Manufactured Home / Park Model Permit in City of Globe, Arizona
Required for placement of manufactured homes, park models, and factory-built buildings in Globe, per IRC Appendix AE (Manufactured Housing Used As Dwellings) as adopted and amended by the City. Statewide construction/installation standards for the factory-built structure itself are separately regulated by the Arizona Department of Fire, Building and Life Safety (Office of Manufactured Housing).
Verified 2026-07-06 · Source
When you need this permit
- City permit required for site placement, foundation/ground set, skirting/perimeter enclosure, and utility (electrical, water/sewer) connections
- Skirting and permanent perimeter enclosures are required; skirting must be installed per the manufacturer's instructions and IRC requirements as adopted by the City, secured to minimize vibration/wind damage and compensate for frost heave
- Permanent perimeter enclosures must be constructed of materials meeting regular foundation-construction code requirements
- Fee structure is explicitly 'Based on ADOH fees' (Arizona Department of Housing / Office of Manufactured Housing) per the City's fee schedule
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Ground Set/Foundation/Stem Wall
Verifies anchoring, foundation, and stem wall installation per manufacturer instructions and adopted IRC requirements
- 2
Electrical/Utility Connection
Verifies electrical panel, installation, and water/sewer connections
- 3
Final
Skirting and perimeter enclosure verified complete
See the full City of Globe inspection guide — scheduling & re-inspection fees →
Tips
- The City of Globe's Plan Submittal and Review page publishes a real 15-working-day residential plan review timeframe, which applies to manufactured home / park model permits requiring plan review. Source: City of Globe Plan Submittal and Review page (globeaz.gov/o/cog/page/plan-submittal-and-review).
- Manufactured home fees are explicitly described as 'Based on ADOH fees' in the City's fee schedule, tying them to the Arizona Department of Housing's factory-built-structure fee framework rather than the general ICC valuation table.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-06.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the City of Globe building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in City of Globe
Manufactured Home / Park Model Permit in other cities
Compare manufactured home / park model permit fees across Arizona →