Manufactured Home / Factory-Built Building Permit — Unincorporated Mohave County, Arizona · Requirements sheet
Verified 2026-07-07 · Source: https://www.mohave.gov/departments/development-services/building-division/documents/1-and-2-family-residential-and-manufactured-home-permit-time-frames/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Manufactured Home / Factory-Built Building Permit in Unincorporated Mohave County, Arizona
Required for manufactured home and factory-built building installations in unincorporated Mohave County. The general Building Safety Code (2018 IBC/IRC) does NOT apply to manufactured home installation itself, except that electrical services and all attachments/affixtures must comply. A dedicated combined residential-and-manufactured-home permit timeframe (30 working days) is published.
Verified 2026-07-07 · Source
When you need this permit
- Building Safety Code does not apply to manufactured home installation EXCEPT that electrical services and all attachments/affixtures must comply with the Code (Ordinance 2021-03, Section 3(E))
- Manufactured home additions are valued at $55.80/SF under the county fee schedule (same rate category as dwelling additions)
- Manufactured home block skirting is not considered 'fencing' and does not qualify for the general 7-foot fence exemption
- Electrical installation for manufactured homes requires its own permit
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Service / Attachment Inspection
Verify electrical service and all attachments/affixtures comply with 2017 NEC and adopted codes per Ordinance 2021-03 Section 3(E)
- 2
Final
Installation complete and compliant; Certificate of Occupancy issued where applicable
See the full Unincorporated Mohave County inspection guide — scheduling & re-inspection fees →
Tips
- The manufactured home structure itself is exempt from the county's general Building Safety Code — but the electrical service, and any attachments or affixtures (decks, ramadas, skirting hardware, etc.) you add, are NOT exempt and must be separately permitted and inspected.
- The county's published '1- and 2-Family Residential and Manufactured Home Permit Time Frames' document groups manufactured homes with standard residential review (30 working days combined) — this is the applicable timeframe for the parts of a manufactured-home project that do require Building Division review.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Mohave County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Mohave County
Manufactured Home / Factory-Built Building Permit in other cities
Compare manufactured home / factory-built building permit fees across Arizona →
Look up this fee in a different city →