202) as any contained body of water 18 inches or more deep at any point AND wider than 8 feet at any point. In-ground pool fees are valuation-based ($40.30/SF); above-ground pools are valued at $12.40/SF, with additional electric/plumbing fees possibly applying.
Fence / Block Wall / Retaining Wall Permit
Fences and block walls up to 7 feet in height (measured from the lowest adjacent property grade) are EXEMPT from a building permit in unincorporated Mohave County. Taller walls, and any wall serving as a pool barrier, require a permit; retaining walls over 4 feet are valuation-based, and walls over 7 feet require engineered, stamped plans.
Manufactured Home / Factory-Built Building Permit
Required for manufactured home and factory-built building installations in unincorporated Mohave County. The general Building Safety Code (2018 IBC/IRC) does NOT apply to manufactured home installation itself, except that electrical services and all attachments/affixtures must comply. A dedicated combined residential-and-manufactured-home permit timeframe (30 working days) is published.
Demolition Permit
Required for demolition of structures in unincorporated Mohave County. A flat $45.00 fee applies to residential demolition; commercial demolition requires written property-owner permission on file.
EV Charger / EVSE Permit
Mohave County does not publish a distinct EV charger/EVSE fee line. Installing electric vehicle charging equipment in unincorporated Mohave County requires a standard Electrical Permit under the adopted 2017 NEC (Ordinance 2021-03), billed under the county's itemized Unit Fee Schedule (Ordinance 2018-02): an Electrical Permit Issuance Fee plus per-item unit fees for the new circuit/receptacle and, if the installation requires a service upgrade, the applicable service-size fee tier. Residential service repairs/upgrades up to 200 amps — the typical case for a Level 2 EV charger — are processed over-the-counter without formal plan review.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-05)
- 61units
57 buildings · $13.6M valuation
- Trailing 12 months
- 1,167units
12 of 12 months reported · #12 in Arizona coverage by units
- Year to date (2026 YTD through 2026-05)
- 339units
332 buildings · $76.4M valuation
- Full year 2025
- 1,817units
1,733 buildings · $373.9M valuation
County-wide figures: BPS reports county-wide totals; jurisdiction is the unincorporated remainder — county totals include incorporated cities (Bullhead City, Lake Havasu City, Kingman, Colorado City) which are tracked as separate place-level jurisdictions in this KB. County FIPS 04/015 independently confirmed against U.S. Census Bureau 2020 AZ county reference file (st04_az_cou2020.txt: 'AZ|04|015|00042808|Mohave County|H1|A'), matching the FIPS already used in bullhead-city.json and kingman.json.
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Arizona building activity
Tips & gotchas
- Unincorporated Mohave County is administered directly by the Mohave County Development Services Building Division — this is distinct from the county's four incorporated cities (Kingman, Bullhead City, Lake Havasu City, Colorado City), each of which runs its own independent building department and code adoption under Arizona's per-jurisdiction code authority (A.R.S. Title 9/Title 11).
- Mohave County is one of the largest counties by land area in the continental United States, and its own fee schedule reflects this directly: solar inspection fees alone range from $41.32 near Kingman/Bullhead City/Lake Havasu to $323.56 for remote Planet Ranch, purely based on inspector travel distance across the unincorporated area's nine defined geographic zones.
- Fences and block walls up to 7 feet tall (measured from the lowest adjacent property grade) do not require any building permit at all — a notably permissive threshold. But a fence/wall serving as a pool barrier must still independently meet the 60-inch ISPSC barrier standard regardless of this general exemption, and manufactured-home skirting never counts as 'fencing' for the exemption.
- An approved septic system is a hard prerequisite for any permit involving plumbing — this is a separate approval track (Environmental Health/Septic & Well Permitting) that can be slower than the building permit itself; start it early.
- Properties in 'the Strip' (the portion of Mohave County north of the Grand Canyon, physically separated from the rest of the county) must submit three sets of plans instead of the standard two for building, steel/engineered accessory structures, and non-prescriptive engineered designs.
- CORRECTED 2026-07-13: the county publishes TWO dedicated review-timeframe documents, not one. The '1- and 2-Family Residential and Manufactured Home Permit Time Frames' document (Administrative Completeness 10 working days + Substantive Review 20 working days = 30 working days combined, per A.R.S. §§ 11-1604/11-1605) covers residential and manufactured-home permits. A separate document, 'Licensing Time Frames for Commercial-Multiple Family Residential-Industrial Applications' (Management Practice B-2012-001), covers commercial building permits: Administrative Completeness 10 working days + Substantive Review 35 working days = 45 working days combined. No dedicated timeframe document was found for electrical/plumbing/mechanical-only, solar, pool, fence, or demolition permits — those permit types still carry a documented reviewTimelineNote rather than a fabricated estimate, per this project's zero-tolerance verified bar.
- AFCI (arc-fault circuit interrupter) protection has been relaxed from mandatory to optional for most one- and two-family dwelling branch circuits under local NEC/IRC amendments — EXCEPT bedroom circuits, which remain mandatory. Several other 2017 NEC/2018 IRC electrical safety provisions (tamper-resistant receptacles, GFCI on dishwashers/laundry outlets) are similarly relaxed to 'may' rather than 'shall' — verify current requirements rather than assuming the stricter national-code default applies.
- Plumbing, gas piping, and electrical systems are only allowed in structures with PERMANENT foundations under Mohave County's local amendments — auger-type tie-downs or similar anchoring do not qualify, even though the same local amendments allow light-frame accessory structures (like sheds) to sit on pressure-treated skids for structural purposes alone.
- A Standardized Plan Review program exists for both residential building plans and solar installations — repeat/production builders who register a design once receive a steeply reduced review fee (10% of the permit fee for residential; $15.00 flat for solar) on every subsequent identical submittal, valid until the next code adoption cycle.
- Mohave County offers a fee waiver for low-to-moderate-income single-family housing built by volunteer labor under a County-approved nonprofit, provided the home isn't rented, leased, or sold within one year of the Certificate of Occupancy — a notable affordability provision not commonly found in Arizona county fee ordinances.
- A Building Permit Amnesty program exists for structures built before December 31, 2007 without a required zoning permit, provided the applicant can document the construction date and ownership at the time — useful for legalizing legacy unpermitted structures uncovered during a sale, refinance, or title search.
- The Building Division's physical office (3250 E. Kino Avenue, Kingman) is a different address than the Mohave County Administration Building (700 W. Beale Street, Kingman) that houses the Board of Supervisors — both addresses appear across county web materials, so confirm you're headed to the correct building before an in-person visit.
- Mohave County independently adopted the full 2018 ICC code suite (including the International Property Maintenance Code and International Swimming Pool and Spa Code, both less commonly adopted county-wide) plus the 2017 NEC — one edition cycle behind jurisdictions that have moved to 2024 codes, consistent with the adoption cycle seen at Bullhead City within the same county.
- CLOSED 2026-07-23: no published county timeframe document has ever existed for standalone electrical/plumbing/mechanical trade permits (confirmed via a Wayback CDX scan of the Building Division's entire archived /documents/ history), and the county's own 'Licensing Time Frames & Exceptions - Brochure C' page explains why — it quotes A.R.S. §11-1605(K) verbatim: permits 'issued within seven working days after receipt of the initial application' are exempt from the state's licensing-timeframe-disclosure statute. Since standalone electrical/plumbing/mechanical permits are typically issued over-the-counter/same-day, they fall outside the statute's disclosure requirement entirely, unlike the plan-review-heavy residential (30 working days) and commercial (45 working days) building-permit categories, which ARE subject to §11-1605 and do carry published SLAs.